| No | Amenity | Amenities required as per norms | Existing Amenities | Proposed amenities in the DP 2031 | Total provisions | ||||
| No | Area (ha) | No | Area (ha) | No | Area (ha) | No | Area (ha) | ||
| A | B | C | D | E | F | G | H | J | K |
| 1 | Primary School(0.4 ha per 500 students) | 29 | - | 30 | 0 | 0.00 | 30 | - | |
| 2 | Secondary School(1.125 ha per 750 students) | 10 | - | 9 | 1 | 1.25 | 10 | - | |
| 3 | Tribal Welfare School | 0 | 0.00 | 0 | - | ||||
| 4 | Playground(0.4 ha/ 1,000 people) | NA | 38.60 | - | 14.24 | 15 | 30.74 | 21 | 44.98 |
| 5 | Sports Complex(20 ha/ 50,000 people) | 1 | - | - | - | 1 | 17.81 | 1 | 17.81 |
| 6 | Park/ Garden(0.2 ha/ 1,000 people) | NA | 19.28 | - | 0.00 | 10 | 20.96 | 10 | 20.96 |
| 7 | Regional Parks(10 ha/ 50,000 people) | 1 | - | - | 1 | 23.22 | 1 | 23.22 | |
| 8 | Dispensaries/ Maternity Home(1 per 10,000 people of 0.25 ha size) | 5 | 1.25 | 9 | - | 0 | 0.00 | 9 | 0.00 |
| 9 | Intermediate Hospital | 1 | 1.25 | 1.00 | - | 0 | 0.00 | 1 | 0.00 |
| 10 | Rural Hospital | 0 | 0.00 | 0 | 0.00 | ||||
| 11 | Vegetable Market(0.2 ha per 10,000 people) | NA | 1.93 | - | - | 1 | 1.98 | 1 | 1.98 |
| 12 | Library(Library of 0.05 ha for 10,000 people; | NA | 0.48 | - | - | 1 | 0.56 | 1 | 0.56 |
| 13 | Multi purpose Hall (Community Centre)(Multi purpose hall of 0.5 ha per 50,000 people) | NA | 0.96 | - | - | 1 | 1.19 | 1 | 1.19 |
| 14 | Auditorium | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 15 | Commercial Centre | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 16 | Fire Stations(1 for 2 lakh people) | NA | NA | - | - | 2 | 2.35 | 2 | 2.35 |
| 17 | Cremation/ Burial Ground(Cremation Area- 0.4 ha per 5 lakh population; Cemetery/ Burial Ground-1 ha per 10 lakh population) | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 18 | ESR/ GSR (As per CPHEEO Manual) | NA | NA | - | - | 3 | 1.62 | 3 | 1.62 |
| 19 | Electric Substation(As requested from MSEDCL office) | NA | NA | - | - | 3 | 3.39 | 3 | 3.39 |
| 20 | Sewage Treatment Plant(As per CPHEEO Manual) | NA | NA | - | - | 1 | 1.45 | 1 | 1.45 |
| 21 | Solid Waste Disposal Site(As per MOeF & UDPFI guidelines) | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
A- 106
| Nagpur Metropolitan Area Development Plan 2011-2031 Population 2027 :96,410PROFORMA B - Sector : North AReservations for Public Amenities in the NMA Development Plan 2031 | |||||||||
| No | Amenity | Amenities required as per norms | Existing Amenities | Proposed amenities in the DP 2031 | Total provisions | ||||
| No | Area (ha) | No | Area (ha) | No | Area (ha) | No | Area (ha) | ||
| A | B | C | D | E | F | G | H | J | K |
| 22 | Solid Waste Transfer Station(As per MOeF & UDPFI guidelines) | NA | NA | - | - | 1 | 1.55 | 1 | 1.55 |
| 23 | Slaughter House | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 24 | Bus Terminal | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 25 | Truck Terminal | NA | NA | - | - | 1 | 5.91 | 1 | 5.91 |
| 26 | Metro Depot | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 27 | Parking | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 28 | Exhibition ground | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 29 | District Court Complex | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 30 | Jail | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 32 | Reserved for Affordable Housing | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 33 | Poilce Station | NA | NA | - | - | 0 | 0.00 | 0 | |
A- 107
| Nagpur Metropolitan Area Development Plan 2011-2031 Population 2027 : 64,647PROFORMA B - Sector : North BReservations for Public Amenities in the NMA Development Plan 2032 | |||||||||
| No | Amenity | Amenities required as per norms | Existing Amenities | Proposed amenities in the DP 2032 | Total provisions | ||||
| No | Area (ha) | No | Area (ha) | No | Area (ha) | No | Area (ha) | ||
| A | B | C | D | E | F | G | H | J | K |
| 1 | Primary School(0.4 ha per 500 students) | 18 | - | 14 | 6 | 3.05 | 20 | - | |
| 2 | Secondary School(1.125 ha per 750 students) | 6 | - | 7 | 1 | 1.21 | 8 | - | |
| 3 | Tribal Welfare School | 0 | 0.00 | 0 | - | ||||
| 4 | Playground(0.4 ha/ 1,000 people) | NA | 25.86 | - | 2.74 | 8 | 29.16 | 15 | 31.90 |
| 5 | Sports Complex(20 ha/ 50,000 people) | - | - | - | 0 | 0.00 | 0 | 0.00 | |
| 6 | Park/ Garden(0.2 ha/ 1,000 people) | NA | 12.93 | - | 0.00 | 5 | 15.45 | 5 | 15.45 |
| 7 | Regional Parks(10 ha/ 50,000 people) | - | - | - | 0 | 0.00 | 0 | 0.00 | |
| 8 | Dispensaries/ Maternity Home(1 per 10,000 people of 0.25 ha size) | 7 | 1.75 | 9 | - | 1 | 0.35 | 10 | - |
| 9 | Intermediate Hospital | 0 | 0.00 | 1.00 | - | 0 | 0.00 | 1 | - |
| 10 | Rural Hospital | 0 | 0.00 | 0 | 0.00 | ||||
| 11 | Vegetable Market(0.2 ha per 10,000 people) | NA | 1.29 | - | - | ||||
A- 108
| Nagpur Metropolitan Area Development Plan 2011-2031 Population 2027 : 64,647PROFORMA B - Sector : North BReservations for Public Amenities in the NMA Development Plan 2032 | |||||||||
| No | Amenity | Amenities required as per norms | Existing Amenities | Proposed amenities in the DP 2032 | Total provisions | ||||
| No | Area (ha) | No | Area (ha) | No | Area (ha) | No | Area (ha) | ||
| A | B | C | D | E | F | G | H | J | K |
| 28 | Exhibition ground | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 29 | District Court Complex | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 30 | Jail | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 32 | Reserved for Affordable Housing | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 33 | Police Station | NA | NA | - | - | 1 | 0.90 | 1 | 0.90 |
| 34 | Intake well and Sewage pumping station | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 35 | Agricultural Produce Market | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 36 | Rail Logistic Hub | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 37 | Multi Modal Transport Hub | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| Total | 31 | 77.28 | 68 | 74.64 | |||||
A- 109
| Nagpur Metropolitan Area Development Plan 2011-2032 | Population 2027 : 91,151 | ||||||||
| PROFORMA B - Sector : East A | |||||||||
| Reservations for Public Amenities in the NMA Development Plan 2032 | |||||||||
| No | Amenity | Amenities required as per norms | Existing Amenities | Proposed amenities in the DP 2032 | Total provisions | ||||
| No | Area (ha) | No | Area (ha) | No | Area (ha) | No | Area (ha) | ||
| A | B | C | D | E | F | G | H | J | K |
| 1 | Primary School (0.4 ha per 500 students) | 27 | - | 10 | 17 | 8.39 | 27 | - | |
| 2 | Secondary School (1.125 ha per 750 students) | 9 | - | 2 | 9 | 11.08 | 11 | - | |
| 3 | Tribal Welfare School | 0 | 0.00 | 0 | - | ||||
| 4 | Playground (0.4 ha/ 1,000 people) | NA | 36.46 | - | 0.49 | 19 | 38.02 | 19 | 38.51 |
| 5 | Sports Complex (20 ha/ 50,000 people) | 1 | - | - | - | 1 | 10.57 | 1 | 10.57 |
| 6 | Park/ Garden (0.2 ha/ 1,000 people) | NA | 18.23 | - | 0.00 | 7 | 19.83 | 7 | 19.83 |
| 7 | Regional Parks (10 ha/ 50,000 people) | 1 | - | - | 1 | 11.04 | 1 | 11.04 | |
| 8 | Dispensaries/ Maternity Home (1 per 10,000 people of 0.25 ha size) | 4 | 1.00 | 1 | - | 4 | 1.13 | 5 | - |
| 9 | Intermediate Hospital | 1 | 1.25 | 0.00 | - | 1 | 1.35 | 1 | - |
| 10 | Rural Hospital | 0 | 0.00 | 0 | 0.00 | ||||
A- 110
| Nagpur Metropolitan Area Development Plan 2011-2032 | Population 2027 : 91,151 | ||||||||
| PROFORMA B - Sector : East A | |||||||||
| Reservations for Public Amenities in the NMA Development Plan 2032 | |||||||||
| No | Amenity | Amenities required as per norms | Existing Amenities | Proposed amenities in the DP 2032 | Total provisions | ||||
| No | Area (ha) | No | Area (ha) | No | Area (ha) | No | Area (ha) | ||
| A | B | C | D | E | F | G | H | J | K |
| 29 | District Court Complex | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 30 | Jail | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 32 | Reserved for Affordable Housing | NA | NA | - | - | 1 | 10.09 | 1 | 10.09 |
| 33 | Poilce Station | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 34 | Intake well and sewage pumping station | NA | NA | - | - | 1 | 0.21 | 1 | 0.21 |
| 35 | Agricultural Produce Market | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 36 | Rail Logistic Hub | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 37 | Multi Modal Transport Hub | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| Total | 78 | 129.84 | 91 | 108.37 | |||||
A- 111
| Nagpur Metropolitan Area Development Plan 2011-2032 Population 2027 : 62,982PROFORMA B - Sector : East BReservations for Public Amenities in the NMA Development Plan 2032 | |||||||||
| No | Amenity | Amenities required as per norms | Existing Amenities | Proposed amenities in the DP 2032 | Total provisions | ||||
| No | Area (ha) | No | Area (ha) | No | Area (ha) | No | Area (ha) | ||
| A | B | C | D | E | F | G | H | J | K |
| 1 | Primary School(0.4 ha per 500 students) | 19 | - | 9 | 12 | 6.79 | 21 | - | |
| 2 | Secondary School(1.125 ha per 750 students) | 6 | - | 1 | 7 | 9.26 | 8 | - | |
| 3 | Tribal Welfare School | 0 | 0.00 | 0 | - | ||||
| 4 | Playground(0.4 ha/ 1,000 people) | NA | 25.19 | - | 4.44 | 10 | 31.81 | 10 | 36.26 |
| 5 | Sports Complex(20 ha/ 50,000 people) | 1 | - | - | - | 1 | 10.34 | 1 | 10.34 |
| 6 | Park/ Garden(0.2 ha/ 1,000 people) | NA | 12.60 | - | 0.00 | 7 | 16.79 | 7 | 16.79 |
| 7 | Regional Parks(10 ha/ 50,000 people) | - | - | - | 1 | 23.45 | 1 | 23.45 | |
| 8 | Dispensaries/ Maternity Home(1 per 10,000 people of 0.25 ha size) | 2 | 0.50 | 2 | - | 1 | 0.48 | 2 | - |
| 9 | Intermediate Hospital | 1 | 1.25 | 0.00 | - | 1 | 1.53 | 1 | - |
| 10 | Rural Hospital | 0 | 0.00 | 0 | 0.00 | ||||
| 11 | Vegetable Market(0.2 ha per 10,000 people) | NA | 1.26 | - | |||||
A- 112
| Nagpur Metropolitan Area Development Plan 2011-2032 Population 2027 : 62,982PROFORMA B - Sector : East BReservations for Public Amenities in the NMA Development Plan 2032 | |||||||||
| No | Amenity | Amenities required as per norms | Existing Amenities | Proposed amenities in the DP 2032 | Total provisions | ||||
| No | Area (ha) | No | Area (ha) | No | Area (ha) | No | Area (ha) | ||
| A | B | C | D | E | F | G | H | J | K |
| 28 | Exhibition ground | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 29 | District Court Complex | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 30 | Jail | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 32 | Reserved for Affordable Housing | NA | NA | - | - | 1 | 11.92 | 1 | 11.92 |
| 33 | Poilce Station | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 34 | Intake well and Sewage pumping station | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 35 | Agricultural Produce Market | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 36 | Rail Logistic Hub | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 37 | Multi Modal Transport Hub | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| Total | 57 | 164.49 | 68 | 150.88 | |||||
A- 113
| Nagpur Metropolitan Area Development Plan 2011-2032 Population 2027 : 42,588PROFORMA B - Sector : South AReservations for Public Amenities in the NMA Development Plan 2032 | |||||||||
| No | Amenity | Amenities required as per norms | Existing Amenities | Proposed amenities in the DP 2032 | Total provisions | ||||
| No | Area (ha) | No | Area (ha) | No | Area (ha) | No | Area (ha) | ||
| A | B | C | D | E | F | G | H | J | K |
| 1 | Primary School(0.4 ha per 500 students) | 13 | - | 11 | 2 | 0.85 | 13 | - | |
| 2 | Secondary School(1.125 ha per 750 students) | 4 | - | 4 | 0 | 0.00 | 4 | - | |
| 3 | Tribal Welfare School | 0 | 0.00 | 0 | - | ||||
| 4 | Playground(0.4 ha/ 1,000 people) | NA | 17.04 | - | 7.12 | 9 | 12.30 | 9 | 19.42 |
| 5 | Sports Complex(20 ha/ 50,000 people) | - | - | 0 | 0.00 | 0 | 0.00 | ||
| 6 | Park/ Garden(0.2 ha/ 1,000 people) | NA | 8.52 | - | 0.00 | 5 | 9.44 | 5 | 9.44 |
| 7 | Regional Parks(10 ha/ 50,000 people) | - | 1 | 59.57 | 1 | 59.57 | |||
| 8 | Dispensaries/ Maternity Home(1 per 10,000 people of 0.25 ha size) | 5 | 1.25 | 3 | - | 2 | 0.49 | 5 | - |
| 9 | Intermediate Hospital | 0 | 0.00 | 0.00 | - | 0 | 0.00 | 0 | - |
| 10 | Rural Hospital | 0 | 0.00 | 0 | 0.00 | ||||
| 11 | Vegetable Market(0.2 ha per 10,000 people) | NA | 0.85 | - | - | 1 | 1.11 | ||
A- 114
| Nagpur Metropolitan Area Development Plan 2011-2032 Population 2027 : 42,588PROFORMA B - Sector : South AReservations for Public Amenities in the NMA Development Plan 2032 | |||||||||
| No | Amenity | Amenities required as per norms | Existing Amenities | Proposed amenities in the DP 2032 | Total provisions | ||||
| No | Area (ha) | No | Area (ha) | No | Area (ha) | No | Area (ha) | ||
| A | B | C | D | E | F | G | H | J | K |
| 28 | Exhibition ground | NA | NA | - | - | 1 | 110.59 | 1 | 110.59 |
| 29 | District Court Complex | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 30 | Jail | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 32 | Reserved for Affordable Housing | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 33 | Poilce Station | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 34 | Intake well and Sewage pumping station | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 35 | Agricultural Produce Market | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 36 | Rail Logistic Hub | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 37 | Multi Modal Transport Hub | NA | NA | - | - | 1 | 28.37 | 1 | 28.37 |
| Total | 39 | 296.84 | 57 | 302.61 | |||||
A- 115
| Nagpur Metropolitan Area Development Plan 2011-2032 Population 2027 : 72,732PROFORMA B - Sector : South BReservations for Public Amenities in the NMA Development Plan 2032 | |||||||||
| No | Amenity | Amenities required as per norms | Existing Amenities | Proposed amenities in the DP 2032 | Total provisions | ||||
| No | Area (ha) | No | Area (ha) | No | Area (ha) | No | Area (ha) | ||
| A | B | C | D | E | F | G | H | J | K |
| 1 | Primary School(0.4 ha per 500 students) | 22 | - | 16 | 7 | 4.07 | 23 | - | |
| 2 | Secondary School(1.125 ha per 750 students) | 7 | - | 7 | 1 | 1.41 | 8 | - | |
| 3 | Tribal Welfare School | 1 | 14.11 | 1 | - | ||||
| 4 | Playground(0.4 ha/ 1,000 people) | NA | 29.95 | - | 0.11 | 16 | 31.08 | 16 | 31.19 |
| 5 | Sports Complex(20 ha/ 50,000 people) | - | - | 0 | 0.00 | 0 | 0.00 | ||
| 6 | Park/ Garden(0.2 ha/ 1,000 people) | NA | 14.98 | - | 0.00 | 8 | 17.00 | 8 | 17.00 |
| 7 | Regional Parks(10 ha/ 50,000 people) | - | 1 | 29.46 | 1 | 29.46 | |||
| 8 | Dispensaries/ Maternity Home(1 per 10,000 people of 0.25 ha size) | 3 | 0.75 | 1 | - | 2 | 0.61 | 3 | - |
| 9 | Intermediate Hospital | 1 | 1.25 | 0.00 | - | 0 | 0.00 | 0 | 0.00 |
| 10 | Rural Hospital | 1 | 4.04 | 1 | - | ||||
| 11 | Vegetable Market(0.2 ha per 10,000 people) | NA | 1.50 | - | - | 1 | |||
A- 116
| Nagpur Metropolitan Area Development Plan 2011-2032 Population 2027 : 72,732PROFORMA B - Sector : South BReservations for Public Amenities in the NMA Development Plan 2032 | |||||||||
| No | Amenity | Amenities required as per norms | Existing Amenities | Proposed amenities in the DP 2032 | Total provisions | ||||
| No | Area (ha) | No | Area (ha) | No | Area (ha) | No | Area (ha) | ||
| A | B | C | D | E | F | G | H | J | K |
| 27 | Parking | NA | NA | - | - | 2 | 1.25 | 2 | 1.25 |
| 28 | Exhibition ground | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 29 | District Court Complex | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 30 | Jail | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 32 | Reserved for Affordable Housing | NA | NA | - | - | 1 | 10.22 | 1 | 10.22 |
| 33 | Poilce Station | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 34 | Intake well and Sewage pumping station | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 35 | Agricultural Produce Market | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 36 | Rail Logistic Hub | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 37 | Multi Modal Transport Hub | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| Total | 50 | 121.68 | 74 | 97.55 | |||||
A- 117
| Nagpur Metropolitan Area Development Plan 2011-2032 Population 2027 : 63,137PROFORMA B - Sector : South CReservations for Public Amenities in the NMA Development Plan 2032 | |||||||||
| No | Amenity | Amenities required as per norms | Existing Amenities | Proposed amenities in the DP 2032 | Total provisions | ||||
| No | Area (ha) | No | Area (ha) | No | Area (ha) | No | Area (ha) | ||
| A | B | C | D | E | F | G | H | J | K |
| 1 | Primary School(0.4 ha per 500 students) | 19 | - | 20 | 2 | 0.91 | 22 | - | |
| 2 | Secondary School(1.125 ha per 750 students) | 6 | - | 10 | 0 | 0.00 | 10 | - | |
| 3 | Tribal Welfare School | 0 | 0.00 | 0 | - | ||||
| 4 | Playground(0.4 ha/ 1,000 people) | NA | 29.95 | - | 0.00 | 10 | 30.86 | 10 | 30.86 |
| 5 | Sports Complex(20 ha/ 50,000 people) | - | - | - | 0 | 0.00 | 0 | 0.00 | |
| 6 | Park/ Garden(0.2 ha/ 1,000 people) | NA | 14.98 | - | 0.00 | 6 | 16.03 | 6 | 16.03 |
| 7 | Regional Parks(10 ha/ 50,000 people) | - | - | - | 0 | 0.00 | 0 | 0.00 | |
| 8 | Dispensaries/ Maternity Home(1 per 10,000 people of 0.25 ha size) | 2 | 7 | - | 2 | 0.47 | 9 | - | |
| 9 | Intermediate Hospital | 1 | 1.25 | 0.00 | - | 1 | 1.89 | 1 | - |
| 10 | Rural Hospital | 0 | 0.00 | 0 | 0.00 | ||||
| 11 | Vegetable Market(0.2 ha per 10,000 people) | NA | 1.26 | - | - | ||||
A- 118
| Nagpur Metropolitan Area Development Plan 2011-2032 Population 2027 : 63,137PROFORMA B - Sector : South CReservations for Public Amenities in the NMA Development Plan 2032 | |||||||||
| No | Amenity | Amenities required as per norms | Existing Amenities | Proposed amenities in the DP 2032 | Total provisions | ||||
| No | Area (ha) | No | Area (ha) | No | Area (ha) | No | Area (ha) | ||
| A | B | C | D | E | F | G | H | J | K |
| 27 | Parking | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 28 | Exhibition ground | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 29 | District Court Complex | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 30 | Jail | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 32 | Reserved for Affordable Housing | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 33 | Poilce Station | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 34 | Intake well and Sewage pumping station | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 35 | Agricultural Produce Market | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 36 | Rail Logistic Hub | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 37 | Multi Modal Transport Hub | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| Total | 29 | 55.70 | 66 | 52.43 | |||||
A- 119
| Nagpur Metropolitan Area Development Plan 2011-2032 Population 2027 : 56,941PROFORMA B - Sector : South DReservations for Public Amenities in the NMA Development Plan 2032 | |||||||||
| No | Amenity | Amenities required as per norms | Existing Amenities | Proposed amenities in the DP 2032 | Total provisions | ||||
| No | Area (ha) | No | Area (ha) | No | Area (ha) | No | Area (ha) | ||
| A | B | C | D | E | F | G | H | J | K |
| 1 | Primary School(0.4 ha per 500 students) | 17 | - | 21 | 1 | 0.46 | 22 | - | |
| 2 | Secondary School(1.125 ha per 750 students) | 6 | - | 4 | 2 | 2.71 | 6 | - | |
| 3 | Tribal Welfare School | 0 | 0.00 | 0 | - | ||||
| 4 | Playground(0.4 ha/ 1,000 people) | NA | 22.78 | - | 0.02 | 11 | 25.20 | 11 | 25.22 |
| 5 | Sports Complex(20 ha/ 50,000 people) | - | - | - | 0 | 0.00 | 0 | 0.00 | |
| 6 | Park/ Garden(0.2 ha/ 1,000 people) | NA | 11.39 | - | 0.00 | 7 | 14.09 | 7 | 14.09 |
| 7 | Regional Parks(10 ha/ 50,000 people) | - | - | - | 1 | 17.31 | 1 | 17.31 | |
| 8 | Dispensaries/ Maternity Home(1 per 10,000 people of 0.25 ha size) | 6 | 1.50 | 2 | - | 4 | 1.82 | 6 | - |
| 9 | Intermediate Hospital | 0 | 0.00 | 0.00 | - | 0 | 0.00 | 0 | - |
| 10 | Rural Hospital | 0 | 0.00 | 0 | 0.00 | ||||
| 11 | Vegetable Market(0.2 ha per 10,000 people) | NA | 1.14 | - | - | ||||
A- 120
| Nagpur Metropolitan Area Development Plan 2011-2032 Population 2027 : 56,941PROFORMA B - Sector : South DReservations for Public Amenities in the NMA Development Plan 2032 | |||||||||
| No | Amenity | Amenities required as per norms | Existing Amenities | Proposed amenities in the DP 2032 | Total provisions | ||||
| No | Area (ha) | No | Area (ha) | No | Area (ha) | No | Area (ha) | ||
| A | B | C | D | E | F | G | H | J | K |
| 27 | Parking | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 28 | Exhibition ground | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 29 | District Court Complex | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 30 | Jail | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 32 | Reserved for Affordable Housing | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 33 | Poilce Station | NA | NA | - | - | 2 | 1.76 | 2 | 1.76 |
| 34 | Intake well and Sewage pumping station | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 35 | Agricultural Produce Market | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 36 | Rail Logistic Hub | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 37 | Multi Modal Transport Hub | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| Total | 39 | 101.72 | 66 | 96.75 | |||||
A- 121
| Nagpur Metropolitan Area Development Plan 2011-2032 Population 2027 : 251,502PROFORMA B - Sector : West AReservations for Public Amenities in the NMA Development Plan 2032 | |||||||||
| No | Amenity | Amenities required as per norms | Existing Amenities | Proposed amenities in the DP 2032 | Total provisions | ||||
| No | Area (ha) | No | Area (ha) | No | Area (ha) | No | Area (ha) | ||
| A | B | C | D | E | F | G | H | J | K |
| 1 | Primary School(0.4 ha per 500 students) | 75 | - | 49 | 30 | 14.83 | 79 | - | |
| 2 | Secondary School(1.125 ha per 750 students) | 25 | - | 35 | 0 | 0.00 | 35 | - | |
| 3 | Tribal Welfare School | 0 | 0.00 | 0 | - | ||||
| 4 | Playground(0.4 ha/ 1,000 people) | NA | 100.60 | - | 13.16 | 41 | 92.04 | 41 | 105.20 |
| 5 | Sports Complex(20 ha/ 50,000 people) | 2 | - | - | - | 1 | 10.39 | 1 | 10.39 |
| 6 | Park/ Garden(0.2 ha/ 1,000 people) | NA | 50.30 | - | 0.00 | 27 | 50.70 | 27 | 50.70 |
| 7 | Regional Parks(10 ha/ 50,000 people) | 2.00 | - | - | 0 | 0.00 | 0 | 0.00 | |
| 8 | Dispensaries/ Maternity Home(1 per 10,000 people of 0.25 ha size) | 15 | 3.75 | 9 | - | 7 | 2.01 | 16 | - |
| 9 | Hospital | 2 | 2.50 | 1.00 | - | 1 | 1.23 | 2 | - |
| 10 | Rural Hospital | 0 | 0.00 | 0 | 0.00 | ||||
| 11 | Vegetable Market(0.2 ha per 10,000 people) | NA | 5.03 | - | |||||
A- 122
| Nagpur Metropolitan Area Development Plan 2011-2032 Population 2027 : 251,502PROFORMA B - Sector : West AReservations for Public Amenities in the NMA Development Plan 2032 | |||||||||
| No | Amenity | Amenities required as per norms | Existing Amenities | Proposed amenities in the DP 2032 | Total provisions | ||||
| No | Area (ha) | No | Area (ha) | No | Area (ha) | No | Area (ha) | ||
| A | B | C | D | E | F | G | H | J | K |
| 27 | Parking | NA | NA | - | - | 2 | 1.08 | 2 | 1.08 |
| 28 | Exhibition ground | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 29 | District Court Complex | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 30 | Jail | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 32 | Reserved for Affordable Housing | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 33 | Poilce Station | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 34 | Intake well and Sewage pumping station | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 35 | Agricultural Produce Market | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 36 | Rail Logistic Hub | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 37 | Multi Modal Transport Hub | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| Total | 135 | 271.26 | 229 | 266.34 | |||||
A- 123
| Nagpur Metropolitan Area Development Plan 2011-2032 Population 2027 : 64,037PROFORMA B - Sector : West BReservations for Public Amenities in the NMA Development Plan 2032 | |||||||||
| No | Amenity | Amenities required as per norms | Existing Amenities | Proposed amenities in the DP 2032 | Total provisions | ||||
| No | Area (ha) | No | Area (ha) | No | Area (ha) | No | Area (ha) | ||
| A | B | C | D | E | F | G | H | J | K |
| 1 | Primary School(0.4 ha per 500 students) | 19 | - | 16 | 4 | 2.50 | 20 | - | |
| 2 | Secondary School(1.125 ha per 750 students) | 6 | - | 8 | 0 | 0.00 | 8 | - | |
| 3 | Tribal Welfare School | 0 | 0.00 | 0 | - | ||||
| 4 | Playground(0.4 ha/ 1,000 people) | NA | 25.61 | - | 1.57 | 20 | 25.30 | 20 | 26.87 |
| 5 | Sports Complex(20 ha/ 50,000 people) | - | - | - | 0 | 0.00 | 0 | 0.00 | |
| 6 | Park/ Garden(0.2 ha/ 1,000 people) | NA | 12.81 | - | 0.00 | 12 | 14.45 | 12 | 14.45 |
| 7 | Regional Parks(10 ha/ 50,000 people) | - | - | - | 0 | 0.00 | 0 | 0.00 | |
| 8 | Dispensaries/ Maternity Home(1 per 10,000 people of 0.25 ha size) | 7 | 1.75 | 1 | - | 6 | 1.74 | 6 | - |
| 9 | Intermediate Hospital | 0 | 0.00 | 0.00 | - | 0 | 0.00 | 0 | - |
| 10 | Rural Hospital | 0.00 | 0 | 0.00 | 0 | 0.00 | |||
| 11 | Vegetable Market(0.2 ha per 10,000 people) | NA | 1.28 | - | |||||
A- 124
| Nagpur Metropolitan Area Development Plan 2011-2032 Population 2027 : 64,037PROFORMA B - Sector : West BReservations for Public Amenities in the NMA Development Plan 2032 | |||||||||
| No | Amenity | Amenities required as per norms | Existing Amenities | Proposed amenities in the DP 2032 | Total provisions | ||||
| No | Area (ha) | No | Area (ha) | No | Area (ha) | No | Area (ha) | ||
| A | B | C | D | E | F | G | H | J | K |
| 28 | Exhibition ground | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 29 | District Court Complex | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 30 | Jail | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 32 | Reserved for Affordable Housing | NA | NA | - | - | 1 | 9.86 | 1 | 9.86 |
| 33 | Poilce Station | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 34 | Intake well and Sewage pumping station | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 35 | Agricultural Produce Market | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 36 | Rail Logistic Hub | NA | NA | - | - | 1 | 140.47 | 1 | 140.47 |
| 37 | Multi Modal Transport Hub | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| Total | 55 | 204.67 | 79 | 201.99 | |||||
A- 125
| PROFORMA B - Sector : Outside sectorReservations for Public Amenities in the NMA Development Plan 2031 | |||||||||
| No | Amenity | Amenities required as per norms | Existing Amenities | Proposed amenities in the DP 2031 | Total provisions | ||||
| No | Area (ha) | No | Area (ha) | No | Area (ha) | No | Area (ha) | ||
| A | B | C | D | E | F | G | H | J | K |
| 1 | Primary School(0.4 ha per 500 students) | - | 0 | 0.00 | 0 | - | |||
| 2 | Secondary School(1.125 ha per 750 students) | - | 0 | 0.00 | 0 | - | |||
| 3 | Tribal Welfare School | 0 | 0.00 | 0 | - | ||||
| 4 | Playground(0.4 ha/ 1,000 people) | NA | - | 0 | 0.00 | 0 | - | ||
| 5 | Sports Complex(20 ha/ 50,000 people) | 0 | - | - | - | 0 | 0.00 | 0 | - |
| 6 | Park/ Garden(0.2 ha/ 1,000 people) | NA | - | - | 0 | 0.00 | 0 | - | |
| 7 | Regional Parks(10 ha/ 50,000 people) | - | - | - | 0 | 0.00 | 0 | - | |
| 8 | Dispensaries/ Maternity Home(1 per 10,000 people of 0.25 ha size) | - | 0 | 0.00 | 0 | - | |||
| 9 | Intermediate Hospital | 0 | 0.00 | 0.00 | - | 0 | 0.00 | 0 | - |
| 10 | Rural Hospital | 0 | 0.00 | 0 | - | ||||
| 11 | Vegetable Market(0.2 ha per 10,000 people) | NA | 0.00 | - | - | 0 | 0.00 | 0 | - |
| 12 | Library(Library of 0.05 ha for 10,000 people; | NA | 0.00 | ||||||
A- 126
| PROFORMA B - Sector : Outside sectorReservations for Public Amenities in the NMA Development Plan 2031 | |||||||||
| No | Amenity | Amenities required as per norms | Existing Amenities | Proposed amenities in the DP 2031 | Total provisions | ||||
| No | Area (ha) | No | Area (ha) | No | Area (ha) | No | Area (ha) | ||
| A | B | C | D | E | F | G | H | J | K |
| 29 | District Court Complex | NA | NA | - | - | 1 | 6.26 | 1 | 6.26 |
| 30 | Jail | NA | NA | - | - | 1 | 43.62 | 1 | 43.62 |
| 32 | Reserved for Affordable Housing | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 33 | Poilce Station | NA | NA | - | - | 6 | 3.57 | 6 | 3.57 |
| 34 | Intake well and Sewage pumping station | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 35 | Agricultural Produce Market | NA | NA | - | - | 1 | 47.70 | 1 | 47.70 |
| 36 | Rail Logistic Hub | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| 37 | Multi Modal Transport Hub | NA | NA | - | - | 0 | 0.00 | 0 | 0.00 |
| Total | 85 | 398.0 | 85.0 | 398.0 | |||||