(a) A dedicated REGZ equivalent to at least 25 % of roof area or area required for generation of energy equivalent to 1% of total peak demand or connected load of the building,
whichever is less, shall be provided in all buildings.
Connected load will include all systems that use electricity such as lighting, comfort systems and receptacles.
(b) The REGZ shall be free of any obstructions within its boundaries and from shadows cast by objects adjacent to the zone.
Obstruction free solar access is important for the solar-based renewable systems to work effectively. Any future additions should be planned to provide solar access.
(c) ECBC+ and SuperECBC building shall fulfil the additional requirements listed in Table 7-5 and Table 7-6 respectively.
Exception to §7.2.8.1: Projects with solar hot water and/ or solar power generation systems.
| Building Type | Minimum Electricity to be Generated in REGZ |
|---|---|
| All building types except below | Minimum 2% of total electrical load |
| Star Hotel > 20,000 m² | Minimum 3% of total electrical load |
| Resort > 12,500 m² | |
| University > 20,000 m² | |
| Business >20,000 m² |
| Building Type | Minimum Electricity to be Generated in REGZ |
|---|---|
| All Building types except below | Minimum 4% of total electrical load |
| Star Hotel >20,000 m² | Minimum 6% of total electrical load |
| Resort >12,500 m² | |
| University >20,000 m² | |
| Business >20,000 m² |
7.2.8.2 Main Electrical Panel
Integration of solar electric systems in the future requires planning at the main electrical panel as well. As per the Code,
Minimum rating shall be displayed on the main electrical service panel. Space shall be reserved for the installation of a double pole circuit breaker for a future solar electric installation.