India is on the path of sustainable development and its infrastructure sector has grown progressively. The buildings and services so constructed depend on power for their construction and effective utilization. Building and Industry sectors are fastest growing segments of economy in past decade and are expected to remain so for running decade. It would also see adoption of various technological innovation both for quality of life and sustainable economic growth. In fact, power is one of the prime movers of development and electricity is the predominant form of energy being used on account of ease of generation/conversion, transmission, distribution, and utilization.
Specific statutory provisions to be adhered to in the supply and use of electricity had been laid down by the erstwhile Indian Electricity Act, 1910 and the Indian Electricity Rules, 1956 framed, thereunder. After the enactment of The Electricity Act, 2003, repealing the previous Indian Electricity Act of 1910, the Indian Electricity Rules of 1956 were replaced by regulations in 2010. A need was felt to elaborate upon these regulations since the agencies involved have varied practices, in view of their diverse interests, and different accessibility levels to technological developments. Earlier, in order to rationalize these practices, India’s first National Electrical Code, formulated in 1985, was a compendium of several well-established codes of practice which provided assistance on economic selection, installation and maintenance of electrical equipment employed in the usage of electrical energy. This edition was revised in 2011, to include special aspects like solar PV power supply systems. The code complemented and elaborated on the statutory provisions, for the ease of application by the system engineers, by recommending the best practices for electrical installations in a consolidated form in order to provide for unified practices and procedures along with consideration for safety and economic usage of energy in the design, execution, inspection and maintenance of electrical installations of various locations.
During the formulation of the National Electrical Code in 1985 and its subsequent revision in 2011, it was realized that the various referred codes on wiring practice, earthing, lightning protection etc., were revised and updated in line with the practices and technology available at that time. Over the years, there have been more updates in the technology and new practices are being followed. Also, there have been tremendous socio-economic changes, leading to change in the pattern of the usage of electricity. With technological advances and India’s focus on renewable energy, an urgent need was felt to revise the NEC at the earliest to maintain its relevance in the present context.
The task for revision of NEC of India was taken up by the Electrical Installations Sectional Committee, ETD 20 considering the above factors. This revision follows the earlier structure of NEC, with modifications and additions being incorporated in line with IEC 60364 series of standards on ‘Low-Voltage Electrical Installations’ as well as the changes and developments that took place since the publication of NEC 2011. It is visualized that in future, further harmonization with international codes may be take place.
It is obligatory that the Electrical installation shall be carried out in accordance with the Central Electricity Authority (Measures related to Safety and Electric Supply) Regulations 2010 (amended in 2015, 2018, 2019) and relevant regulations as amended or brought into force from time to time. It may be noted that Regulation 12 specifies to follow National Electrical Code for electrical installations. Further, it also states that all material, accessories, appliances etc., used in an electrical installation shall conform to Indian Standards or International Electrotechnical Standards (IEC) wherever they exist. Section 146 of Electricity Act states any contravention with the provisions of the Act or rules, regulations made thereunder is punishable. Under the various sections, reference of related regulations are given, which will prove helpful in interpretation. In the event of any inconsistency between CEA regulations and National Electrical Code, the provisions of CEA regulations shall prevail.
In this version, attention is drawn towards good workmanship and proper coordination and collaboration between the architect, civil work counterpart, agencies involved in the installation work of other building services and the agency executing the job of electrical installation, from the planning stage itself. The design of electrical installation is required to take into account the characteristics of available supply, nature of demand, environmental conditions, type of wiring and methods of installations, protective equipment, emergency control, disconnecting devices, prevention of mutual influence between electrical and non-electrical installations, accessibility and also, the user considering his ergonomic requirements (well informed or ignorant) etc.
The Code is divided into eight parts, which are further divided into multiple sections. Part 1 covers the General and common aspects, which applies to all types of electrical installations. Wiring installations are an important aspect of any electrical installation. The revision of Part 1 is being carried out to align with international practices and the latest provisions of IS 732 which is the relevant code of practice for wiring installations. The sections related to Power quality, earthing and lightning protection have been modified to align with the provisions of their respective codes. In view of increased concerns on safety aspects, sections on protection for safety such
INTRODUCTION
i
as protection against electric shock, protection against thermal effect and protection against fire due to arcing, protection against overcurrent and fault current, and protection against voltage disturbance and measures against electromagnetic influences have also been included.
Part 2 of the code covers the requirements related to standby or emergency generating stations and captive substations intended for serving an individual occupancy and/or intended to serve a building or a group of buildings, normally, housed in and around it. It provides guidance on layout and building construction aspects, selection of equipment, transformer installations, switching stations, station auxiliaries, testing and commissioning. It excludes the requirements under the purview of utilities, namely, the large generating stations, distribution substations and associated transmission system, or captive generator sets of large capacity. Reference to Central Pollution Control Board (CPCB) guidelines and Petroleum and Safety Explosives Guidelines have also been included.
Part 3 defines requirements for special installations or locations and includes specific sections on locations containing a bath or shower, swimming pools and fountains, rooms and cabins containing sauna heaters, construction and demolition site installations, conducting location with restricted movement, caravan parks camps and similar locations, marinas and similar locations, exhibitions, shows and stands, furniture, ELV lighting installations, community facilities and work places, installations in caravans and motor caravans, supplies for electric vehicles, operating or maintenance gangways, temporary electrical installations for structures, amusement devices and booths at amusement parks and circuses, heating cables and embedded heating systems, and office buildings, shopping and commercial centers and institutions. Optimum benefits from the use of electricity can be obtained only if the installation is of sufficient capacity and has enough flexibility. Safety, economy, efficiency, reliability, convenience as well as provision for future expansion are major considerations in planning the electrical layout. Guidelines are provided based on general characteristics of installations, supply characteristics and parameters. Switchgear for control and protection, service lines, metering, earthing, building services, fire protection and miscellaneous provisions have been covered. Miscellaneous provisions include telephone wiring, call bell system, clock system, group control, audio visual systems, closed circuit TV where applicable, emergency lights for critical areas of the dwelling. Provision for increased number of power supply points for residential units to accommodate the increasing number of gadgets along with provision to avoid overloading of supply points by consumer through reference to miniature circuit breakers and fuses under requirement of switchgear for control and protection has been made. New sections have been added considering growing extent of utilization and safety concerns.
Electrical networks in industrial buildings serve the purpose of distributing the required power to the consuming points where it is used for a multitude of purposes in the industry. The design of electrical installation in industrial premises is, therefore, more complicated than those in non-industrial buildings and is covered under Part 4 of the code. Industrial installation shall take care of load requirements and supply limitations in a simple and economic manner, ensuring protection to human life and loss of property by fire. The network layout shall also facilitate easy maintenance and fault localization. A particular feature of electrical installations in industrial buildings is the reliability of supply to essential operations for which standby and emergency supply sources/networks are available. The needs of such systems depends on the type and nature of the industrial works.
Locations in industrial buildings which are hazardous in nature, require special attention with respect to design of electrical installations, therein. In order to help identify the specific nature of each industry and the probable hazardous locations, industrial installations are classified for assisting the design engineer in the choice of equipment and methods.
Outdoor electrical installations are designed and erected for short term use ranging from a few hours to few months. In some cases, they can also be used for long periods of time. Such installations are, generally, unprotected from environmental hazards as compared to installations in buildings. Outdoor installations are, hence, classified into public lighting installations, temporary outdoor installations and permanent outdoor installations to address specific concerns in an optimal way. Major risks power in such installations arise from short circuits, resulting in fire accidents, and exposure to live wires, resulting in shock. Outdoor installations are required to comply not only with the general requirements, but also additional requirements regarding supply intake arrangements, control of circuits, earthing, and protection against overload, short circuit and earth leakage. Part 5 of the code covers the aspects for outdoor installations.
With the increasing mechanization for enhancing the farm output of the country, there is increased use of electricity for essential purposes in agriculture and Part 6 of the code covers the electrical installations requirements associated with the agricultural sector. Installations in agricultural premises are different outdoor installations as the external influences completely different. The overall power requirements for such installations may be small, the presence of livestock and other extraneous factors necessitate laying down specific requirements to ensure safety. Specific
ii
requirements of electrical installations in agricultural premises which include premises where livestock are present and farm produce are handled or stored are covered. Agricultural processing at the farm premises are also covered.
In areas where hazardous atmosphere during normal operations are likely to occur, special emphasis from the view of design of electrical installations shall be laid. Liquids, gases and vapours and dust generated, processed, handled and stored by industry are combustible. On ignition, these may burn readily and with considerable explosive force when mixed with air in the appropriate proportions. With regard to electrical installations, such ignition sources include arcs, sparks or hot surfaces produced either in normal operation or under specified fault conditions. NEC provides guidelines for electrical installations and equipment in locations where hazardous atmosphere is likely to be present with a view to maximize electrical safety. When electrical equipment is to be installed in or near a hazardous area, effort shall be made to locate the equipment in less hazardous or non-hazardous areas and thereby, reducing the effort for additional requirements. Ventilation or use of protective gas also reduces the probability of the presence of explosive gas atmosphere so that areas of greater hazard can be transformed to areas of lesser hazard or to non-hazardous areas. Regulatory requirements are to be adhered to for such installations. Part 7 of NEC covers the special requirements for electrical installations in hazardous area.
Excessive reliance on fossil fuel resources to meet the energy requirement of the country is considered unsustainable in the long-run and has an adverse impact on the environment and ecology. This has resulted in the quest of renewable sources of energy as a viable option to achieve the goal of sustainable development. India has been committed to increase share of energy from renewable sources and has been making calculated efforts in this direction.
We are aiming for 24 x 7 power for all, with 450 GW of renewable power generation capacity by 2030 (further, extended to 500 GW non-fossil based capacity by 2030). Many of the government’s major initiatives, such as Make in India (MII) initiative or Aatma Nirbhar Bharat Abhiyan (ANBA: Self-reliant India), require access to reasonably priced, high quality and reliable power to take off. Social conditions, also, demands for adequate and quality supply of electricity.
In case of Variable Renewable Energy (VRE) generation, there will be likely instances of generation being more than the demand during certain periods of the day and seasons. Thus, such avenues are to be explored which could absorb the excess power generated successfully and thereby, rendering the system operation stable and economical.
Harnessing of solar energy is one such area which is expected to supplement energy supply efforts. Part 8 on solar photovoltaic installations provides guidelines on general safety procedures and practices in solar PV installations, general characteristics of solar PV components and installations, requirements and recommendations in wiring and earthing of PV installations on buildings or industrial structures and requirements and recommendations in electrical safety protection of solar PV systems.
The Code excludes guidance on tariff. After revision of NEC, there will be instances of revisions of individual referred codes with time. It is, therefore, recommended to follow the provisions of the latest standards/codes of practice. In order to avoid such instances where the Indian Standards and provisions of this code may differ, attention is drawn to the relevant standard. In order to keep pace with such changes and to incorporate the additional knowledge that will be gained through the implementation of the Code, a continuous review is envisaged. Thus, the users of this Code are encouraged to bring to the notice of Bureau of Indian Standards, need of modifications that may be required in the light of changing technology or other factors, as this is a continuous process.
iii
The National Electrical Code of India (hereafter, referred to as the Code) contains guidelines, for adoption by various concerned stakeholders. Its provisions are expected to serve as a model for adoption in the interest of safety and economy and with the intent to keep our electrical installation practices at par with the best practices in the world.
INTRODUCTION