F-1 General
Data centres are classified under Group E Business occupancy and in particular as E-II sub-occupancy considering its primary use, scale, and presence of process equipment. A comprehensive fire risk assessment should be conducted at the planning stage and periodically during operation. Assessments must include ignition sources, fire load, electrical risks, HVAC systems, etc. For guidance on the facilities and infrastructure of datacentres, refer to the following good practices.
| IS/ISO/IEC 22237-1 : 2021 | Information technology - Data centre facilities and infrastructures: Part 1General concepts |
|---|---|
| IS/ISO/IEC 22237-3 : 2021 | Information technology -Data centrefacilities and infrastructures: Part 3 Power distribution |
| IS/ISO/IEC 22237-4 : 2021 | Information technology - Data centre facilities and infrastructures: Part 4Environmental control |
F-2 Building Design and Construction
F-2.1 The fire resistance rating for the structural and non-structural elements should be based on guidelines as per approved and accepted standards. The fire rating should be validated and certified with a view to meeting the requirements of Table 1. In the absence of any validated/certified rating, guidance may be obtained from the information available in Annex C.
F-2.2 An anti-static floor system is highly recommended to prevent electrostatic discharge and support cable management. The data centre must be completely isolated from dust, water, vibration, and humidity. All external openings should be sealed, and no water sources or pipelines should be routed through or above the data centre,
UPS room, or communications room to eliminate risks of leakage or moisture intrusion. However, any location of chillers at higher heights be opted considering the operational efficiency and the same should be adequately considered in the structural design; Authorities may consider exempting the increased building height in such a case. Considering the sensitivity and fire hazards, such floors should have no other occupancy or else this should be considered in the calculation of floor area ratio and height.
F-2.3 Server rooms, battery banks, fuel storage, and other high-risk areas should be physically separated using fire-rated assemblies. Cable trays and ducts openings for cable trays and ducts should be sealed with materials having fire resistance rating of the compartment.
F-2.4 The number of basements should be kept as minimum and it should not be more than 2. The basement(s) should be within the building line and their total area should not exceed the area of ground floor.
F-2.5 The parking requirement should be arrived at considering the requirement for administrative building (at 1 ECS per 100 m2). The parking requirement for the data centre/utility building should be based on the actual required number and area (of trucks) for which additional considerations of loading and unloading spaces for services, including rack placement/replacement as advised by the OEMs, DG set, utilities, etc should be made. In addition, consideration for the fire truck and its movement should be ensured in consultation with the local Fire Authority.
F-2.6 Lifts, when planned, consider respectively for administrative building as passenger lift as per Part D/ Section 5A of this NBCS should, and for the datacentre building as special goods lifts and special service lifts, for which OEMs should be consulted considering the size, speed and weight of payload; and any required special requirement.
F-2.7 Heights of stories should be arrived at based on the size of racks opted and the associated services (like cooling/ducting) and the same is effectively addressed in the structural design. The total height of the datacentre building should be arrived based on the FAR and only Type 1 construction. Ground-coverage should ideally not exceed 60 percent considering the peculiar requirements and the essential nature of these buildings which are required in the society in the current times, and the associated moment of heavy vehicles to install/maintain/repair the racks/occupant.
NOTE — Authorities to consider also the possible change of occupancy from data centre to other permitted business as well; and the ground-coverage.
F-3 Fire Detection Systems
F-3.1 Use of aspirating smoke detection system in server areas is recommended for very early detection.
F-3.2 The system should incorporate heat sensitivity and high-sensitivity smoke detectors (HSSD) to enable early fire detection and prompt activation of suppression mechanisms.
F-3.3 For other requirements on fire detection and alarm system 4.9 be referred.
F-4 Fire Suppression Systems
F-4.1 The fire suppression system in data centres should be designed to ensure both operational continuity and protection of sensitive equipment. The preferred suppression technologies and clean agent extinguishers (such as heptafluoro propane, fluorinated ketone based system or equivalent) should be available throughout data hall areas. These systems should be effective in suppressing fires without leaving any residue, making them safe for electronic and electrical installations.
F-4.2 All critical areas within the data centre, including server rooms, network rooms, UPS and battery areas, and under-floor and overhead spaces, must be covered comprehensively by the fire suppression system.
F-4.3 The suppression agents should be ozone-friendly and compliant with international environmental norms. The recharge process must be easy, with minimal downtime, and the equipment should be easy to test periodically.
F-4.4 An early warning fire detection and suppression system should be integrated with the fire alarm and building management system (BMS) for real-time monitoring and response. The system should be engineered to offer reliable and quick suppression to minimize damage and downtime.
F-5 ELECTRICAL AND HVAC FIRE SAFETY (See also Part D/Sec 2 and Part D/Sec 3 of this NBCS)
F-5.1 UPS, transformer, and generator rooms should be separated with fire-rated partitions/doors and have independent suppression systems. Should the need arise, the generators can be placed one over the other/stacked (suggested upto 5 numbers) parallel to the data centre building, but adequate fire safety should be ensured for which OEM’s advice and specialist literature should be referred.
F-5.2 Wherever batteries are provided, the same should be segregated by 120 min fire rated construction. Ventilation to the room should be provided as per manufacturer’s instructions.
F-5.3 Air conditioning and ventilating systems should be so installed and maintained as to minimize the danger of spread of fire, smoke or fumes from one floor to other or from outside to any occupied building or structure.
F-5.4 Supply air ducts, fresh air and return air ducts/passages must include fire dampers and smoke detectors (see 3.5.7.4).
F-5.5 Insufficient power capacity design for a data centre can result in various issues such as system downtime, data loss, increased cost, reduced performance, regulatory non-compliance, etc. Ensuring a robust power capacity design is crucial for the reliable and efficient operation of data centres.
F-6 Means of Egress
F-6.1 Exit Access
Exits should be provided on each floor or compartment in accordance with 4.4.2. All exits should be unobstructed, illuminated, and clearly marked.
F-6.2 Staircases and Corridors
Staircases must be enclosed, fire-rated, and positively pressurized to prevent smoke ingress. Staircases should be of minimum 1.5 m in width, and 2 numbers of it will be required in the datacentre building. Staircase for administrative building should be arrived at using 4; in any case, minimum 2 staircases are required.
F-6.3 Emergency Lighting and Signage
Emergency lighting consistent with emergency system for the building should be provided. Addressable emergency exit lighting system is recommended, adaptive type exit signages can also be used.
F-7 MEP, Firefighting and Seismic Support Requirement
F-7.1 Earthquakes can cause downtime, data loss, service disruptions, fire, etc. Seismic bracing is essential to secure MEP equipment and systems, safeguarding them against the threats posed by earthquakes.
F-7.2 Non-structural measures focus on protecting operational components. These include seismic-rated mounting systems for equipment racks, secure cable pathways, MEP and firefighting services to avoid disconnections, and reinforced architectural features like ceilings and raised floors. These elements must meet seismic standards to ensure systems stay operational during and after an earthquake.
F-7.3 Seismic analysis/calculations should be carried out based on Part C ‘Structural Design, Section 1 Loads and Load Effects’ of this NBCS and good practice [F(32)]. Each non-structural component’s seismic interactions with all other connected components and with the supporting structure should be accounted for in the design. The component should accommodate drifts, deflections, and relative displacements determined in accordance with the applicable seismic requirements of standards.
F-7.4 Each straight pipe/duct/cable containment run with two or more supports requires a minimum of two transverse braces (perpendicular to the run) and one longitudinal brace (parallel to the run).
F-7.5 Wire rope angular bracing should be seismic certified/tested by third party accredited lab as per method of testing for rating seismic and wind restraints. Rigid angular bracing and modular support system should be
analyzed for both tensile and compressive loads for strength and serviceability for the maximum length of element being used in worst case condition as per load combination as mentioned in standards.
F-7.6 Calculate the static and dynamic loading due to wind forces that is required to select/design vibration isolators, bases and seismic and wind restraints for outdoor and roof top equipment’s/services. The calculation of wind load should be as per Part C ‘Structural Design, Section 1 Loads and Load Effects’ of thi NBCS. Worst case between seismic loads and wind loads should be considered for supporting and vibration isolation.
F-8 Security
F-8.1 It is recommended that all doors should be access controlled or should be as per best suitable secure design requirement.
F-8.2 Doors should send an alarm if left open.
F-8.3 In line with safety requirements, access should be open for the fire affected area.
F-9 Optional Performance Indicators
For guidance on the performance indicators of datacentres, the following good practices may be referred.
| IS/ISO/IEC 30134-1 : 2016 | Information technology - Data centres - Key performance indicators: Part 1 Overview and general requirements |
|---|---|
| IS/ISO/IEC 30134-2 : 2016 | Information technology - Data centres - Key performance indicators: Part 2 Power usage effectiveness (PUE) |
| IS/ISO/IEC 30134-3 : 2016 | Information technology - Data centres - Key performance indicators: Part 3 Renewable energy factor (REF) |
| IS/ISO/IEC 30134-4 : 2017 | Information technology - Data centres - Key performance indicators: Part 4 IT equipment energy efficiency for servers (ITEEsv) |
| IS/ISO/IEC 30134-5 : 2017 | Information technology - Data centres - Key performance indicators: Part 5 IT equipment utilization for servers (ITEUsv) |
| IS/ISO/IEC 30134-6 : 2021 | Information technology - Data centres - Key performance indicators: Part 6 Energy reuse factor (ERF) |
| IS/ISO/IEC 30134-8 : 2022 | Information technology - Data centres - Key performance indicators: Part 8 Carbon usage effectiveness (CUE) |
| IS/ISO/IEC 30134-9 : 2022 | Information technology - Data centres - Key performance indicators: Part 9 Water usage effectiveness (WUE) |