11.1 The provisions of Part 1/Sec 21 of this code shall apply.
11.2 Energy Management System
For heavy industries as defined in Table 1 in addition to provision of (Part 1/Sec 20) and energy conservation code, an energy management system monitoring and recording power consumption, but also all relevant electrical parameters in all critical part of the electrical installation should be considered. Such energy management system should provide the following function:
a) Produce energy efficiency reporting;
b) Understand energy usage and find energy waste;
c) Remote report the status and remote control of the electrical installation;
d) Alarm in case of event in the electrical installation, such as overload, short-circuit, power interruption; and
e) Capture, analyze and understand power quality disturbances.
11.3 Power Factor Compensation
The provisions of (Part 1/Sec 20) of the Code shall apply. For specific guidance for installations covered by this Part (see Annex F).
11.4 Harmonics Monitoring and Filtering
Where electronic converters/nonlinear loads, such as variable speed drive, rectifiers, switch mode power supply or similar are a significant part of the total load (>25 percent) measurement of harmonics current and voltage at incomer is recommended.
Wherever necessary to control the harmonics within permissible limits, passive/active filters may be used.