Water supply within the NMA and the larger region is sourced from surface and ground water sources. Based on the type and source of supply, the region can be categorised into three main categories:
urban areas including municipal corporation and municipal councils/ nagar parishads outside the NMA;
rural village settlements and census towns;
agricultural land
Water supply for urban areas is sourced from surface water sources like lakes, rivers and reservoirs to cater to the domestic, commercial, institutional, and industrial demands of city as well as ground water.
In the rural areas, water is being supplied through the rural water supply schemes implemented by agencies like the Zilla Parishad (ZP), the Maharashtra Jeevan Pradhikaran (MJP) or the Groundwater Survey and Development Agency (GSDA) that tap ground water by developing tube wells, hand pumps and bore wells. Surface water for domestic consumption is sourced from local water bodies or canals whereas irrigation of the agricultural land is being done through a combination of ground and surface water sources such as canals, tube wells and bore wells.
Water supply to the urban areas is dependent upon both surface and ground depending upon its availability. Details of major water sources available for the development of NMA are addressed below.
8.1.1Ground Water Sources
Ground water is the main source of NMA area and is being developed by two types of abstraction structures; bore wells and dug wells. Dug wells are the main ground water abstraction structures with yield
8-1
varying from 20 to 380 m3/day. Minor irrigation census data (2000-2001) indicates that area irrigated by ground water is 914.68 km2 whereas surface water accounts for 241.74 km2 of area. It shows that the ground water is main source of irrigation in the NMA accounting about 73 percent of net irrigated area. The district has a total number of 59,407 irrigation dug wells, creating an irrigation potential of 1,413.71 km2 out of which 1,236.25 km2 of irrigation potential is utilised (Source - Nagpur Regional Plan 1991-2011).
The Government of Maharasthra (GoM) has developed a large number of bore wells fitted with hand pumps and electric motors for rural drinking water supply purposes in the district. Upto the year 2006-2007, the GSDA and the GoM have developed about 9,953 bore wells for rural water supply, out of which 9,483 are fitted with hand pumps and 470 with electric pumps (Source – MJP).
The NMA lies in the Godavari river basin contributing to the catchments of Waingangā River through the Kanhan River passing from the centre of the district. The Central Ground Water Board (CGWB) has conducted several studies in the district to understand the characteristics of ground water reserves in the region and assess the development potential of Nagpur. Salient features of ground water availability within the tehsils of the NMA are summarised in Table 8-1.
Table 8-1Salient features of ground water availability
Tehsil
EW
Wells OW
PZ
Depth (mbgl)
SWL* (mbgl)
Discharge (lps)
Draw-Down (m)
Zones (mbgl)
Parshioni
17
4
2
27.5-199.64
4.05-19.6
0.08-7.76
-
6.0-163.05
Hingana
2
3
-
85.4-234.8
14.68-27.65
0.5-21.33
-
-
Nagpur (Rural)
2
-
1
76.59-159.45
24.15
1.37-2.64
-
7.0-75.0
Mauda
2
1
-
174.5-187.25
1.0
1.37-4.43
25.06-42.58
34.75-147.65
Kamptee
6
3
-
29.93-202.45
4.53-16.45
1.37-8.85
-
11.0-140.4
Saoner
8
17
1
43.0-307
2.30-29.05
0.38-14.40
8.05-31.06
5.25-140.2
Kalmeshwar
9
4
79.3-278
4.55-28.5
0.38-17.92
5.6-11.95
28.0-107
Umred
2
2
67.5-200
3.64-5.07
0.01-2.16
24.0-122
Kuhi
4
3
36.5-200
-
-
-
5.0-99.75
Total
52
35
6
27.5-307
1.0-29.05
0.01-21.33
5.6-42.58
5.0-163.05
Source: Ground Water Information Nagpur District Maharashtra, Central Region Nagpur 2009
EW -Exploratory wells, OW - Observation wells, PZ – Piezometers, mbgl – metre below ground level;* SWL: Shallow Water Level
The depths of wells vary from 6.5 to 307 metres below ground level (mbgl) across Nagpur district and ranges from 27.5-307 mbgl within the tehsils of the NMA. Quantity of discharge varies between 0.01 and 38.5 litres per second (lps) across Nagpur district and 0.01 and 21.33 lps within the NMA. The deepest water level has been recorded at Pipla village in Saoner Tehsil that is 29.05 mbgl and the deeper aquifer zones have been encountered in many wells beyond 50 m depth, the deepest being at 287.73-296.57 m at Sillewada exploratory well in Saoner Tehsil.
Dynamic ground water potential in Nagpur District:
o Net annual ground water availability: 1041.89 million cubic metres (mcm)
o Annual ground water draft (irrigation - domestic): 452.95 mcm
8-2
8-3
o Allocation for domestic and industrial requirement up to next 25 years: 102.28 mcm
o Stage of ground water development: 43.47%
Source: Ground Water Information Nagpur District Maharashtra, Central Region Nagpur 2009
Ground water control and regulation assessment in Nagpur District:
o Over-exploited tehsils None
o Critical tehsils None
o Semi-critical tehsils Katol and Narkhed
o Notified tehsil None
Source: Ground Water Information Nagpur District Maharashtra, Central Region Nagpur 2009
Ground Water Quality
The available data also reveals that the water quality in many of the villages in NMA is affected by the presence in excessive quantity of nitrate (NO3), chloride (Cl), fluoride (F), iron (Fe) and total dissolved solids (TDS). Use of the water in a particular area can be decided after getting the water quality tested. Ground water quality in parts of Nagpur city is adversely affected by nitrate contamination, whereas in Kalmeshwar and Hingna MIDC areas the contamination of ground water in the phreatic zone has been observed due to discharge of industrial effluents (Ground Water Information Nagpur District Maharashtra, Central Region Nagpur 2009).
Prevailing Ground Water level in NMA
The CGWB periodically monitors the National Hydrograph Network Stations (NHNS) across the Nagpur district four times a year that is January, May (pre-monsoon), August and November (post-monsoon) to assess the dynamics of water levels in the district. Water level depths in the area in different seasons of the year have been described under the following subheads:
o Pre-monsoon (May-2007)
The depth to water levels in the district in May 2007 ranged between 2.00 mbgl (noted at VRCE, Nagpur) to 39.70 mbgl (noted at Panchgaon- PZ). Pre-monsoon water level depths across the district and within the NMA have been depicted in Figure 8-1. The studies show the shallow water levels within 10 mbgl in almost entire district and the shallowest water levels are observed near Nagpur city and area near Mauda. Water levels in the range of 10-20 mbgl are observed in the western and north western part of district in parts of Narkhed, Saoner and Katol Tehsil and isolated patches in Parshioni, Bhiwapur and Nagpur Rural Tehsil.
Figure 8-1 : Depth of ground water level (May 2007)
Source: Ground Water Information Nagpur District Maharashtra, Central Region Nagpur 2009
o Post-monsoon (Nov, 2007)
The depth to water levels in the district in November 2007 has been observed between 0.65 mbgl (noted at Waddhamna) and 28.65 mbgl (noted at Panchgaon-PZ). The spatial variation in post-monsoon depth to water levels is shown in Figure 8-2. In the entire district the water levels are shallow within 10 mbgl. The water levels of 2 to 5 mbgl is the most dominant range occupying major parts of Ramtek, Mauda, Kuhi and Bhiwapur Tehsils. Water levels of less than 2 mbgl are observed in isolated patches near Nagpur City and in parts of Mauda Tehsil. The northern peripheral part of the district from Narkhed to Ramtek Tehsil and two big patches in the middle portion covering parts of Katol, Hingana, Umred and Nagpur Rural Tehsils have deeper water level of more than 5 mbgl.
8-4
Figure 8-2 : Depth of water level (Nov 2007)
Source: Ground Water Information Nagpur District Maharashtra, Central Region Nagpur 2009
o Seasonal Water Level Fluctuation – (May to Nov 2007)
Rise in water levels has been observed in the entire Nagpur district and in major part of the district it has raised from 0.25 m (recorded at VRCE, Nagpur) to 11.05 m (recorded at Panchgaon - PZ). The rise in water level is mostly within 7.5 m. Major parts of the district covering entire Ramtek, Parshioni, Mauda, Umred, Hingna and Nagpur (Rural) show higher fluctuation of 4 m to 7.5 m. The western part comprising of Katol, Narkhed, Saoner and Kalmeshwar tehsil and Bhiwapur tehsil in the east have lower fluctuation of less than 4 m.
Ground Water Reserves in the NMA
The CGWB and GSDA have jointly estimated the ground water reserves of Nagpur district. Ground water reserves by tehsils and its use for different purposes have been presented in Table 8-2. The total annual ground water recharge in the district is about 1,102.27 mcm with the natural discharge of 60.38 mcm making 1,041.89 mcm water available for the annual extraction and for different purposes.
8-5
Table 8-2Ground water resources in the NMA by tehsil
Tehsil
Area Type
Net annual ground water availability (ha.m/yr.)
Annual Ground Water Draft (ha.m/yr.)*
Allocation for domestic and industrial requirement for next 25 years (ha.m/yr.)
Groundwater availability for future irrigation (ha.m/yr.)
Stage of Ground water development (%)
Category
Irrigation
Domestic and Industrial Uses
Total
Parshioni
Command
6822.35
638.09
218.53
856.62
437.06
5747.20
12.56
Safe
Non-command
1362.09
340.97
73.50
414.47
146.99
874.13
30.43
Total
8184.45
979.06
292.03
1271.09
584.05
6621.33
15.53
Hingna
Command
696.32
211.15
34.23
245.38
68.45
416.71
35.24
Safe
Non-command
7525.66
1857.59
401.93
2259.51
763.48
4904.59
30.02
Total
8221.98
2068.74
436.15
2504.89
831.93
5321.30
30.47
Nagpur (Rural)
Command
198.71
32.39
9.97
42.36
19.94
146.37
21.32
Safe
Non-command
6638.73
2427.29
369.17
2796.46
738.34
3473.09
42.12
Total
6837.44
2459.68
379.14
2838.83
758.28
Chapter 8Utilities and Services
This chapter discusses the existing utilities infrastructure provisions such as water supply, power, sewerage, drainage, telecom and gas in the NMA. The collated data is based on the available information from published reports, studies and interactions with various government agencies supported by observations during site visits. As discussed earlier in this report, the major urban areas such as the NMC, Kamptee and Kalmeshwar Municipal Councils and MIDC areas are outside the NMA extents. The areas within NMA are either developing rural areas or growing urban areas on the fringes of NMC and Municipal councils, which currently are not being serviced with utilities.
Much of the available information pertaining to utilities infrastructure is limited to the NMC and municipal council limits. The Nagpur District Regional Plan 1991-2011 broadly addresses the issue of infrastructure development in the new urban areas and rural areas within the metropolitan area.
This chapter covers a summary of key findings for various utility components in the NMC and municipal councils, supported by available information pertaining to growing urban and rural areas. Although the corporation and council areas are outside NMA boundaries, study of infrastructure provisions for these urban areas helps provide some background to that in the NMA.
8.1.2Surface Water Sources
The total surface water runoff from the geographical area of Nagpur district is estimated to be about 4039 mcm, out of which about 984 mcm can be utilised for irrigation as well as other purposes. The catchments have only two perennial rivers that is Kanhan and Pench which confluence near village Bina. After this confluence, the Pench River merges into the Kanhan River, which is a tributary of the River Wainganga. There are some seasonal rivers like Kolar and Nag which are tributaries of the Kanhan River and contribute to Kanhan during monsoon. Vena is another main seasonal river which is tributary of the Wardha River. These rivers have been intercepted by constructing dams and runoff water from the catchments is stored and is used for irrigation as well as domestic and other purposes.
Nave Gaon Kheri and Totla dam projects are the two major projects in the region on the Pench River. The Right Bank canal of Pench project on Pench River which originates from Totla dam is the main source of water supply for the NMC and NMA.
Kochi Barrage and Rehari barrage are two major projects in the region that are proposed on Kanhan River as shown in the Figure 8-3. The Rehari barrage is located near village Rehari at downstream of confluence point of Pench and Kanhan rivers. This was being considered as a potential source for Nagpur City, however the project was not undertaken by the NMC subsequently.
There are some smaller projects constructed on the seasonal rivers to store the run off to be used for irrigation purposes and for smaller developments. The Lower Vena project has been constructed on Vena River located near village Bela and Butibori. It has been designed to provide water for irrigation as well as drinking purposes in its command area. Existing and proposed potential surface water sources and tentative allocations of water from them are described in Table 8-3 and Table 8-4.
8-8
Table 8-3Potential surface water sources (existing) for the NMA
S No
Name of Scheme
Available Water (Total Live Storage)
Allocation of water for
Remarks
Drinking/Non Irrigation Uses
Industrial Uses
Irrigation Uses
mcm
3619.46
41.52
Mauda
Command
13711.98
1412.33
365.84
1778.17
731.67
11567.98
12.97
Safe
Non-command
373.80
88.68
43.93
132.61
87.86
197.26
35.48
Total
14085.78
1501.01
409.76
1910.78
819.53
11765.24
13.57
Kamptee
Command
5718.60
1605.01
339.00
1944.01
677.99
3435.60
33.99
Safe
Non-command
705.99
380.12
57.47
437.59
114.94
210.93
61.98
Total
6424.59
1985.13
396.47
2381.60
792.93
3646.53
37.07
Saoner
Command
3160.42
994.03
67.98
1062.01
92.16
2096.63
33.60
Safe
Non-command
3681.17
3467.50
275.84
3743.33
180.25
725.84
101.69
Total
6841.59
4461.52
343.82
4805.34
272.41
2822.47
70.24
Kalmeshwar
Command
334.78
349.73
14.64
364.37
5.48
2.05
108.84
Safe
8-6
Tehsil
Area Type
Net annual ground water availability (ha.m/yr.)
Annual Ground Water Draft (ha.m/yr.)*
Allocation for domestic and industrial requirement for next 25 years (ha.m/yr.)
Groundwater availability for future irrigation (ha.m/yr.)
Stage of Ground water development (%)
Category
Irrigation
Domestic and Industrial Uses
Total
Non-command
6839.21
5014.18
302.17
5316.34
572.95
1276.74
77.73
Total
7173.99
5363.91
316.81
5680.72
578.43
1278.79
79.18
Umred
Command
1252.81
163.79
107.69
271.47
208.58
880.45
21.67
Safe
Non-command
8876.41
1643.17
324.42
1967.59
648.84
6584.40
22.17
Total
10129.23
1806.96
432.10
2239.07
857.42
7464.85
22.10
Kuhi
Command
438.53
123.68
30.13
153.81
60.25
254.60
35.07
Safe
Non-command
7189.16
2189.78
472.05
2661.83
944.10
4055.28
37.03
Total
7627.69
2313.46
502.18
2815.64
1004.35
4309.88
36.91
Total
Command
32334.5
5530.2
1188.01
6718.2
2301.58
24547.59
22.19
Safe
Non-command
43192.22
17409.28
2320.48
19729.7
4197.75
22302.26
54.74
Total
75526.74
22939.47
3508.46
26447.9
6499.33
46849.85
43.47
Source: Ground Water Information Nagpur District Maharashtra, Central Region Nagpur 2009; *hectare metre/year
8-7
mcm
mcm
mcm
1
Pench Project (Nave Gaon Kheri dam and Totla dam, constructed on Pench River) Full Water Levels (FWL): • Totla Dam – 490 m • Navegaon Kheri dam – 325 m Minimum Water Levels (MWL): • Totla Dam – 464 m • Navegaon Kheri dam – 31 4m
1,328.00
168.00
76.00
961.00
Water allocated for NMC from RBC at Mahadula: I. 112 mcm permanent allocation II. 78 mcm after paying to irrigation department about Rs. 100 crore Total allocation from Pench project is 190 mcm against 168 mcm planned non-irrigation water. Further, there would be no surplus water in pench project for future allocation to NMC/NIT. The “Pench Diversion” is another project proposed by the Government of Madhya Pradesh to tap pench river at upstream in the state of Madhya Pradesh to fulfil irrigation and non-irrigation demands of the state from this river in that region. Once the project is implemented, the surplus availability of water in Pench Project would be greatly reduced and only the allocated water from the Pench project would be available for allocated uses.
2
Lower Vena River Project: This project is constructed across the river Vena, a tributary of Wardha river located near
189.18
90.02
-
53.79
Total non-irrigation water allocation from the reservoir is 90.02 mcm and has been budgeted as follows: • Drinking water demand of Hinganghat and Sindhi towns of district Wardh – 7.27 mcm
8-9
S No
Name of Scheme
Available Water(Total Live Storage)
Allocation of water for
Remarks
Drinking/Non Irrigation Uses
Industrial Uses
Irrigation Uses
mcm
mcm
mcm
mcm
village Bella right near Buti Bori and river Nand.FWL:Badgaon – 255 mNand – 247 mMWL:Badgaon – 245.80 mNand – 241 m
MIDC Butibori area (MIDC)- 19.18 mcmDRDO - 0.18 mcmKesalapar – 0.015 mcmBarkhedi Railway – 0.54Ruch Soya Industries, Butibori – 0.21 mcmPurti power sugar factory – 1.31 mcmMIHAN - 26. 16 mcmIdeal Energy Power Centre-1 – 7.80 mcmVidarbha Industries – 12.35 mcmIdeal Energy Power Centre-2 – 10.00 mcmAparna Infra Energy – 5.00 mcmTotal budgeted water is 90.02 mcm. There is no additional water available for NMC/NIT.Source:Office of the superintending Engineer and secretary (Maharashtra-Madhya Pradesh interstate control board for Joint Hydel and Irrigation Projects) and the irrigation department
3
Kanholi Project:This project has been developed on the river Krishna.FWL: 314.24mMWL: 301.600m
22.213
-
-
20.485
No allocation for drinking and other non-irrigation uses.
8-10
S No
Name of Scheme
Available Water (Total Live Storage)
Allocation of water for
Remarks
Drinking/Non Irrigation Uses
Industrial Uses
Irrigation Uses
mcm
mcm
mcm
mcm
4
Upper Vena River project: This project is constructed on upstream of Vena river in Hingana TahsilFWL: 337.415mMWL: 330.405m
21.64
11.55
7.59
2.50
Out of 11.55 mcm, 9.9 mcm is allocated for MJP for rural and suburb water supply. There is no surplus water for future allocation. Also, many times the reservoir does not fill completely to provide the designed allocation of water.
5
Wakeshwar DamFWL: 275.69 mMWL: 271.29 m
2.07
2.07
-
-
0.2 mcm allocated for Sahara city and demand is 0.5 mcm. The balance water can be used for NMA
6
Kanhan intake works (at Kamptee)
Pumping
65.71 mcm (180 mld) allocated for NMC area and 4.38 mcm (12 mld) allocated for Kamptee municipal council.
7
Vishvasariya Barrage
100.00 (assumed)
100.00 (assumed)
-
-
The barrage has been abandoned, however if the river changes its course, the project can be revived as it has good water potential and can be considered as an important and sustainable source of water for future development
Source: Book of Progress and Current Status of Irrigation Projects in Nagpur District: Jal Sampada Department
8-11
This page is intentionally left blank.
8-12
Table 8-4Potential surface water sources (proposed) for the NMA
S No
Name of Scheme
Available Water
Allocation of Water for
Remarks
Drinking uses
Industrial uses
Irrigation uses
mcm
mcm
mcm
mcm
1
Kochi BarrageThe project has been proposed at Kanhan River near Kochi village in M.P.Maximum Water Level(MWL)318.00 mMaximum Draw Down Level (MDDL) - 311.00 m
75.07
5.39 (for rural water supply)
15.0 to MACB
48.48
The project has been approved and is under construction. There is no further scope to increase the size of the project and storage of water for further allocation.
2
Rehari BarrageA proposed scheme near Rahari village on Kanhan river in tehsil Mauda.The catchment area of the project is 11,753 km² Gross annual yield is 90% dependable - 3,172.41 mcmNet annual yield 90% dependable - 564.32 mcmGross storage at the barrage site - 65.86 mcmLive storage at the barrage site - 65.69 mcmMWL - 271mFull Resevoir level (FRL) - 270mReservoir bed level (RBL) - 251.1mCrest Level - 256m
128
128
-
-
175mld water is proposed for the NMC area as per 2011 demand and about 350mld water for the future demand in 2031. This scheme has been approved for implementation and was abandoned due to the shortage of funds.The project has a very good potential for tapping the flood water from the upstream catchments as well as perennial water flowing through the river and use it to cater to the water demands of the NMC and NMA areasThis project can be seen as a long term sustainable source for the region. The project, however, seems to be high in operational cost as the barrage is quite downstream of the region and the NMC.The operational cost of the scheme can be brought down by having an interdepartmental understanding with the irrigation department and the NMC/NIT. NMC/NIT may provide water from the barrage to irrigation department for irrigation purpose to the Downstream command area and in return receive water from irrigation department from the right bank canal from Pench project at higher elevation and transport it to the desired location of treatment by gravity.
3
Lakhma pur Irrigation project on local nallah
6.783
0.5
2.7
3.583
0.5 mcm water for Butibori water supply and 2.7 mcm water for MIDC area
4
Bhiv Kund SchemeConstructed on Local nallahFWL: 113.80 mMWL: 101.25 m
2.853
-
-
2.853
There is no surplus water at this source for future allocation
5
Salai (Mokasa)Minor Irrigation project, constructed on tributaries of Kanhan river
2.143
-
-
2.143
There is no surplus water at this source for future allocation
6
Makardhokara project:FWL: 298.10mMWL: 291.50m
18.921
5.685
-
8.506
There is no surplus water at this source for future allocation
7
Akoli Barrage planned at Nag River
50 (assumed)
50 (assumed)
-
-
Nag river is contaminated due to the disposal of untreated sewage from the Nagpur town. This water can be tapped by constructing barrage at Akoli and treated up to the irrigation standards. The treated water can be used for the irrigation purposes in the command area of pench project and fresh water can be allocated for the drinking purpose from the pench project at higher elevations. Nag water can itself be treated up to the drinking standards by providing a proper treatment plant and supplied for domestic purposes.
8-13
S No
Name of Scheme
Available Water
Allocation of Water for
Remarks
Drinking uses
Industrial uses
Irrigation uses
mcm
mcm
mcm
mcm
Preliminary study and survey work is in progress.
8
Savangi Project:FWL - 319.25mMWL - 311.50m
4.976
1.171
-
Water is yet to be allocated.
9
Nirgandi project to tap surplus water from Lower Vena during monsoon.Total proposed storage- 13.16 mcmTotal proposed utilisation-23.15 mcm
-
-
-
-
For irrigation use and rural water supply.
10
Vena Feeder: Mordham Nala is to be diverted to feed Upper Vena reservoir to contribute about 6 mcm water.
-
-
-
-
Currently the Vena reservoir is not filling up to its full capacity if rain fall in the region is less. Allocated water from the Vena project is not available to fulfil the desired demand in its command area.
11
Jamghat Project:The project has been proposed on Kanhan River in MP at Jamghat. The project has been formulated and the master plan has been prepared.Total water availability at the Jamghat HEP project would be 14.25 TMC (Thousand Million Cubic Metre) out of which:- 4.25 TMC (150 mcm) will be utilised by MP from Saledhana Reservoir/barrage; and- 10.00 TMC (353 mcm) will be provided to Maharashtra through canal.
This 353 mcm (970 mld) water would be available at high altitude and could be transported to Upper Vena reservoir by gravity for further storage and utilisation at the downstream. This project if commissioned may prove as a boon for the NMA and could fulfil more than half of the entire NMA demand including the NMC area.
Source: Book of Progress and Current Status of Irrigation Projects in Nagpur District: Jal Sampada Department
8-14
Figure 8-3 : Location of potential existing and proposed schemes for surface water sources
Data Source: Book of Progress and current status of Irrigation projects in Nagpur District: Jal Sampada Department; Map prepared by Halcrow.