a) For stand-alone open metro stations, exclusive water requirement for the fire protection system for the installed pumping capacity, as stated in H-10.1.1 should be at least 50 000 litre.
b) However, when commercial areas are present within open metro stations, firefighting facilities should need augmentation as in H-10.1.9.
H-10.1.9 In case of other types of occupancy like commercial areas inside metro stations and combustible storage areas, if any, within open stations, the pumping/water requirement should be as per Table 32.
The volume of water stated in Table 32 should be stored in more than one interconnected compartments/tanks. Wherever existing structures are upgraded to include a commercial area and additional water requirement as per Table 32 if any, may be met by additional tank or overhead tanks as permissible by structure. Size of the main header should not be less than 150 mm diameter in all cases. Entire fire protection system should be designed and installed as per the relevant Indian Standards.
| Table 31 Requirement of Firefighting Installations in Depot Building(Clause H-10.1.6) | |||||||||||||||
| SI No. | Name/Part of the Building | Occupancy | Fire Extinguisher | First Aid Hose Reel | Wet Riser | Down Comer | Yard Hydrant | Automatic Sprinkler System Installation | Manually Operated Electronic Fire Alarm System | Automatic Detection and Alarm System | Underground Static Water Storage Tank Combined Capacity for Wet Riser, Yard Hydrant and Sprinklers per Set of Pumps | Terrace tank over Respective Tower Terrace | Pump near Underground Static Water Storage Tank (Fire Pump) with minimum pressure of 3.5 Kg/cm2 at Remotest Location | Pump at the Terrace Tank level with minimum pressure of 3.5 Kg/cm2 | Remarks |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | (11) | (12) | (13) | (14) | (15) | (16) |
| i) | Live OHE areas/third rail areas (like inspection bay, workshop bay, stabling lines, auto coach washing plant, covered electrical substation, etc) | Assembly | R | R | R | NR | R | NR | R | NR | 2 00 000 litre | NR | 2 850 lpm main and standby electric pumps, and 180 lpm jockey pump | NR | |
| ii) | Areas having engineering workshops and offices [Inspection offices, workshop offices, (ETU) workshop, P-way offices, depot control centre, PPIO, other administrative offices, etc] | R | R | R | NR | R | NR | R | R | NR | NR | ||||
| iii) | Storage areas (DCOS, Store rooms, scrap yards within buildings, lubricant and any other combustible storage areas) | R | R | R | R | R | R | R | R | R(10 000 litre)For main store building | NR | ||||
| pr 2 1 N ovisions for these occupMiscellaneous areas or a Automatic sprinkler syst OTES R-Required ancies should be adopted any other building structure em is required in every sto NR-Not Require s given in T within the rage areas a d abl dep nd e 7ot scr A pr ap te omi ya Tabse ( rd i ls n ee si 7p d J.ar e ated the b from othe uildings. r T depo he sa t e m st e abli wet shment riser pu s) m c p a s n be can c b o e ns u ide sed r e f d or a f n e i e ndivid ding sp u r al in o kl c e c r u pan syst c e y m and , if a min ny. i m u m r e qu i r ement s f o r fi refi ght i n g | i v) | (1) | S l No. | |
| establishments,treatment plantsecurity roomsMiscellaneous commercial areas, ets, contractor rooms,, open scrap yards, areas(canteen, tim c) training sewagee office, | (2) | Name/ Part of the Building | ||
| (3) | Occupancy | |||
| (See Note 2) | (4) | Fire Extinguisher | ||
| (5) | First Aid Hose Reel | |||
| (6) | Wet Riser | |||
| (7) | Down Comer | |||
| R | (8) | Yard Hydrant | ||
| (Se e Not e 2) | (9) | Automatic Sprinkler System Installation | ||
| (10) | Manually Operated Electronic Fire Alarm System | |||
| (11) | Automatic Detection and Alarm System | |||
| (12) | U Cnomdebrignreodun Cda Sptaactiitcy W foart Wer e Stt Roriasegre, T Yaanrkd Hydrant and Sprinklers per Set of Pumps | |||
| (13) | Terrace tank over Respective Tower Terrace | |||
| (14) | Pump near Underground Static Water prSetsosruargee o Tf a 3n.5k K (Fgi/rcem P2 uamt p R)e wmiothte msti Lniomcautmion | |||
| (15) | Pump at the Terrace Tank level with minimum pressure of 3.5 Kg/cm2 | |||
| (16) | Remarks | |||
| Table 32 Water Capacity(Clause H-10.1.9) | ||||||
| Sl No. | Area Occupied by Commercial Occupancies m² | Hydrant Pump Capacity (Minimum Pressure of 3.5 kg/cm² at the Remotest Location )litre/min | Sprinkler Pump Capacitylitre/min | Jockey Pumplitre/min | Common Standby Pumpslitre/min | Water Capacitylitre |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) |
| i) | Up to and including 300 | 2 280 | Common pump | 180 | 2 280 | 75 000 |
| ii) | More than 300 and up to 1 000 | 2 850 | Common pump | 180 | 2 850 | 1 00 000 |
| iii) | More than 1 000 | 2 850 | 2 850 | 180 each | 2 850 | 2 00 000 |
H-10.2 Details of Protection and Facilities Required for Enclosed Metro Stations