| Table 7C Requirements for Firefighting Installations – For Institutional Buildings[ Clauses 4.9 (a), 4.9 (c), 4.9(e), 5.1.1 (a), 5.1.1(d), 5.1.2.1, 5.1.3 (a), D-6.1, G-2(f) and Table 31 ] | Table 7C Requirements for Firefighting Installations – For Institutional Buildings[ Clauses 4.9 (a), 4.9 (c), 4.9(e), 5.1.1 (a), 5.1.1(d), 5.1.2.1, 5.1.3 (a), D-6.1, G-2(f) and Table 31 ] | Table 7C Requirements for Firefighting Installations – For Institutional Buildings[ Clauses 4.9 (a), 4.9 (c), 4.9(e), 5.1.1 (a), 5.1.1(d), 5.1.2.1, 5.1.3 (a), D-6.1, G-2(f) and Table 31 ] | Table 7C Requirements for Firefighting Installations – For Institutional Buildings[ Clauses 4.9 (a), 4.9 (c), 4.9(e), 5.1.1 (a), 5.1.1(d), 5.1.2.1, 5.1.3 (a), D-6.1, G-2(f) and Table 31 ] | Table 7C Requirements for Firefighting Installations – For Institutional Buildings[ Clauses 4.9 (a), 4.9 (c), 4.9(e), 5.1.1 (a), 5.1.1(d), 5.1.2.1, 5.1.3 (a), D-6.1, G-2(f) and Table 31 ] | Table 7C Requirements for Firefighting Installations – For Institutional Buildings[ Clauses 4.9 (a), 4.9 (c), 4.9(e), 5.1.1 (a), 5.1.1(d), 5.1.2.1, 5.1.3 (a), D-6.1, G-2(f) and Table 31 ] | Table 7C Requirements for Firefighting Installations – For Institutional Buildings[ Clauses 4.9 (a), 4.9 (c), 4.9(e), 5.1.1 (a), 5.1.1(d), 5.1.2.1, 5.1.3 (a), D-6.1, G-2(f) and Table 31 ] | Table 7C Requirements for Firefighting Installations – For Institutional Buildings[ Clauses 4.9 (a), 4.9 (c), 4.9(e), 5.1.1 (a), 5.1.1(d), 5.1.2.1, 5.1.3 (a), D-6.1, G-2(f) and Table 31 ] | Table 7C Requirements for Firefighting Installations – For Institutional Buildings[ Clauses 4.9 (a), 4.9 (c), 4.9(e), 5.1.1 (a), 5.1.1(d), 5.1.2.1, 5.1.3 (a), D-6.1, G-2(f) and Table 31 ] | Table 7C Requirements for Firefighting Installations – For Institutional Buildings[ Clauses 4.9 (a), 4.9 (c), 4.9(e), 5.1.1 (a), 5.1.1(d), 5.1.2.1, 5.1.3 (a), D-6.1, G-2(f) and Table 31 ] | Table 7C Requirements for Firefighting Installations – For Institutional Buildings[ Clauses 4.9 (a), 4.9 (c), 4.9(e), 5.1.1 (a), 5.1.1(d), 5.1.2.1, 5.1.3 (a), D-6.1, G-2(f) and Table 31 ] |
| Sl No. | Type of Building Occupancy | Type of Installation | Type of Installation | Type of Installation | Type of Installation | Type of Installation | Type of Installation | Type of Installation | Type of Installation | Type of Installation |
| Sl No. | Type of Building Occupancy | Fire Extinguisher | First Aid Hose Reel | Down comer | Wet Riser | Yard Hydrant | Automatic Wet Sprinkler System | Automatic Detection and Alarm System | Public Address and Voice Evacuation System | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| INSTITUTIONAL BUILDINGS (C) | INSTITUTIONAL BUILDINGS (C) | INSTITUTIONAL BUILDINGS (C) | INSTITUTIONAL BUILDINGS (C) | INSTITUTIONAL BUILDINGS (C) | INSTITUTIONAL BUILDINGS (C) | INSTITUTIONAL BUILDINGS (C) | INSTITUTIONAL BUILDINGS (C) | INSTITUTIONAL BUILDINGS (C) | INSTITUTIONAL BUILDINGS (C) |
| a) | Nursing homes and sanatoria | Up to 500 m² area and up to 24 m height (both conditions to be met), self-certification by a certified and state approved building professional should be treated acceptable | Up to 500 m² area and up to 24 m height (both conditions to be met), self-certification by a certified and state approved building professional should be treated acceptable | Up to 500 m² area and up to 24 m height (both conditions to be met), self-certification by a certified and state approved building professional should be treated acceptable | Up to 500 m² area and up to 24 m height (both conditions to be met), self-certification by a certified and state approved building professional should be treated acceptable | Up to 500 m² area and up to 24 m height (both conditions to be met), self-certification by a certified and state approved building professional should be treated acceptable | Up to 500 m² area and up to 24 m height (both conditions to be met), self-certification by a certified and state approved building professional should be treated acceptable | Up to 500 m² area and up to 24 m height (both conditions to be met), self-certification by a certified and state approved building professional should be treated acceptable | Up to 500 m² area and up to 24 m height (both conditions to be met), self-certification by a certified and state approved building professional should be treated acceptable | Up to 500 m² area and up to 24 m height (both conditions to be met), self-certification by a certified and state approved building professional should be treated acceptable |
| i) | (see Note 1)Building height above 15 m;and, for heights up to 15 m, and area 501 m² and above(HL-3)See Notes 1, 2, 4, 6 and 9 | R | R | R | NR | NR | NR | R | NR | |
| b) | Hospitals (C-I) | Up to 500 m² area and up to 24 m height (both conditions to be met), self-certification by a Certified and State Approved building professional should be treated acceptable | Up to 500 m² area and up to 24 m height (both conditions to be met), self-certification by a Certified and State Approved building professional should be treated acceptable | Up to 500 m² area and up to 24 m height (both conditions to be met), self-certification by a Certified and State Approved building professional should be treated acceptable | Up to 500 m² area and up to 24 m height (both conditions to be met), self-certification by a Certified and State Approved building professional should be treated acceptable | Up to 500 m² area and up to 24 m height (both conditions to be met), self-certification by a Certified and State Approved building professional should be treated acceptable | Up to 500 m² area and up to 24 m height (both conditions to be met), self-certification by a Certified and State Approved building professional should be treated acceptable | Up to 500 m² area and up to 24 m height (both conditions to be met), self-certification by a Certified and State Approved building professional should be treated acceptable | Up to 500 m² area and up to 24 m height (both conditions to be met), self-certification by a Certified and State Approved building professional should be treated acceptable | Up to 500 m² area and up to 24 m height (both conditions to be met), self-certification by a Certified and State Approved building professional should be treated acceptable |
| 1) | For heights not exceeding 45 m in height | | | | | | | | | |
| Table 7C (Continued) | Table 7C (Continued) | Table 7C (Continued) | Table 7C (Continued) | Table 7C (Continued) | Table 7C (Continued) | Table 7C (Continued) | Table 7C (Continued) | Table 7C (Continued) | Table 7C (Continued) | Table 7C (Continued) |
| Sl No. | Type of Building Occupancy | Type of Installation | Type of Installation | Type of Installation | Type of Installation | Type of Installation | Type of Installation | Type of Installation | Type of Installation | Type of Installation |
| Sl No. | Type of Building Occupancy | Fire Extinguisher | First Aid Hose Reel | Down comer | Wet Riser | Yard Hydrant | Automatic Wet Sprinkler System | Automatic Detection and Alarm System | Public Address and Voice Evacuation System | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| i) | 501 m² to 1 000 m² (CL-3)See Notes 2, 4, 6, 7, 9 and 10 | R | R | NR | R | R | R | R | NR | |
| ii) | Above 1 001 m² (CL-4)See Notes 2, 4, 6, 7, 9 and 10 | R | R | NR | R | R | R | R | R | |
| 2) | Above 45 m but not exceeding 60 m in height(CL-5)See Notes 4, 6, 7, 9 and 10 | R | R | NR | R | R | R | R | R | |
| 3) | Above 60 m – See Note 3 | Above 60 m – See Note 3 | Above 60 m – See Note 3 | Above 60 m – See Note 3 | Above 60 m – See Note 3 | Above 60 m – See Note 3 | Above 60 m – See Note 3 | Above 60 m – See Note 3 | Above 60 m – See Note 3 | Above 60 m – See Note 3 |
| b) | Custodial, Penal and Mental Institutions (C-II and III) | Up to 500 m² area and up to 24 m height (both conditions to be met), self-certification by a Certified and State Approved building professional should be treated acceptable | Up to 500 m² area and up to 24 m height (both conditions to be met), self-certification by a Certified and State Approved building professional should be treated acceptable | Up to 500 m² area and up to 24 m height (both conditions to be met), self-certification by a Certified and State Approved building professional should be treated acceptable | Up to 500 m² area and up to 24 m height (both conditions to be met), self-certification by a Certified and State Approved building professional should be treated acceptable | Up to 500 m² area and up to 24 m height (both conditions to be met), self-certification by a Certified and State Approved building professional should be treated acceptable | Up to 500 m² area and up to 24 m height (both conditions to be met), self-certification by a Certified and State Approved building professional should be treated acceptable | Up to 500 m² area and up to 24 m height (both conditions to be met), self-certification by a Certified and State Approved building professional should be treated acceptable | Up to 500 m² area and up to 24 m height (both conditions to be met), self-certification by a Certified and State Approved building professional should be treated acceptable | Up to 500 m² area and up to 24 m height (both conditions to be met), self-certification by a Certified and State Approved building professional should be treated acceptable |