a) Devices that are interrelated with the emergency ventilation system and that are required to meet the emergency ventilation system airflow should be structurally capable of withstanding both maximum repetitive and additive piston pressure of moving trains and emergency airflow velocities.
b) Devices in the emergency ventilation system that are exposed to the exhaust airflow and are critical to the system's effective functioning in the event of an emergency should be constructed of materials suitable for operation in an ambient atmosphere at the design condition of 250 °C for 2 h.
c) Finishes applied to non-combustible devices should not be required to meet the provisions of J-6.5(b)
d) Other devices should be designed to operate throughout the anticipated temperature range. Over current elements in devices or on device controls required to support the emergency ventilation should not be permitted where such over current elements are subject to false operation due to exposure to elevated temperatures during a fire emergency.
K-6.6 Testing
a) Equipment used for emergency ventilation (including fans, dampers and airflow control devices and associated electrical equipment) should be approved in accordance with the requirements of a recognized standard for the type of equipment to be installed and should be factory acceptance tested.
b) The non-fire (or cold) airflows provided by the installed mechanical ventilation system should be measured during commissioning to confirm that the airflow meets the requirement determined by the engineering analysis.
L-6.7 Emergency Ventilation Openings
a) Emergency ventilation openings should be positioned or designed to minimize recirculation of smoke into the station or enclosed trainway through any openings, such that a tenable environment is maintained along the path of egress for the time of tenability and as required for designated points of safety.
b) Adjacent structures and property uses should also be considered.
M-6.8 Emergency Ventilation System
a) Operation of the emergency ventilation system should be initiated from the operations control centre.
b) The operations control centre should receive verification of proper response by emergency ventilation fan(s) and an interrelated device(s).
c) Local controls should be permitted to override the operations control centre becomes inoperative or where the operation of the emergency ventilation system is specifically redirected to another site.