Backbone — Part D/Section 6
Backbone Cabling Media Distribution and Building Pathway — Part D/Section 6
Back Fill — Part C/Section 2
Back Pressure Backflow — Part E/Section 1
Back Siphonage — Part E/Section 1
Back Up — Part E/Section 2
Back-up Protection — Part D/Section 2
Back Water Valve — Part E/Section 2
Backflow — Part E/Section 1
Backflow Prevention Device — Part E/Section 1
Background Noise — Part D/Section 4
Balancing Weight — Part D/Section 5A
Balustrade — Part C/Section 8, Part D/Section 5B
Balustrade Decking — Part D/Section 5B
Bamboo — Part C/Section 3B
Bamboo Bore/GHOON Hole — Part C/Section 3B
Bamboo Clump — Part C/Section 3B
Bamboo Culm — Part C/Section 3B
Bamboo Mat Board — Part C/Section 3B
Bamboo Mat Corrugated Sheets — Part C/ Section 3B
Bamboo Mat Corrugated Sheet — Part C/Section 3B
Bamboo Mat Ridge Cap (BMRC) — Part C/Section 3B
Bamboo Mat Veneer Composite — Part C/Section 3B
Barrel — Part E/Section 1
Barrier — Part D/Section 2
Base — Part C/Section 1, Part E/Section 1
Base Layer — Part C/Section 7
Basic Protection — Part D/Section 2
Basic Module — Part C/Section 7
Bath Room Group — Part E/Section 1, Part E/ Section 2
Bather Load — Part E/Section 1
Batter Pile (Raker Pile) — Part C/Section 2
Battery Charging Stations — Part D/Section 2
Battery Energy Storage System (BESS) Part D/ Section 2
Battery of Fixtures — Part E/Sction 2
Beads or Glazing Beads — Part C/Section 8
Beam — Part C/Section 3B, Part C/Section 6A
Beam, Built-Up-Laminated — Part C/Section 3A
Beam, Glued-Laminated — Part C/Section 3A
Bearing Capacity, Safe — Part C/Section 2
Bearing Capacity, Ultimate — Part C/Section 2
Bearing Pressure, Allowable (Gross or Net) — Part C/Section 2
Bearing Type Connection — Part C/Section 6A
Bed Block — Part C/Section 4
Bed Pan Washer — Part E/Section 2
Bedding — Part E/Section 1
Benching — Part E/Section 2
Binder Jetting-based 3D Printing — Part C/Section 7
Bite — Part C/Section 8
Biodegradable Substance — Part E/Section 3
Biomethanation — Part E/Section 3
Black Water — Part E/Section 2
Block (Setting Block) — Part C/Section 8
Bond — Part C/Section 4 Section 7
Bonding Conductor — Part D/Section 2
Bonding Ring Conductor (BRC) — Part D/Section 2
Bored Cast In-situ Pile — Part C/Section 2
Bored Compaction Pile — Part C/Section 2
Bored Pile — Part C/Section 2
Bottom Car Clearance — Part D/Section 5A
Bottom Car Run-by — Part D/Section 5A
Bottom Counterweight Run-by — Part D/Section 5A
Bottom Refuge Space — Part D/Section 5A
Box System — Part C/Section 4
Braced Member — Part C/Section 6A
Brake Load — Part D/Section 5B
Branch — Part E/Section 2
Branch Soil Pipe (BSP) — Part E/Section 2
Branch Soil Waste Pipe (BSWP) — Part E/Section 2
Branch Switch — Part D/Section 2
Branch Vent Pipe (BVP) — Part E/Section 2
Branch Waste Pipe (BWP) — Part E/Section 2
Breadth — Part C/Section 1
Break-In — Part D/Section 4
Breaking Strength — Part C/Section 3B
Break-Out — Part D/Section 4
Bressummer — Part C/Section 3A
Brightness Ratio or Contrast — Part D/Section 1
Brittle Cladding — Part C/Section 6A
Broad Band Noise — Part D/Section 4
Buckling Load — Part C/Section 6A
Buckling Strength or Resistance — Part C/Section 6A
Buffer — Part D/Section 5A
Building — Part A, Part F
Building, Height of — Part A, Part F
Building Drain-Combined — Part E/Section 2
Building Drain-Sanitary — Part E/Section 2
Building Drain-Storm — Part E/Section 2
Building Trap — Part E/Section 2
Building Energy Simulation (BES) — Part F,
Part D/Section 3
Buildability — Part C/Section 7
Building Height — Part C/Section 5
Building Integrated Renewable Energy —
Part D/Section 3
Building Line — Part A
Building Official — Part A
Building Permit — Part A
Building Sewer — Part E/Section 2
Building Sub-drain — Part E/Section 2
Building Management System (BMS) —
Part D/Section 3, Part D/Section 6, Part F
Building Related Illnesses — Part D, Section 3, Part F
Built-up Section — Part C/Section 6A, Part C/
Section 6B
Bunched — Part D/Section 2
Bundle-Column — Part C/Section 3B
Burried Direct — Part D/Section 2
Bus Bar — Part D/Section 6
Busbar Trunking System — Part D/Section 2
Business Buildings — Part C/Section 1
Buttress — Part C/Section 4
Bypass Equipotential Bonding Conductor — Part D/Section 2