A building complies with the Code using the Whole Building Performance (WBP) Method, when the estimated EPI Ratio is equal to or less than 1, even though it may not comply with the specific provisions of the prescriptive requirements in §4 through §7. The mandatory requirements of §4 through §7 (§4.2, §5.2, §6.2 and §7.2) shall be met when using the WBP Method
Compliance of the Proposed Design with the requirements of the ECBC Whole Building Performance Method consists of the following steps:
-
Developing a Standard Design simulation model
-
Carrying out a valid energy simulation run using the Standard Design to predict its annual energy use
-
Developing the Proposed Design simulation model for which compliance is being sought
-
Carrying out a valid energy simulation run for the Proposed Design model and ensuring that the predicted annual energy use is less than or equal to the energy use in Standard Design
The major consideration for generating the Standard Design simulation model is that it complies with the minimum performance requirements specified in the ECBC.
Much of the remainder of this chapter is addressed towards the development of the Standard and Proposed Designs. The following sections describe how decisions are to be taken for each of the two designs, and how these two simulation runs are to be done, but the following rules always apply:
Mandatory provisions of the Code mentioned in §4 through section §8 are met
Both simulation runs must use the same simulation program
Both simulation runs must use the same climate data
Both simulation runs must use the same schedules of operation
These rules ensure a fair comparison between the two runs, without introducing extraneous differences. For instance, if the runs used different simulation programs, then some portion of the differences between the resulting energy consumption would be due to differences in algorithms or calculation methodologies making it difficult to evaluate the impact of the two designs on energy use.
The WBP method provides the building owner and design team with the flexibility to try out different design options, provided the end result is a building that does not have higher annual energy consumption than if it would have met all the prescriptive requirements. For example, the owner may decide to invest in a more efficient lighting system in place of larger glazing areas or invest in high performance glazing to avoid the cost of installing an economizer and get the benefits of daylighting.