24.2.3.1 Review of DTP Scheme
DTP Scheme for Kaloor Area was sanctioned as per G.O (MS)106/71/LAD dt. 21/07/1971. The area covered by the scheme consists of 45. 92Ha of land situated on either side of N. H. 47 leading to Ernakulam from Alwaye and east of the north over bridge at Ernakulum.
The development of the area is envisaged as an extension of the business and commercial complex to accommodate the fast growing commercial activities in the city. The main concept of the shopping Centre is designed with pedestrian promenades, entertainment centers, covered footpaths and connecting links. It is proposed to acquire land to accommodate the shopping centre and for providing wholesale trading and warehousing facilities. New road proposals, an over bridge for the Alwaye – Ernakulum road over the canal in this area, widening of existing canal to 60 ft, park etc are the major proposals in the scheme. It is expected to be a remunerative scheme.
Few of the major roads have been formed whilst several internal roads have been developed which serves the purpose of the proposed roads in the scheme area and an over bridge has constructed over the canal in the Aluva – Ernakulam road(old NH 47). A park has came into existence at a different location than envisaged in the DTP scheme. Industrial development doesn’t happen as envisaged in the DTP Scheme. Commercial and residential activities started in the area proposed for canal widening. The scheme area has developed as a commercial centre. The major goal of the scheme to expand the business and commercial complex to support the city's rapidly expanding commercial activities has fulfilled. But area designated for acquiring roadways has been crossed by residential, commercial, vacant, industrial and mixed uses.
Kochi Metro rail is passing through this scheme area(old NH 47). In this master plan, major portion of the scheme area is zoned as Transit Oriented Development (TOD) zone. Recreation facilities also marked in this area. High density development is envisaged in TOD zone. Aluva – Ernakulam road (old NH 47) is proposed to widen to 27.0m and portion of Kaloor-Kadavanthra road & Perandoor road is proposed to widen to 21.0 & 18.0m. resp.
Other land uses than scheme envisaged come up in the area earmarked for area to be acquired for roads and several internal roads have been developed which serves the purpose of the proposed roads in the scheme area. Some of the other land uses also changed and the main objective of the scheme to develop the scheme area as a commercial centre has been fulfilled. Hence the DTP scheme for Kaloor Area can be revoked. The scheme is very old and it is very necessary to make it updated
Kochi Municipal Corporation
24.2.3.2 Scheme Revocation
The DTP Scheme for Kaloor Area shall stand revoked as provided under 2nd proviso to section 50(1) of the KT & CP Act, 2016; once the Master Plan is sanctioned under section 36(8) of the KT CPAct, 2016.