- 1 Preamble....1-1
- 1.1 Need for Organised Planning within the Nagpur Metropolitan Area....1-1
- 1.2 Appointment of the Nagpur Improvement Trust as the Special Planning Authority....1-1
- 1.3 Preparation of the Draft Development Plan 2012-2032....1-1
- 1.4 The Statutory process for Preparation of the Development Plan as per the MRTP Act, 1966..1-2
- 2 Introduction to the Nagpur Metropolitan Area....2-1
- 2.1 Project Area....2-1
- 2.1.1 Boundary and Extents....2-1
- 2.1.2 Changes to the Extents and Area Notified as the NMA....2-2
- 2.2 Location and Regional Setting....2-3
- 2.3 History of Evolution of the Metropolis....2-5
- 2.3.1 Overview....2-5
- 2.3.2 Genesis of Nagpur – Pre-colonial Period....2-5
- 2.3.3 Capital of the Central and Berar Province – Colonial Period....2-6
- 2.3.4 Development of the Modern City and Establishment of NIT – Colonial Period....2-8
- 2.3.5 Centre for Defence and Industries - Post-independence Period....2-11
- 2.3.6 Organised Industrial Development Activity and Growth around City Limits....2-12
- 2.3.7 Census Towns and Growing Urban Areas in the NMA....2-13
- 2.3.8 Forests and rural farmlands....2-13
- 2.4 Past Planning Efforts....2-15
- 2.4.1 Overview....2-15
- 2.4.2 Development Plan for Nagpur City....2-15
- 2.4.3 Regional Plan 1971-1991....2-16
- 2.4.4 Regional Plan 1991-2011....2-17
- 2.5 Civic Administration....2-19
- 3 Physical Features and Natural Resources....3-1
- 3.1 Topography and Landscape....3-1
- 3.2 Geology....3-2
- 3.2.1 Geomorphology....3-2
- 3.2.2 Soil Type and Textures....3-5
- 3.2.3 Rocks and Minerals....3-7
- 3.3 Climatology....3-8
- 3.3.1 Temperature....3-9
- 3.3.2 Rainfall....3-9
- 3.3.3 Humidity....3-11
- 3.3.4 Cloud Cover....3-12
- 3.3.5 Solar Radiation and Potential for Solar Energy Generation....3-12
- 3.3.6 Wind....3-15
- 3.3.7 Air Quality....3-17
- 3.4 Water Resources....3-19
- 3.4.1 Surface water....3-19
- 3.4.2 Ground Water....3-21
- 3.4.3 Water quality....3-22
vii
- 3.5 Agriculture and cropping pattern....3-25
- 3.5.1 Cropping seasons....3-25
- 3.6 Vulnerability to Disasters....3-25
- 3.6.1 Seismicity....3-25
- 3.6.2 Floods....3-28
- 3.6.3 Cyclones....3-29
- 3.7 Biological Environment....3-30
- 3.7.1 Forests....3-30
- 3.7.2 Flora and Fauna....3-32
- 3.7.3 Protected Areas....3-32
- 3.8 Environmental challenges in the NMA....3-33
- 3.8.1 Impact of Mining Activities....3-33
- 3.8.2 Air Pollution due to Thermal Power Plants....3-36
- 3.8.3 Impact of Ash Ponds on Ground Water Quality....3-37
- 4 Demographic Profile....4-1
- 4.1 Introduction....4-1
- 4.2 Population Distribution Across NMA....4-1
- 4.3 Population Distribution in Ranges....4-2
- 4.4 Population Densities across Villages and Tehsils....4-3
- 4.5 Demographic Profile....4-3
- 4.5.1 Decadal Growth....4-4
- 4.6 Rural-Urban Composition....4-6
- 4.7 Rural and Urban Population Growth Trends within NMA....4-8
- 4.8 Literacy....4-10
- 4.9 Gender Distribution....4-13
- 4.10 Age Group wise Sex Distribution....4-14
- 4.11 Key Findings....4-16
- 5 Economic Profile....5-1
- 5.1 Economic Resource Base....5-1
- 5.1.1 Agriculture....5-1
- 5.1.2 Citrus Production....5-6
- 5.1.3 Floriculture....5-6
- 5.1.4 Mineral Resources....5-6
- 5.1.5 Fisheries....5-8
- 5.1.6 Sericulture....5-8
- 5.2 District Domestic Product....5-10
- 5.2.1 GDDP Distribution....5-10
- 5.2.2 NMA Contribution to GDDP....5-14
- 5.3 Workforce Participation in NMA....5-15
- 5.4 Sectoral Employment in NMA....5-15
- 5.4.1 Main Workers' Composition in NMA....5-16
- 5.5 Sectoral Employment in Nagpur City....5-17
- 5.6 Industrial Development....5-18
- 5.6.1 Policy Framework - The Industrial, Investment, Infrastructure Policy 2006....5-18
- 5.6.2 Industrial Incentives....5-19
- 5.6.3 Enterprises in Nagpur....5-20
viii
- 5.6.4 Industrial Estates in Nagpur....5-21
- 5.6.5 Large Scale Industries in NMA....5-23
- 5.6.6 Micro, Small and Medium Enterprises in NMA....5-24
- 5.6.7 Information Technology Services in NMA....5-26
- 5.6.8 Investments Proposed in and Around NMA....5-28
- 5.6.9 Multi-modal International Airport Hub, Nagpur (MIHAN)....5-29
- 5.7 Tourism....5-31
- 5.8 Other Indicators....5-32
- 5.8.1 Electricity Consumption....5-32
- 5.9 Credit Off-take in Nagpur District....5-35
- 5.10 Air Traffic....5-36
- 5.10.1 Passenger Traffic....5-36
- 5.10.2 Cargo Movements....5-37
- 5.11 Situation Assessment....5-38
- 5.12 Key Findings....5-39
- Existing Land Use....6-1
- 6.1 General....6-1
- 6.1.1 Mapping Process....6-1
- 6.1.2 ELU for the Overall NMA....6-1
- 6.1.3 ELU in Areas Identified as Growth Centres in the Nagpur District Regional Plan 2011....6-1
- 6.1.4 Growth Trends....6-1
- 6.2 Base Map and Existing Land Use Mapping – Methods and Processes....6-2
- 6.2.1 Preparation of the Base Map....6-2
- 6.2.2 Preparation of the Existing Land Use map....6-4
- 6.3 Existing Land Uses in the Overall NMA....6-5
- 6.3.1 Overview....6-5
- 6.3.2 Residential....6-8
- 6.3.3 Commercial....6-10
- 6.3.4 Industrial....6-12
- 6.3.5 Public and Semi-public....6-14
- 6.3.6 Transport....6-14
- 6.3.7 Defence Area....6-14
- 6.3.8 Public Utilities....6-15
- 6.3.9 Mines and Quarries....6-15
- 6.3.10 Agriculture....6-17
- 6.3.11 Forests....6-17
- 6.3.12 Water Bodies....6-18
- 6.4 Existing Land Use by Tehsils....6-18
- 6.5 Existing Land Use in the Regional Plan 2011 Growth Centres....6-20
- 6.5.1 Growth Centres in NMA....6-20
- 6.6 Growth Trends....6-23
- 6.6.1 5 km Buffer outside the Nagpur City Boundary....6-24
- 6.6.2 1 km Buffer along National Highways....6-26
- 6.6.2.1 NH-7 - North (Jabalpur road)....6-27
- 6.6.2.2 NH-7 in the South (Wardha road)....6-28
- 6.6.2.3 NH-6 in the East (Bhandara Road)....6-29
- 6.6.2.4 NH-6 in the West (Amravati road)....6-31
ix
- 6.6.2.5 NH-69 in the North (Saoner road)....6-32
- 6.6.3 NA Permissions....6-34
- Transportation Infrastructure....7-1
- 7.1 Introduction....7-1
- 7.2 Existing Transport System....7-1
- 7.2.1 Regional Connectivity....7-1
- 7.2.2 Transport and logistics in NMA....7-4
- 7.2.3 Vehicle Growth Trends....7-8
- 7.2.4 Accident Trends....7-10
- 7.2.5 Past Traffic Data Comparison....7-11
- 7.3 Review of Past Traffic Studies....7-11
- 7.3.1 Nagpur District Regional Plan....7-12
- 7.3.2 Study for Integrated Road Development Plan (IRDP)....7-13
- 7.3.3 Study for Mass Rapid Transportation System....7-13
- 7.3.4 Study for Multi-Modal International Hub Airport at Nagpur (MIHAN)....7-14
- 7.4 Traffic Data Collection....7-15
- 7.4.1 Primary Data....7-15
- 7.4.2 Secondary Data....7-16
- 7.5 Prevailing Traffic Scenario....7-18
- 7.5.1 Traffic Characteristics....7-19
- 7.5.2 Travel Pattern....7-26
- 7.5.3 Road Network Characteristics....7-34
- 7.6 Passenger/Freight Terminals....7-40
- 7.6.1 Bus Terminals....7-41
- 7.6.2 Freight Terminals....7-45
- 7.6.3 Existing logistics facilities....7-48
- 7.6.4 Truck parking....7-51
- 7.6.5 Rail Terminals....7-53
- 7.6.6 Air Terminals....7-53
- 7.7 Non-Motorized and Pedestrian Movement....7-54
- 7.8 Key Issues and Observations....7-55
- 7.8.1 Road condition....7-55
- 7.8.2 Level Crossings, Narrow Bridges and Bottlenecks....7-55
- 7.8.3 Intersection Geometry and Control....7-56
- 7.8.4 Road Markings and Traffic Signage....7-57
- 7.8.5 Public Transport Terminals/Facilities....7-58
- 7.8.6 Freight Terminals and Facilities....7-59
- 7.8.7 Non-Motorized and Pedestrian Traffic....7-59
- 8 Utilities and Services....8-1
- 8.1 Water Supply....8-1
- 8.1.1 Ground Water Sources....8-1
- 8.1.2 Surface Water Sources....8-8
- 8.1.3 Short and Medium Term Availability of Fresh Water in NMA....8-15
- 8.1.4 Long Term Availability of Fresh Water in NMA....8-16
- 8.1.5 Existing Water Supply Mechanism in Nagpur District....8-17
x
- 8.1.6 Existing Water Supply Scenario in the Surrounding Municipal Corporation and Councils .....8-17
- 8.1.7 Existing Rural Water Supply Status in the NMA....8-21
- 8.1.8 Existing Water supply for irrigation in Nagpur district....8-23
- 8.1.9 Ongoing and Proposed Water Supply Projects ....8-23
- 8.1.10 Demand Supply Gap from the Potential Water Sources....8-24
- 8.2 Power Supply....8-25
- 8.2.1 Introduction....8-25
- 8.2.2 Power Supply Scenario in the State....8-25
- 8.2.3 Existing Power Demand by Tehsils in the NMA....8-26
- 8.2.4 Existing and Proposed Power Generation Capacity ....8-27
- 8.2.5 Power Transmission and Distribution Networks....8-29
- 8.2.6 Renewable Energy Resources....8-35
- 8.3 Drainage and Sewerage....8-36
- 8.3.1 Natural Drainage Pattern and Topography ....8-36
- 8.3.2 Existing Storm Water Drainage System....8-38
- 8.3.3 Storm Water Drainage Proposals and Flood Management....8-40
- 8.3.4 Rain Water Harvesting....8-40
- 8.3.5 Areas with Water Logging Issues....8-41
- 8.4 Disposal of Solid Waste ....8-41
- 8.4.1 Existing Sewerage System in the NMC and Municipal Councils....8-41
- 8.4.2 Re-use of Treated Sewage Effluent ....8-42
- 8.4.3 Ongoing and Proposed Projects for Augmenting the Existing Sewerage Systems ....8-42
- 8.5 Telecommunications ....8-44
- 8.5.1 Telecommunications in Maharashtra....8-44
- 8.5.2 Telecommunications in NMA ....8-44
- 8.6 Gas....8-45
- 8.6.1 General ....8-45
- 8.6.2 Gas network in Maharashtra and the NMA ....8-45
- 8.7 Solid Waste Management ....8-47
- 8.7.1 Waste Generation in the NMA ....8-47
- 8.7.2 Existing Mechanism Solid Waste Disposal in the NMC Limits....8-47
- 8.7.3 Existing landfill site ....8-50
- 8.8 Key Observations....8-50
- 8.8.1 Water Supply ....8-50
- 8.8.2 Power Supply....8-52
- 8.8.3 Sewerage System....8-52
- 8.8.4 Storm Water Drainage ....8-53
- 8.8.5 Solid Waste Management ....8-54
- Social Infrastructure ....9-2
- 9.1 Introduction....9-2
- 9.2 Education....9-3
- 9.2.1 Schools....9-3
- 9.2.2 Distribution of Primary Schools in the NMA ....9-4
- 9.2.3 Distribution of Middle and Secondary Schools in the NMA ....9-7
- 9.2.4 Higher education facilities....9-9
- 9.3 Medical Facilities ....9-9
- 9.3.1 Rural health care system in NMA ....9-10
xi
- 9.3.2 Rural Hospitals....9-15
- 9.4 Recreational and Entertainment Facilities....9-17
- 9.4.1 Overview....9-17
- 9.4.2 Recreational areas and facilities within NMA....9-17
- 9.4.3 Existing condition of tourism infrastructure....9-19
- 10 Key Findings and Conclusions....10-2
- 10.1 SWOT Analysis....10-2
- 10.2 Key findings of the existing conditions analysis for the NMA....10-4
- 11 Vision, Goals and Development Policies....11-1
- 11.1 Introduction....11-1
- 11.2 Vision and Planning Framework for the NMA....11-1
- 11.2.1 Economic Growth....11-1
- 11.2.2 Environmental and Natural Resource Stewardship....11-1
- 11.2.3 Development and Integration of Urban Systems....11-2
- 11.3 The Structure Plan....11-3
- 11.3.1 Land Use and Transportation....11-3
- 11.3.2 Jobs to Housing Balance and Mix of Uses....11-4
- 11.3.3 Open Spaces and Natural Resource Management....11-5
- 11.3.4 Provision of Social Amenities....11-6
- 11.4 The Rural-Urban Transect....11-7
- 11.4.1 Development Density....11-8
- 11.4.2 Local Transport Connectivity....11-9
- 11.4.3 Scale and Typology....11-9
- 11.4.4 Grain of Development....11-9
- 11.4.5 Public Transit Spread....11-10
- 11.4.6 Open Space Typology....11-10
- 11.4.7 Economic Base....11-11
- 11.4.8 Infrastructure Provision....11-11
- 11.4.9 Sustainability....11-12
- 12 Population Projections and Distribution....12-1
- 12.1 Introduction....12-1
- 12.2 Base Year and Plan Period....12-1
- 12.3 Analysis of Demographic Trends....12-1
- 12.3.1 Understanding Macro Trends in Population Growth....12-1
- 12.3.2 Determinants of Population Growth....12-2
- 12.3.3 NMA Population Growth Drivers....12-3
- 12.4 Population Projections Using Various Methods....12-4
- 12.4.1 Geometric Rate of Increase....12-4
- 12.4.2 Arithmetic Method....12-5
- 12.4.3 Incremental Increase Method....12-5
- 12.4.4 Cohort Component Method....12-6
- 12.4.4.1 Low Growth and Business as Usual Case....12-7
- 12.4.4.2 Strong Growth....12-7
- 12.4.4.3 Accelerated Growth....12-8
- 12.4.4.4 Staggered Growth....12-8
- 12.5 Comparison of Population Projection Methods and Choice of Method....12-10
xii
- 12.5.1 Comparison of Various Methods....12-10
- 12.5.2 Choice of Method....12-10
- 12.5.3 Growth Rate for the NMA and Conclusion on Population Projections....12-11
- 12.6 Employment Projections....12-11
- 12.6.1 Employment Projections for Migration Rate of 30 Percent....12-11
- 12.7 Key Growth Drivers, Potential Investment Themes and Growth Strategies....12-13
- 12.7.1 Key Growth Drivers....12-13
- 12.7.1.1 MIHAN....12-13
- 12.7.1.2 Logistics and Warehousing....12-13
- 12.7.1.3 Mineral Resources....12-13
- 12.7.1.4 Tourism....12-13
- 12.7.4.5 Skilled Manpower Availability....12-14
- 12.7.2 Key Potential Investment Themes....12-14
- 12.7.2.1 Steel Production....12-14
- 12.7.2.2 Paper and Pulp Industries....12-14
- 12.7.2.3 Modular/Wooden Furniture....12-14
- 12.7.2.4 Education....12-14
- 12.7.2.5 Healthcare....12-14
- 12.7.2.6 Cotton and Textiles....12-15
- 12.7.3 Key Strategies....12-15
- 12.7.3.1 Flagship Economic Zones....12-15
- 12.7.3.2 Effective Marketing and Management....12-16
- 12.8 Distribution of Population and Employment....12-16
- 12.8.1 Distribution of Population in Villages....12-16
- 12.8.2 Employment Centres and Distribution of Future Workers....12-18
- 12.9 Planning Sectors....12-20
- 12.9.1 Delineation of Planning Sectors....12-20
- 12.9.2 Rural Centres....12-20
- 12.9.3 Improvement Scheme....12-22
- 12.9.4 Summary of Population Distribution....12-23
- Planning Proposals....13-1
- 13.1 Introduction....13-1
- 13.2 The Proposed Land Use Plan....13-1
- 13.2.1 The Proposed Land Use Budget....13-1
- 13.3 Proposed Land Use Zones....13-2
- 13.3.1 Residential....13-2
- 13.3.2 Commercial....13-6
- 13.3.3 Industrial....13-6
- 13.3.4 Public Semi-public....13-7
- 13.3.5 Open Space and Recreation....13-7
- 13.3.6 Agriculture....13-7
- 13.3.7 Public Utility....13-7
- 13.3.8 Transportation....13-8
- 13.3.9 Forest....13-8
- 13.3.10 Defence....13-8
- 13.3.11 Mines/Quarries....13-8
- 13.4 Reservations for Social Amenities and Public Facilities....13-8
xiii
- 13.4.1 Norms and Standards Adopted....13-9
- 13.4.2 Provision of Social Amenities and Public Facilities in Urban Sectors....13-11
- 13.4.3 Public Facilities Located Outside Urban Sectors....13-12
- 13.5 Transportation....13-17
- 13.5.1 Road Network....13-17
- 13.5.2 Strengthening the Regional Road Network....13-18
- 13.5.3 Road Network in Urban Sectors....13-18
- 13.5.4 Functional Classification of Roads....13-19
- 13.5.5 Enhancing Access for Non-Motorised Transport....13-20
- 13.5.6 Truck Terminals....13-24
- 13.5.7 Parking for Private Vehicles....13-24
- 13.5.8 Public Transportation....13-25
- 13.6 Water supply....13-28
- 13.6.1 Background....13-28
- 13.6.2 Demand Estimation for Urban Sectors in the NMA....13-29
- 13.6.3 Reducing Fresh Water Requirement through Recycle and Reuse - Long Term Strategy....13-29
- 13.6.4 Sourcing Water for the NMA in the Medium Term....13-31
- 13.6.5 Sourcing Water for the NMA in the Short-Term....13-32
- 13.6.6 Summary of Water Supply Source Identification....13-32
- 13.6.7 Water Supply Proposals....13-34
- 13.7 Sewerage Disposal....13-36
- 13.7.1 Estimation of Sewage Generation....13-36
- 13.7.2 Sewerage Proposals....13-36
- 13.8 Storm Water Drainage and Ground Water Recharge....13-37
- 13.9 Power Supply....13-37
- 13.10 Solid Waste Management....13-37
- 13.10.1 Estimation of Solid Waste Generation in the NMA....13-37
- 13.10.2 Proposals for Solid Waste Processing and Disposal....13-38
- 13.11 Key findings of existing conditions and actions taken through Plan proposals....13-38
- Development Plan Costs and Financing....14-3
- 14.1 Introduction....14-3
- 14.2 Assumptions for Calculation of Costs....14-3
- 14.2.1 Land Costs....14-3
- 14.2.2 Construction Costs....14-3
- 14.2.3 Landscaping and Land Development Costs....14-3
- 14.2.4 Road construction costs....14-2
- 14.3 Block Cost Estimates....14-2
- 14.3.1 Summary of Block Costs....14-2
- 14.3.2 Cost Components Excluded....14-2
- 14.3.3 Block Costs for Social Amenities and Public Facilities....14-3
- 14.3.4 Block Costs for Transportation Infrastructure....14-4
- 14.3.5 Block Costs for Water Supply Infrastructure....14-4
- 14.3.6 Block Costs for Sewerage Proposals....14-5
- 14.3.7 Block Costs for Storm Water Drainage and Rain Water Harvesting Proposals....14-5
- 14.3.8 Block Costs for Solid Waste Management Proposals....14-6
- 14.4 Infrastructure Phasing....14-6
xiv
- 14.4.1 Timeline for Phasing the Plan Proposals....14-6
- 14.4.2 Phase 1....14-7
- 14.4.3 Phase 2....14-8
- 14.4.4 Phase 3....14-8
- 14.5 Financing the Development Plan and Priority Proposals....14-8
- 14.5.1 NIT's Finances....14-8
- 14.5.2 Priority Project Costs and Phasing to Accelerate Growth....14-8
- 14.5.3 Revenues likely to Accrue to NIT....14-10
- 14.5.4 Summary of Estimated Revenues....14-15
- 15 Implementation of the Development Plan....15-1
- 15.1 General....15-1
- 15.2 Improvement Schemes Mechanism for Implementing Plan Proposals....15-1
- 15.2.1 Schemes to be developed under the aegis of NIT....15-2
- 15.2.2 Identification and delineation policy for improvement schemes within the NMA....15-2
- 15.2.3 Improvement Schemes in non-urban area (outside the 10 urban sectors)....15-2
- 15.2.4 Minimum and recommended size of an improvement scheme....15-3
- 15.2.5 Planning flexibility and land use change permissible....15-3
- 15.2.6 Structuring activities for undertaking improvement schemes....15-3
- 15.2.7 Operation and maintenance of infrastructure services....15-4
- 15.2.8 Funding O & M costs....15-5
- 15.2.9 SPV's mandate....15-5
- 15.2.10 Dedicated cell for Improvement Schemes....15-6
- 15.3 Other Mechanisms....15-6
- 15.3.1 Grant of Transfer of Development Rights....15-6
- 15.3.2 Accommodation Reservation....15-6
- 15.3.3 Public Private Partnership....15-7
- 15.4 Public Agencies Responsible for Implementing Plan Proposals....15-7
- 15.5 Financing Mechanism for Projects to be implemented by NIT....15-8
- 15.5.1 Projects with potential for a PPP option....15-8
- 15.5.2 Projects with potential for CSR option....15-9
xv