
Whole Buildng Performance Method
The Whole Building Performance (WBP) method overcomes the limitations of the prescriptive method of compliance. Specifically, WBP Method may be used when some individual components of the Proposed Building do not meet the prescriptive requirements of the Code, but the remaining components far exceed the Code requirements. The latter, then, ‘compensate’ for the lower performance of the former components, and the building may comply with the Code considering its overall energy use. The WBP method requires the use of computer simulations to show compliance. This chapter enumerates all the requirements with respect to creating the energy model for compliance.
MANDATORY REQUIREMENTS
CALCULATING ENERGY CONSUMPTION OF PROPOSED DESIGN AND STANDARD DESIGN
SCHEDULES
SIMULATION
REQUIREMENTS
MAXIMUM ALLOWED EPI RATIOS