24.2.2.1 Review of DTP Scheme
DTP Scheme for M.G. Road Part II was sanctioned as per G.O (MS) 289/69/DD dt. 13/10/1969 vide section 12 of the Town Planning Act, 1108. The scheme covers the land abutting M.G. road from Durbar Hall road (Jose Jn) to Cochin Shipyard to a depth of 120’ on either side of the road. The main proposals in the scheme area are Road Widening at Jos Jn., Road Widening at Pallimukku Jn. and a new road alignment at Ravipuram Jn.
The scheme was envisaged for the commercial development on either side of M.G.road to a depth of 120’ and stopping uneconomical use of land abutting the road. In addition to Commercial development, residential development and public and semi public (hospital, educational institution, state govt. offices) developments also happened in the proposed Commercial zone. The new road alignment proposed at Ravipuram Jn. does not come into existence and the road at Pallimukku junction has widened as per the DTP scheme and continued the widening as part of Sahodaran Ayyappan road. Widening of Jose jn has happened to some extent. Actual alignment of MG road near Cochin Shipyard area has deviated from the alignment proposed in the DTP scheme.
Kochi Metro rail is passing through this scheme area. In this master plan, major portion of the scheme area is zoned as Transit Oriented Development (TOD) zone. Rest is zoned as residential and commercial zone. High density development is envisaged in TOD zone and MG road is proposed to widen to 24.0m. A small portion of Sahodaran Ayyappan road is passes through this scheme area and 21.0m widening is proposed for this road in this plan.
Eventhough the scheme envisage commercial development, mixed use developments happened in the scheme area. MG road itself has come into existence by deviating the alignment from the approved DTP scheme. Other new road proposals envisaged in the sanctioned DTP scheme doesn’t came into existence. Hence DTP Scheme for MG Road Part II can be revoked. This scheme is very old and it is necessary to update with current scenario and section 50(1) of Kerala Town & Country Planning Act permits the same.
24.2.2.2 Scheme Revocation
The DTP Scheme for M G Road Part II shall stand revoked as provided under 2nd proviso of section 50(1) of the KT & CP Act, 2016; once the Master Plan is sanctioned under section 36(8) of the KT & CP Act, 2016.
Kochi Municipal Corporation
