The previous Chapter 13 describes the planning proposals outlined for the NMA Development Plan. In this chapter block estimates for each proposal is presented.
Broad assumptions employed for calculation of costs is provided at the outset. A combined summary of costs by category of proposals precedes detailed tables describing the components and corresponding costs for each proposal.
Mechanisms for implementation of the plan proposals are closely linked with the cost estimates. Adoption implementation mechanisms such as PPP and Accommodation Reservation for certain suitable projects can result in reduction in the overall costs to be directly borne by the planning authority. The resulting remaining projects that would be funded through revenues generated by the planning authority are referred as priority projects. After exclusion of projects that could be funded using alternative mechanisms, the resulting cost of ‘priority projects’ will be lower than the total cost of DP proposals. Revenues that could be generated by NIT while administering the DP as the SPA have also been estimated and presented in this Chapter.
14.2Assumptions for Calculation of Costs
14.2.1 Land Costs
Land costs for privately owned land parcels on which reservations are located have been calculated on the basis of the Ready Reckoner 2013 procured from the office of the Joint Registrar, Nagpur District. Costs for land under government ownership are not included in the cost estimates.
14.2.2 Construction Costs
Broad average cost of construction is considered based on prevalent construction rates. Development costs are considered for all reservations irrespective of ownership.
Medical facilities –Rs. 18,000/m2
Sports complex – Rs. 15,000/m2
Schools – Rs. 12,000/sqm2
All other buildings – Rs. 10,000/m2
14.2.3 Landscaping and Land Development Costs
Broad average landscaping costs for gardens and parks and land development costs for playgrounds is considered.
Parks, gardens – Rs. 2,000/m2
Playgrounds – Rs. 750/m2
14-3
The block costs are indicative and all proposals will require feasibility studies and/ or detailed project reports before detailed costs can be calculated.
14.2.4 Road construction costs
A key assumption with regard to cost of roads is that land will be secured using the Transfer of Development Rights (TDR) mechanism. In most cases only a small part of a parcel would be affected due to a new road. Moreover the benefits on account of increased land rates for a road fronting property outweigh the actual value of land that has to be given up for construction of a road.
Cost per kilometre considered for each type of road right of way is as given in Table 14-1.
Table 14-1Cost Assumptions for Construction of Roads
Sr No
Road Right of Way
Cost per km (INR Crores)
1
12m - Urban road
2.16
2
12m - Rural road
2.28
3
15m - Urban road
2.92
4
15m - Rural road
2.41
5
18m - Urban road
3.76
6
18m - Rural road
2.34
7
24m - Urban road
5.06
8
24m - Rural road
4.51
9
30m - Urban road
6.35
10
30m - Rural road
4.63
11
36m - Urban road
8.51
12
36m - Rural road
7.03
14.3Block Cost Estimates
14.3.1 Summary of Block Costs
A summary of costs for all outlined proposals under broad categories is given in the Table 14-1. This includes all physical and social infrastructure items for Urban Sectors.
In case of roads, it includes all proposed roads in the NMA – within Urban Sectors and Regional roads. Similarly, as described in the previous chapter 12, certain reservations such as jail, solid waste disposal site are located outside of Urban Sectors.
14.3.2 Cost Components Excluded
Cost of private land for roads is not included in Table 14-2, as land will be made available through grant of TDR. Similarly development of solid waste processing and disposal facility will be implemented through the PPP mode and is not included in the cost estimates. Also, cost for mass rapid transit (metro rail) on southern corridor is not included as this is a special project with complex financing mechanisms depending on feasibility and detailed studies.
14-2
Table 14-2Summary of block costs
Description
Cost of private land (INR crores)
Development cost (INR crores)
Total cost (INR crores)
Roads
*
12,680.0
12,680.0
Other transport infrastructure
194.4
212.1
406.5
Social amenities
244.9
3,859.4
4,104.3
Open Spaces
661.0
937.5
1,598.5
Water supply
11.5
5,649.0
5,660.5
Sewerage
15.7
4,199.6
4,215.3
Storm water drainage and RWH
-
5,479.2
5,479.2
Power
21.0
-
21.0
Solid waste management
10.3
5.1
15.4
Affordable housing
88.5
1,035.7
1,124.1
Subtotal
1,247.2
34,057.5
35,304.8
Additional 5% administration costs
1,765.24
Total
37,070.02
Figure 14-1 illustrates the share of percent costs by type of proposals.
Figure 14-1 : Share of percent costs by type of proposals
14.3.3 Block Costs for Social Amenities and Public Facilities
Block costs for development of proposed social amenities is given in the Table 14-3.
Table 14-3Block costs for social amenities and open spaces proposals
S. No
Description
Private land cost
Development
Total cost
14-3
(INR crores)
cost (INR crores
(INR crores)
1
Education (Primary and secondary schools)
62.1
404.2
466.3
2
Medical
38.9
354.0
392.9
3
Open space/ recreational
661.0
937.5
1,598.5
4
Cultural (community halls, libraries, auditoria)
22.7
119.0
141.7
5
Commercial
38.0
1,105.2
1,143.2
6
Public utility facilities
25.6
174.7
200.3
7
District court complex
1.4
-
1.4
8
Jail
9.5
205.0
214.5
9
Exhibition Center
11.6
1,012.5
1,024.1
10
Sports Complex
35.1
484.8
519.9
Total
905.9
4,796.9
5,702.8
14.3.4 Block Costs for Transportation Infrastructure
Block costs for development of proposed transportation infrastructure is given in the Table 14-4.
Table 14-4Block costs for transportation infrastructure proposals
S. No
Description
Quantity Land (hectare)
Quantity- BUA (Sq.m)
Cost (Rs. crores)
1
Roads
*
12,680.0
12,680.0
2
Truck Parking
159.9
108.4
268.3
3
Public parking
11.6
79.1
90.7
4
Public transportation
0.0
0.0
0.0
5
Bus depots Total
22.9194.4
24.612,892.1
47.513,086.5
*Note: Cost of private land for roads not included as the land will be made available through TDR
14.3.5 Block Costs for Water Supply Infrastructure
Block costs for water supply proposals are given in Table 14-5 to Table 14-7.
Table 14-5Block costs for water treatment plant
S No
Description
Quantity - Land (hectare)
Quantity - MLD
Cost (INR crore)
1.2.
Private land Capacity augmentation of
0
-
0
Mahadula WTP
197.46 MLD
296.19
Total
296.19
Table 14-6Block costs for water distribution network within urban sectors
S. No
Description
Quantity
Land Cost (INR Crore)
Development Cost (INR Crores)
1
Length of rising mains from WTP to ESR
130 km
41.22
2
Private land for ESR in 10 Urban Sectors
7.83
11.51
14-4
S. No
Description
Quantity
Land Cost (INR Crore)
Development Cost (INR Crores)
3
Distribution network (based on area covered by Urban Sectors)
53,500
5285.8
Total
11.51
5,338.53
*Note: 1. Water supply distribution networks will run along the proposed roads. As the road network is not provided up to plot level, block costs for the distribution network are given based on area covered by urban uses within urban sectors.
Table 14-7Block costs for recycled water network
S. No.
Description
Quantity
Cost (INR crore)
1.
Network length for supplying recycled water to industrial zones in the NMA
14.3.6 Block Costs for Sewerage Proposals
Block costs for sewerage proposals are given in Table 14-8.
Table 14-8Block costs for sewerage proposals
S. No
Description
Quantity
Land cost (INR Crores)
Development Cost (INR. crores)
1
Network
53,500
3,964.35
2
STPs (SBR technology, including tertiary treatment)
15.99 ha
15.72
209.42
Total
15.72
4,173.77
*Note: Sewerage networks will run along the proposed roads. As the road network is not provided upto plots, block costs for the sewerage network is given based on area covered by urban uses within urban sectors.
14.3.7 Block Costs for Storm Water Drainage and Rain Water Harvesting Proposals Block costs for sewerage proposals are given in Table 14-9.
Table 14-9Block costs for storm water drainage proposals
S No
Description
Quantity (hectare)
Development Cost (INR crore)
1.
Storm water collection network
53,500
1,982.18
2.
Rain water harvesting system along with grit chamber Total
30925,074.18
14-5
14.3.8 Block Costs for Solid Waste Management Proposals
Cost of private land for solid waste processing and disposal site is given in Table 14-10.
Table 14-10Block costs for MSW processing and disposal site
Sr. No
Description
Land Cost (Rs. crores)
1
Cost of private land for waste processing and disposal site
9.31
2
Cost of private land for Transfer station at 4 locations
0.99
Total
10.30
29.81 km
10.00
2.
Network length for supplying recycled water to power plants