The Proposed Design and the corresponding Standard Design shall be consistent with information contained on the plans and
specifications. Some buildings, such as retail malls and speculative office buildings typically are built in phases. For example, the core mechanical system may be installed with the base building, while the ductwork and terminal
units are installed later as part of tenant improvements.
For the purpose of calculating the Proposed Building, the rule is simple: the features that are not yet designed or documented in the construction documents are assumed to minimally comply with the applicable prescriptive requirements of the ECBC, as specified in Sections 4 through 8. In cases where the space use classification is not known, the default assumption is to classify it as office space using the Building Area Method.
The WBP Method is based on the assumption that non-residential buildings are both heated and cooled. Even if not installed initially, it is common for buildings lacking a heating or cooling system to have one retrofitted by future occupants. Accordingly, there is a special rule for calculating energy use in the Proposed Design when a building’s HVAC system is heating-only or cooling-only: the building must be modeled as if it is going to have both heating and cooling. The missing system is modeled as the default heating or cooling system that just meets the prescriptive requirements of the ECBC. The same system is modeled for both Standard and Proposed Designs.