The past traffic studies carried out in the region were reviewed to study the various improvement proposals suggested, present status of the projects and to plan for the future transport infrastructure improvements for the NMA. The major relevant studies are:
Regional plan for Nagpur region, 1991-2011;
7-11
Traffic Studies for preparation of Integrated Road Development Plan by Crisil Advisory Services (CAS) and Frischman – Prabhu (FP) carried out for MSRDC in 2000;
Techno-economic feasibility study for Mass Rapid Transit System(MRTS) for Nagpur City by L&T – Ramboll carried out for MSRDC in 2003-2004;
Pre-feasibility of MRTS connecting Nagpur city with MIHAN and Butibori Industrial area conducted by L&T Ramboll in 2008 and
Feasibility study for a Multi-modal Hub Airport at Nagpur (MIHAN) by L&T-RAMBØLL Consulting Engineers Limited carried out for MSRDC in 2001.
7.3.1 Nagpur District Regional Plan
The Regional Plan was prepared by Nagpur Regional Planning Board for the duration 1991-2011 for planned development of Nagpur District. The plan included a number of proposals of infrastructure improvements including transportation. Important proposals under transport infrastructure under the Regional Plan are:
Development of Outer Ring road (bypasses to national and state highways) with alignment along Gausi (Manapur), Wihirgoan, Kapsi, Bhokara, Godkhairi, Fetri and Wanagongri
● Upgradation of SH-3 from Buti-Bori to Wardha/Yeotmal to national highways standards
Upgradation of SH-9 from Nagpur to Bhopal/Saoner and Saoner to Chhindwara to national highways standards
Proposals for new or upgradation of seven radial roads
Proposals for construction and upgradation of 16 existing state highways and other district roads as per Public Works Department Road Development Programme (1981-2001)
Proposals for 22 missing links in different tehsils
Development of Rail based High Capacity Mass Transportation Route (HCMTR) for serving upcoming new developments around NMC surroundings
Light Rail Transit (LRT) system along inner ring road, which was under construction during development of the plan
New rail connections that is Anjani to Kalmana and extension of defence siding up to Kalmeshwar forming a ring railway (which connect Hingna MIDC, Ambazari defence estate, New Nagpur, Kalmeshwar MIDC, Chindwara road, Koradi, Kamptee, APMC Wathoda and airport)