The design should encompass the following:
a) The heat release rate from a vehicle and any other combustible materials (if permitted) in the trainways that could contribute to the fire load at the incident site, subject to the approval of the Metro Rail Administration;
b) The rate of fire growth
c) Fire scenarios and fire profiles.
d) Station and trainway geometries.
e) The effects of elevation, elevation differences, ambient temperature differences and ambient wind.
f) A system of fans, shaft and devices for directing airflow in stations and trainways.
g) Predetermined procedures for initiating quick response from the OCC/SCR during fire.
h) A ventilation system reliability engineering analysis that, as a minimum considers the following subsystems:
-
Electrical;
-
Mechanical; and
-
Supervisory control.
j) Criteria for the system reliability analysis in 6.3.2 (h) should be established and approved.
k) The analysis should consider as a minimum of the following events:
-
Fire in the trainway or station;
-
Local incident within the electrical utility that interrupts power to the emergency ventilation system;
-
Derailment; and
-
The loss of a fan that results in the most adverse effect on the ventilation system performance.
J-6.3.3 The design and operation of the signalling system, and ventilation system should be coordinated to match the total number of trains that could be between ventilation shafts during an emergency.
J-6.3.4 Emergency ventilation air distribution system should be permitted to serve more than one trainway.