2.3.1 Door Closing Time ( tc ) — Time period measured from the instant that car doors start to close until the doors are locked.
2.3.2 Door Opening Time ( t₀ ) — Time period measured from the instant that car doors start to open until they are open 800 mm.
2.3.3 Door-to-Door Time (T) — Time period measured from the instant that car doors start to close to the instant that the car doors are open 800 mm at the next adjacent floor.
2.3.4 Handling Capacity (HC) — The number of passengers that a lift system can theoretically transport during the up-peak traffic condition with car occupancy of 80 percent of the actual capacity expressed as a percent of the total building population.
2.3.5 Interval (INT)— Time period between successive car arrivals at the main terminal floor with cars loaded to any value.
2.3.6 Nominal Travel Time (NTT) — The nominal travel time is defined as the time it would take to run a distance of the total travel at the rated speed of the lift without taking into account the acceleration and deceleration of the car or the intermediate stops of real runs.
2.3.7 Passenger Arrival Rate — Percentage of a building's population arriving within a 5 min period.
2.3.8 Passenger Average Transfer Time ( tp ) — Average period of time required for a single passenger to enter or leave the lift car.
2.3.9 Passenger Average Waiting Time (AWT) — Average period of time from the instant a passenger registers a landing call or joins a queue, until the responding lift begins to open its doors at the boarding floor. AWT is not the same as INT.
2.3.10 Round Trip Time (RTT) — The average time taken by a single lift to make a trip from the main terminal back to the main terminal, starting from the time the car doors open at the main terminal until the car doors re-open at the main terminal after serving all demand along the way.
2.3.11 Single Floor Flight Time ( tfl ) — Period of time measured from the instant that the car doors are locked until the lift is level at the next adjacent floor.
2.3.12 Single Floor Transit Time ( tv ) — Period of time required to transit two adjacent floors at rated speed.
2.3.13 Sky Lobby — A sky lobby is the main floor for local groups in the upper part of a very tall building.