For the purpose of this Part, the following definitions will apply.
2.1 Assisted Evacuation — Strategy that exists during which a designated person or persons provide assistance, during an emergency, to another person(s) to leave a building or a specific part of the built environment and to reach a final place of safety.
2.2 Atrium — A large-volume space created by a floor opening or series of floor openings connecting two or more stories that is covered at the top of the series of openings and is used for purposes other than an enclosed stairway; lifts hoist-way; an escalator opening; or as a utility shaft used for plumbing, electrical, air conditioning, or communications facilities.
2.3 Authorities Concerned (known as Authority Having Jurisdiction) — An organization, office, or individual responsible for enforcing the requirements of a Code or standard, or for approving or accepting equipment, materials, an installation, or a procedure.
2.4 Automatic Fire Detection and Alarm System — A system comprising components and sub-systems required for automatically detecting smoke, heat or fire initiating an alarm and other actions as appropriate. This system also includes manually operated electronic fire alarm (MOEFA) system.
NOTE — MOEFA system (with or without automatic fire detection and alarm system) includes all or some of the components such as manual call stations (initiating an alarm for fire and other actions as required), talk-back system and public address system.
2.5 Building — Any structure for whatsoever purpose and of whatsoever materials constructed and every part thereof whether used as human habitation or not and includes foundation, plinth, walls, floors, roofs, chimneys, plumbing and building services, fixed platforms, veranda, balcony, cornice or projection, part of a building or anything affixed thereto, or any wall enclosing or intended to enclose any land or space and signs and outdoor display structures. Tents, Shamianahs, tarpaulin shelters, etc erected for temporary and ceremonial occasions with the permission of the Authority should not be considered as building.
2.6 Building, Height of — For the purposes of fire safety, the height of the multistoried building may be measured up to the floor level of the last occupiable floor from the grade level (where the fire tender/rescue vehicle will be located). In cases when the building height is measured up to the roof of the top-most floor, the following depictions may be considered. See Fig. 1.

2.7 Combustible Material — A material which either burns itself or adds heat to a fire, when tested for non-combustibility in accordance with accepted standard [F(1)].
2.8 Common Path of Travel — That portion of the exit access which the occupants are required to traverse before two (or more) separate and distinct routes to two (or more) exits become available. Common paths of travel are part of the travel distance. See Fig. 2.

FIG. 2 COMMON PATH OF TRAVEL (A TO C) AND DEAD END (C TO B)
2.9 Covered Area (also Built-up Area)— Ground area covered by the building immediately above the plinth level. The area covered by the following in the open spaces is excluded from covered area:
a) Garden, rockery, well and well structures, plant nursery, water pool, swimming pool (if uncovered), platform a round a tree, tank, fountain, bench, Chabutara with open top and unenclosed on sides by walls and the like;
b) Drainage culvert, conduit, catch-pit, gully pit, chamber, gutter, and the like;
c) Compound wall, gate, unstoreyed porch and portico, slide, swing, uncovered staircases, ramp areas covered by Chhajja and the like; and
d) Watchman's booth, pump house, garbage shaft, electric cabin or substations, and such other utility structures meant for the services of the building under consideration.
NOTE — For the purpose of this Part, covered area equals the plot area minus the area due for open spaces in the plot.
2.10 Down-comer — An arrangement of firefighting within the building by means of down-comer pipe connected to terrace tank through terrace pump, gate valve and non-return valve and having mains not less than 100 mm internal diameter with landing valves on each floor/landing. It is also fitted with inlet connections at ground level for charging with water by pumping from fire service appliances and air release valve at roof level to release trapped air inside.
2.11 Dry Riser — An arrangement of firefighting within the building by means of vertical rising mains not less than 100 mm internal diameter with landing valves on each floor/landing which is normally dry but is capable of being charged with water usually by pumping from fire service appliances.
2.12 Emergency Lighting — Lighting provided for use when the supply to the normal lighting fails.
2.13 Emergency Lighting System — A complete but discrete emergency lighting installation also fed from the standby power source to the emergency lighting lamp(s), for example, self-contained emergency luminaire or a circuit from central battery (with or without monitoring system) connected through wiring to several escape lighting luminaries.
2.14 Escape Lighting — That part of the emergency lighting which is provided to ensure that the escape route is illuminated at all material times, for example, at all times when persons are on the premises, or at times the main lighting is not available, either for the whole building or for the means of egress.
2.15 Evacuation Lift — Lift that can be used, during an emergency, for self-evacuation.
2.16 Fire Exit — That unobstructed component of means of egress which is between the exit access and the exit discharge or public way. Exit components include exterior exit doors at the level of exit discharge, interior exit stairways (pressurised), exit stairway with external wall (pressurized or natural ventilated), exterior exit stairways, exit passageways, and exterior exit ramps (see Fig. 3). Fire exits should be provided with panic bar as applicable to facilitate entry of occupant into it.

2.17 Exit Access — That portion of a means of egress that leads to fire exit (for example, habitable floor area, doorways, staircase lobby, ramps, veranda, corridor, or passageway leading to an exit) (see Fig. 3).
2.18 Exit Access Corridor — A corridor in exit access which may not necessarily have the requirement of exits being met.
2.19 Exit Discharge — The component of a means of egress between the termination of an exit and a public way (see Fig. 3).
2.20 Fire Barrier (or Fire Resisting Barrier) — A fire barrier is a vertically or horizontally aligned member such as a wall or a fire curtain, or a floor. These may be with discontinuities created by openings with a specified fire resistance rating, where such members are designed and constructed with a specified fire resistance rating to limit the spread of fire that also restricts the movement of smoke.
2.21 Fire Compartment — A space within a building that is enclosed by fire barrier or fire resistant walls on all sides, including the top and bottom.
2.22 Fire Door and Fire Door Assembly — Any combination of fire door, frame, hardware and other accessories that together provide a specific fire resistant rating to the opening in terms of its stability, integrity and insulation properties, when installed in the openings in fire separation walls. Fire door {see accepted standard [F(33)]} is a component of fire door assembly.
NOTES
1 Wherever reference has been made to fire door or fire check door in this Part, the same should be construed as fire door assembly.
2 Fire doors in exits should have fire rating as required in this Part to meet the requirement of integrity and stability; and the minimum insulation criteria should be 30 min.
3 Fire doors in exits should be provided with intumescent seal or such other globally accepted technologies/ devices (that expand upon contact with heat/hot gases, thereby forming an effective seal and aiding in integrity).
4 Fire doors in exits should not be allowed to be on hold open position and kept closed and to close by 'door closure - spring mechanism'.
5 Fire curtains should not be allowed as fire exits. If so provided for compartmentation, independent fire door should be provided meeting the requirement for fire door in exits as above (of the width as required) within the prescribed travel distance requirement.
6 Fire doors provided with panic bar should also be provided with the door handle on the other side on those levels to permit re-entry in designated floors.
2.23 Exit — A way out leading from exit access towards fire exit (fire exit is basically a protected staircase, see 2.16). Exits not leading to fire exits should be displayed with signage as ‘NOT A FIRE EXIT’.
2.24 Firefighting Shaft (Fire Tower) — An enclosed shaft having a protected area of 120 min fire resistance rating comprising a protected lobby, staircase, and fireman's lift, connected directly to the exit discharge or
through an exit passageway with 120 min fire resistant wall at the level of exit discharge to exit discharge. These should also serve the purpose of exit requirement/strategy for the occupants. The lobby space should have arrangement to accommodate minimum two wheel chairs, and a minimum specified area for respective occupancy. The respective floors should be approachable from firefighting shaft enabling the fire fighters to access the floor and also enabling the fire fighters to assist in evacuation through fireman's lift. The firefighting shaft should be equipped with 120 min fire doors. The firefighting shaft should be equipped with firemen talk back, wet riser and landing valve in its lobby, to fight fire by fire fighters (see Fig. 4 for a typical firefighting shaft).

FIG. 4 TYPICAL FIREFIGHTING SHAFT
2.25 Fire Load — The total amount of energy that could be released during a fire in a given compartment, floor or building; usually expressed in Mega Joules (MJ) (or equivalent units).
2.26 Fire Load Density — Fire load per unit area of the compartment, floor or building concerned. It is obtained by dividing the fire load by the floor area of the concerned compartment, floor or building. It is usually expressed in megajoule (MJ) per m2, or equivalent units with respect to wood, as below:
| Sl No. | Building Type | Fire Load Density(Expressed as Wood Equivalent kg/m2) |
|---|---|---|
| (1) | (2) | (3) |
| i) | Residential (A) | 25 |
| ii) | Institutional (B) and Educational (C) | 25 |
| iii) | Assembly (D) | 25 to 50 |
| iv) | Business (E) | 25 to 50 |
| v) | Mercantile (F) | Up to 250 |
| vi) | Industrial (G) | Up to 150 |
| vii) | Storage (H) and Hazardous (J) | Up to 500 |
2.27 Fireman’s Lift — A lift or a group of lifts invariably associated with all the features and requirements of a firefighting shaft. Such lift(s) are installed to enable fire services personnel to reach different floors with minimum delay, and meets the additional features as required in accordance with this Part. This lift also serves the purpose of meeting the requirement of evacuation lift for assisted evacuation.
NOTES
1 Lifts in firefighting shaft and fireman’s lift are required to go to basements and the lobby should be pressurized.
2 Regular lifts serving floors above should terminate at the level of exit discharge. Lifts serving basements should be separate. In the case of lift bank, it is preferred to have all the lifts as fireman’s lift instead of one or few lifts.
3 Lifts in the firefighting shaft should reach the terrace level, in the case of habitable spaces in terrace.
2.28 Fire Resistance — Fire resistance is a property of an element of building construction and is the measure of its ability to satisfy for a stated period, some, or all of the following criteria:
a) Load bearing capacity (Stability) (R) – The ability of a load bearing element to withstand fire exposure without any loss of structural stability.
b) Integrity (E) – Resistance to penetration of flame and hot gases.
c) Insulation (I) – Resistance to temperature rise on the unexposed face up to a maximum of 180 °C at any single point and average temperature of 140 °C.
NOTE — Radiation (W) can be used as one of the criteria for glass used in building, which refers to the ability to resist the passage of heat from one side to another.
2.29 Fire Resistance Rating — The time that a material or construction will withstand the standard fire exposure as determined by fire test done in accordance with the standard methods of fire tests of materials/structures as per the accepted standard [F(2)].
NOTES
1 The requirement of rating of various building elements as given in this Part should be applicable in accordance with the provisions given in the accepted standard [F(2)].
2 The fire resistance rating should be specified in terms of minutes.
3 Fire resistance rating for non-structural material/assembly should bear a label of compliance to such rating as per the approval of competent authority based on testing and evaluation. The label should be permanently affixed to the material/assembly and may carry other relevant details such as name and type of the product, and manufacturer's details.
2.30 Fire Resistant Wall — Fire resistance rated wall, having opening(s) with specified fire resistant rating, which restricts the spread of fire from one part of a building to another part of the same building.
2.31 Fire Separation — The distance in metre, measured from the external wall of the building concerned to the external wall of any other building on the site, or from other site, or from the opposite side of street or other public space for the purpose of preventing the spread of fire.
2.32 Fire Stop — A fire resistant material, or construction, having a fire resistance rating of not less than the fire separating elements, installed in concealed spaces or between structural elements of a building to prevent the spread/propagation of fire and smoke through walls, ceilings, and the like as per the laid down criteria. See accepted standard [F(34)].
NOTES
1 Fire stop assembly for through penetrations is a combination of firestop compatible for use with the penetrant, penetration items such as cables, cable tray, conduits, ducts, pipes, etc, and their means of support through the wall or opening that together restores the fire resistance rating of the fire separating elements in terms of its integrity and/or insulation properties.
2 Fire stop assembly for joints is the one where fire stop with movement capability is used to seal the linear joints between adjacent fire separating elements, to maintain the fire resistance of the separating elements, which should be installed within its tested design limits with regard to size of the joint, type of assembly, and anticipated compression and extension of the joint.