The prescriptive requirement of the Code regulates both interior and exterior lighting power.
Interior Lighting Power
The prescriptive lighting requirements limit the installed electric wattage for interior building lighting. Interior lighting includes all permanently installed general and task lighting shown on the plans. Interior lighting, for a building or a separately metered or permitted portion of a building, shall not exceed allowed power limits.
The installed interior lighting power for a building or a separately metered or permitted portion of a building shall be calculated in accordance with §6.3.4 and shall not exceed the interior lighting power allowance determined in accordance with either §6.3.2 or §6.3.3Error! Reference source not found.. Tradeoffs of interior lighting power allowance among portions of the building for which a different method of calculation has been used are not permitted.
As with the other sections of the Code, however, these lighting power requirements are minimum requirements. Designers working on specific projects may often be able to design more efficient lighting systems.
There are many exceptions to the lighting power requirement, generally for specialized lighting. These are listed in ECBC §6.3.1.
For interior lighting power requirements, the installed lighting power used by luminaires, including lamps, ballasts, current regulators, and central devices (except as specifically exempted in 7.1) can be calculated using the Building Area Method or the Space Function Method. These are explained in detail in the further sections.
Chapter 6
6.1 General
Lighting accounts for 15% of total energy consumption in India. Lighting is an area that offers many energy efficiency opportunities in almost any building facility, existing or new.
A century ago, a person could read by the light of a single candle, but today a person in a typical office uses hundreds or even thousand times more light. Over the years, illumination standards have increased radically along with efficiency of lamps.
People want light for different reasons, and a good lighting designer need to keep all of them in mind. Different tasks and building facilities require different amounts and types of light. For example, a surgeon in an operation theater needs lots of light with low glare and excellent color rendering, restaurant owners and diners often want low light levels, corporate boardrooms call for lighting that reinforces a feeling of importance and success while adapting to audio-visual presentations; retail outlets in many situations want to make their merchandise sparkle so that it draws the customers and encourages them to buy. An office executive needs modest ambient lighting level, good task lighting on work surface, and minimal glare to effectively read and work on computers.
While energy efficiency is an attractive goal for many reasons, lighting designers also need to consider a host of other factors, including the effect of quality of light on the visual comfort and productivity of the occupants. Small improvement in lighting quality can improve productivity of the user substantially. In practice,
the right quality and quantity of light can be provided efficiently (with less energy) by using the right technology and its effective integration with daylight.
Space Function Method
The allowable lighting power density can be calculated by the Space Function Method in the following steps.
(a) Determine the appropriate building type and the allowed lighting power density from Table 6-4 for ECBC Buildings, Table 6-5 for ECBC+ Buildings and, Table 6-6 for SuperECBC Buildings. In cases where both a common space type and building specific space type are listed, building specific space type LPD shall apply.
(b) For each space, enclosed by partitions 80% or greater than ceiling height, determine the gross carpet area by measuring to the face of the partition wall. Include the area of balconies or other projections. Retail spaces do not have to
comply with the 80% partition height requirements.
(c) The interior lighting power allowance is the sum of the lighting power allowances for all spaces. The lighting power allowance for a space is the product of the gross lighted carpet area of the space times the allowed lighting power density for that space
Table 6-4Interior Lighting Power for ECBC Buildings – Space Function Method
Category
LPD (W/m<sup>2</sup>)
Lamp category
LPD (W/m<sup>2</sup>)
Common Space Types
Restroom
7.70
Stairway
5.50
Storage
6.80
Corridor/Transition
7.10
Conference/ Meeting
11.5
Lobby
9.10
Parking Bays (covered/
2.20
Parking Driveways (covered/
3.00
basement)
basement)
Electrical/Mechanical
7.10
Workshop
17.1
Business
Enclosed
10.0
Open Plan
10.0
Banking Activity Area
12.6
Service/Repair
6.80
Healthcare
Emergency
22.8
Recovery
8.60
Exam/Treatment
13.7
Storage
5.50
Nurses' Station
9.40
Laundry/Washing
7.50
Operating Room
21.8
Lounge/Recreation
8.00
Patient Room
7.70
Medical Supply
13.7
Pharmacy
10.7
Nursery
5.70
Physical Therapy
9.70
Corridor/Transition
9.10
Radiology/Imaging
9.10
Category
LPD (W/m<sup>2</sup>)
Lamp category
LPD (W/m<sup>2</sup>)
Hospitality
Hotel Dining
9.10
Hotel Lobby
10.9
For Bar Lounge/ Dining
14.1
Motel Dining
9.10
For food preparation
12.1
Motel Guest Rooms
7.70
Hotel Guest Rooms
9.10
Shopping Complex
Mall Concourse
12.8
For Family Dining
10.9
Sales Area
18.3
For food preparation
12.1
Motion Picture Theatre
9.60
Bar Lounge/ Dining
14.1
Educational
Classroom/Lecture
13.7
Card File and Cataloguing
9.10
For Classrooms
13.8
Stacks (Lib)
18.3
Laboratory
15.1
Reading Area (Library)
10.0
Assembly
Dressing Room
9.10
Seating Area - Performing Arts Theatre
22.6
Exhibit Space - Convention Centre
14.0
Lobby - Performing Arts Theatre
21.5
Seating Area - Gymnasium
4.60
Seating Area - Convention Centre
6.40
Fitness Area - Gymnasium
13.70
Seating Religious Building
16.4
Museum - General Exhibition
16.40
Playing Area - Gymnasium
18.8
Museum - Restoration
18.3
Table 6-5Interior Lighting Power for ECBC+ Buildings – Space Function Method
Category
LPD (W/m<sup>2</sup>)
Lamp category
LPD(W/m<sup>2</sup>)
Common Space Types
Restroom
6.10
Stairway
4.40
Storage
5.40
Corridor/Transition
3.60
Conference/ Meeting
9.20
Lobby
7.30
Parking Bay (covered/ basement)
1.75
Parking Driveways (covered/ basement)
2.50
Electrical/Mechanical
5.70
Workshop
13.7
Business
Enclosed
8.60
Open Plan
8.60
Banking Activity Area
9.30
Service/Repair
5.50
Healthcare
Emergency
18.2
Recovery
7.00
Exam/Treatment
10.9
Storage
4.40
Nurses' Station
7.50
Laundry/Washing
6.00
Operating Room
17.5
Lounge/Recreation
6.40
Patient Room
6.10
Medical Supply
10.9
Pharmacy
8.50
Nursery
4.60
Physical Therapy
7.80
Corridor/Transition
7.30
Radiology/Imaging
7.30
Hospitality
Hotel Dining
7.30
Hotel Lobby
8.80
For Bar Lounge/ Dining
11.3
Motel Dining
7.30
For food preparation
12.1
Motel Guest Rooms
6.10
Hotel Guest Rooms
7.30
Shopping Complex
Mall Concourse
10.2
For Family Dining
8.80
Sales Area
14.6
For food preparation
12.1
Motion Picture Theatre
10.3
Bar Lounge/ Dining
11.3
Table 6-6Interior Lighting Power for SuperECBC Buildings – Space Function Method
Category
LPD (W/m<sup>2</sup>)
Lamp category
LPD (W/m<sup>2</sup>)
Common Space Types
Restrooms
3.80
Stairway
2.70
Storage
3.40
Corridor/Transition
2.30
Conference/ Meeting
5.70
Lobby
4.60
Parking Bays
(covered/1.10
Driveways (covered/
1.50
basement)
basement)
Electrical/Mechanical
3.50
Workshop
8.60
Business
Enclosed
5.40
Open Plan
5.40
Banking Activity Area
5.80
Service/Repair
3.40
Healthcare
Emergency
11.4
Recovery
4.40
Exam/Treatment
6.80
Storage
2.70
Nurses' Station
5.00
Laundry/Washing
3.80
Operating Room
10.9
Lounge/Recreation
4.60
Patient Room
3.80
Medical Supply
6.80
Pharmacy
5.30
Nursery
2.90
Physical Therapy
4.90
Corridor/Transition
4.60
Radiology/Imaging
4.60
Hospitality
Hospitality
Hospitality
Hospitality
Hotel Dining
4.60
Hotel Lobby
5.50
For Bar Lounge/ Dining
7.00
Motel Dining
4.60
For food preparation
7.50
Motel Guest Rooms
3.80
Hotel Guest Rooms
4.60
Shopping Complex
Shopping Complex
Shopping Complex
Shopping Complex
Mall Concourse
6.40
For Family Dining
5.50
Category
LPD (W/m2)
Building Area Method
This method provides the procedure of calculating total watts per square meter for the entire building based on its type. The sum of all the interior lighting power for various areas of
the building cannot exceed the total watts to be in compliance. The building area method is the simplest method to follow since fewer calculations are required. However, if the project applies to only a portion of the entire building, is not listed as a building type, or has more than one occupancy type, the space function method should be used to determine compliance.
The allowed lighting power density can be calculated in the following two steps as per the Building Area Method
Calculate the gross lighted carpet area for each building area type.
The interior lighting power allowance is the sum of the products of the gross lighted floor area of each building area times the allowed lighting power density for that building area type.
The lighting power for appropriate building area type can be selected from for ECBC Buildings, from Table 6-2 for ECBC+ Buildings and from Table 6-3 for SuperECBC Buildings.
Table 6-1Interior Lighting Power for ECBC Buildings – Building Area Method
Building Type
LPD (W/m<sup>2</sup>)
Building Area Type
LPD (W/m<sup>2</sup>)
Office Building
9.50
Motion picture theater
9.43
Hospitals
9.70
Museum
10.2
Hotels
9.50
Post office
10.5
Shopping Mall
14.1
Religious building
12.0
University and Schools
11.2
Sports arena
9.70
Library
12.2
Transportation
9.20
Dining: bar lounge/leisure
12.2
Warehouse
7.08
Dining: cafeteria/fast food
11.5
Performing arts theater
16.3
Dining: family
10.9
Police station
9.90
Dormitory
9.10
Workshop
14.1
Fire station
9.70
Automotive facility
9.00
Gymnasium
10.0
Convention center
12.5
Manufacturing facility
12.0
Parking garage
3.00
In cases where both a general building area type and a specific building area type are listed, the specific building area type shall apply.
Table 6-2Interior Lighting Power for ECBC+ Buildings – Building Area Method
Building Area Type
LPD (W/m<sup>2</sup>)
Building Area Type
LPD (W/m<sup>2</sup>)
Office Building
7.60
Motion picture theater
7.50
Hospitals
7.80
Museum
8.20
Hotels
7.60
Post office
8.40
Shopping Mall
11.3
Religious building
9.60
University and Schools
9.00
Sports arena
7.80
Library
9.80
Transportation
7.40
Dining: bar lounge/leisure
9.80
Warehouse
5.70
Dining: cafeteria/fast food
9.20
Performing arts theater
13.0
Dining: family
8.70
Police station
7.90
Dormitory
7.30
Workshop
11.3
Fire station
7.80
Automotive facility
7.20
Gymnasium
8.00
Convention center
10.0
Manufacturing facility
9.60
Parking garage
2.40
In cases where both a general building area type and a specific building area type are listed, the specific building area type shall apply.
Table 6-3Interior Lighting Power for SuperECBC Buildings – Building Area Method
Building Area Type
LPD (W/m<sup>2</sup>)
Building Area Type
LPD (W/m<sup>2</sup>)
Office Building
5.0
Motion picture theater
4.7
Hospitals
4.9
Museum
5.1
Hotels
4.8
Post office
5.3
Shopping Mall
7.0
Religious building
6.0
University and Schools
6.0
Sports arena
4.9
Library
6.1
Transportation
4.6
Dining: bar lounge/leisure
6.1
Warehouse
3.5
Dining: cafeteria/fast food
5.8
Performing arts theater
8.2
Dining: family
5.5
Police station
5.0
Dormitory
4.6
Workshop
7.1
Fire station
4.9
Automotive facility
4.5
Gymnasium
5.0
Convention center
6.3
Manufacturing facility
6.0
Parking garage
1.5
In cases where both a general building area type and a specific building area type are listed, the specific building area type shall apply.
Educational
Educational
Educational
Educational
Classroom/Lecture
10.9
Card File and Cataloguing
7.30
For Classrooms
11.0
Stacks (Library)
14.6
Laboratory
12.1
Reading Area (Library)
9.20
Assembly
Assembly
Assembly
Assembly
Dressing Room
7.30
Seating Area - Performing Arts Theatre
18.1
Category
LPD (W/m2)
Lamp category
LPD (W/m2)
Exhibit Space - Convention Centre
11.2
Lobby - Performing Arts Theatre
17.2
Seating Area - Gymnasium
3.60
Seating Area – Convention Centre
5.10
Fitness Area - Gymnasium
7.85
Seating Religious Building
13.1
Museum - General Exhibition
11.3
Playing Area - Gymnasium
12.9
Museum - Restoration
11.0
Lamp category
LPD (W/m2)
Sales Area
9.20
For food preparation
7.50
Motion Picture Theatre
6.50
Bar Lounge/ Dining
7.00
Educational
Educational
Educational
Educational
Classroom/Lecture
6.80
Card File and Cataloguing
4.60
For Classrooms
6.90
Stacks (Library)
9.20
Laboratory
7.50
Reading Area (Library)
5.70
Assembly
Assembly
Assembly
Assembly
Dressing Room
4.60
Seating Area - Performing Arts Theatre
11.3
Exhibit Space – Convention Centre
7.00
Lobby - Performing Arts Theatre
10.8
Seating Area - Gymnasium
3.40
Seating Area – Convention Centre
3.20
Fitness Area - Gymnasium
3.92
Seating Religious Building
8.20
Museum – General Exhibition
5.65
Playing Area - Gymnasium
6.50
Museum – Restoration
5.50
Installed Interior Lighting Power
As per the Code,
The installed interior lighting power calculated for compliance with §6.3 shall include all power used by the luminaires, including lamps, ballasts, current regulators, and control devices except as specifically exempted in §6.1.
Exception to above,
If two or more independently operating lighting systems in a space are controlled to prevent simultaneous user operation, the installed interior lighting power shall be based solely on the lighting system with the highest power.
6.3.4.1 Luminaire Wattage
There are two aspects of a luminaire that has a direct impact on lighting energy consumption.
Wattage – This indicates the direct power consumption of the luminaire. Higher the wattage, more the electricity use. It also means that more luminaires would mean a higher total wattage and hence a higher connected lighting load.
Efficacy – Light output of a luminaire is given by ‘lumens’. Higher the lumens, the “brighter” a lamp will appear. We want to select a luminaire that gives “more lumens per watt of electricity used”. This is called lamp efficacy.
Efficacy = Lumens / Watt
For example, a 6.5 watt LED lamp will give a similar light output to a 50 watt Halogen lamp. Thus, efficacy indicates how energy efficient a lamp is.
Thus, while selecting an energy efficiency lamp, it is essential to compare the efficacy and not just the wattage. All lamps have lumen rating mentioned on the package using which the efficacy can be derived. As per the Code,
Luminaire efficacy shall be 0.7 or above.
The Code requires that luminaire wattage be incorporated into the installed interior lighting power calculation as follows:
(a) The wattage of incandescent luminaires with medium base sockets and not containing permanently installed ballasts shall be the maximum labeled wattage of the luminaires.
(b) The wattage of luminaires containing permanently installed ballasts shall be the operating input wattage of the specified lamp/ballast combination. Operating input wattage can be either values from manufacturers’ catalogs or values from independent testing laboratory reports.
(c) The wattage of all other miscellaneous luminaire types not described in (a) or (b) shall be the specified wattage of the luminaires.
(d) The wattage of lighting track, plug-in busway, and flexible-lighting systems that allow the addition and/ or relocation of luminaires without altering the wiring of the system shall be the larger of the specified wattage of the luminaires included in the system or 135 Watt per meter (45 W/ft.). Systems with integral overload protection, such as fuses or circuit breakers, shall be rated at 100% of the maximum rated load of the limiting device
Exterior Lighting Power
As per the Code,
Connected lighting power of exterior lighting applications shall not exceed the lighting power limits specified in Error! Reference source not found. for ECBC Buildings, Error! Reference source not found. for ECBC+ Buildings and Error! Reference source not found. for SuperECBC Buildings. Trade-offs between applications are not permitted.
Table 6-7Exterior Building Lighting Power for ECBC Buildings
Exterior lighting application
Power limits
Building entrance (with canopy)
10 W/m<sup>2</sup> of canopied area
Building entrance (w/o canopy)
90 W/ linear m of door width
Building exit
60 W/lin m of door width
Building façade
5.0 W/m<sup>2</sup> of vertical façade area
Emergency signs, ATM kiosks, Security areas façade
1.0 W/m<sup>2</sup>
Driveways and parking (open/ external)
1.6 W/m<sup>2</sup>
Pedestrian walkways
2.0 W/m<sup>2</sup>
Stairways
10.0 W/m<sup>2</sup>
Landscaping
0.5 W/m<sup>2</sup>
Outdoor sales area
9.0 W/m<sup>2</sup>
Table 6-8Exterior Building Lighting Power for ECBC+ Buildings
Exterior lighting application
Power limits
Building entrance (with canopy)
8.0 W/m<sup>2</sup> of canopied area
Building entrance (w/o canopy)
72 W/ linear m of door width
Building exit
48 W/lin m of door width
Building façade
4.0 W/m<sup>2</sup> of vertical façade area
Emergency signs, ATM kiosks, Security areas façade
0.8 W/m<sup>2</sup>
Driveways and parking (open/ external)
1.3 W/m<sup>2</sup>
Pedestrian walkways
1.6 W/m<sup>2</sup>
Stairways
8.0 W/m<sup>2</sup>
Landscaping
0.4 W/m<sup>2</sup>
Outdoor sales area
7.2 W/m<sup>2</sup>
6.3.6.1 Centralized Controls
Centralized lighting control can increase the potential of energy savings during operations by offering superior control. Such a lighting control system is usually part of the Building Management System (BMS). From one location, the lighting in a single room to a group of rooms or even the entire building can be controlled.
Lighting control systems can be a hard wired or a wireless system. It requires thorough planning during the design development stage in order to have a successful lighting control system in place.
ECBC+ and SuperECBC building shall have centralized control system for schedule based automatic lighting shutoff switches.
6.3.6.2 Exterior Lighting Controls
Lighting for all exterior applications, shall have lamp efficacy not less than 80 lumens per watt, 90 lumens per watt, and 100 lumens per watt, for ECBC, ECBC+, and SuperECBC Buildings respectively, unless the luminaire is controlled by a motion sensor or exempt under §6.1.
Example 6-A
A four-story building has retail on the ground floor and offices on the top three floors. Area is 3,600 m2. Space types and their respective areas are mentioned below. Calculate the interior lighting power allowance using the space function method for a ECBC building. What will be the exterior lighting power allowance for façade lighting for this building?
For each of the space type, corresponding Lighting Power Density (LPD) values for Business and Shopping complex building type from Table 6-4 are used. Area is multiplied with the LPD values to estimate the lighting power allowance for the whole building as shown below.
Space Function
LPD (W/ m²)
Area (m²)
Lighting Power Allowance (W)
Office
Office - enclosed
10.0
720
7,200
Office - open plan
10.0
1,485
14,850
Meeting Rooms
11.5
120
1,380
Lobbies
7.1
93
660
Restrooms
7.7
51
393
Corridors
7.1
125
887.5
Electrical/
7.1
14
99
Mechanical
Staircase
5.5
84
462
Total
25,931.5
Retail
General sales area
18.3
669
12,243
Offices - enclosed
10.0
28
280
Restrooms
7.7
9
69
Corridors
7.1
79
561
Active Storage
6.8
93
632
Food preparation
12.1
28
339
Total
14,124
Building Total
40,055.5 W
Thus, total lighting power allowance for this building is 40kW.
Table 6-9
Exterior Building Lighting Power for SuperECBC Buildings
Exterior lighting application
Power limits
Building entrance (with canopy)
5.0 W/m<sup>2</sup> of canopied area
Building entrance (w/o canopy)
45 W/ linear m of door width
Building exit
30 W/lin m of door width
Building façade
2.5 W/m<sup>2</sup> of vertical façade area
Emergency signs, ATM kiosks, Security areas façade
0.5 W/m<sup>2</sup>
Driveways and parking (open/ external)
0.8 W/m<sup>2</sup>
Pedestrian walkways
1.0 W/m<sup>2</sup>
Stairways
5.0 W/m<sup>2</sup>
Landscaping
0.25 W/m<sup>2</sup>
Outdoor sales area
4.5 W/m<sup>2</sup>
Controls for ECBC+ and SuperECBC Buildings
From Error! Reference source not found., it can be determined that the exterior building lighting power limit for façade lighting is 5.0 W/m2 of vertical façade area.
Electrical & Renewable Energy Systems
Electrical and Renewable Energy Systems
After optimizing the loads in the buildings, the final step is t ensure that the electrical systems are designed efficiently to ensure that the overall system is minimizing distribution losses and supplies electricity efficiently to the building. Further, renewable energy can be used a potential source of electricity (clean energy). Hence requirements to ensure buildings are ready to integrate renewable system in the future have been covered in this chapter. This will prepare the building industry to move towards self-sufficiency and clean energy.