Based on the proposed structure for the Planning Area, rural catchments situated beyond 5km distance from the boundary of Urban Growth Centres need to be served by the Rural Growth Centres. Considering this, there are 6 pockets of rural catchments beyond 5km distance namely north, north- east, east, south, west and north- west
For these rural catchments, most prominent village has been identified as their Rural Growth Centre if it serves following criteria:
Strategically located village with access by national/ state level highway;
Central location of village within rural catchment;
Presence of some higher order amenities;
Population higher than the region’s average population per village (>2000);
Administrative centre (headquarter of a circle level as per revenue department)
Land requirements
Detailed planning is required for these 8 Rural Growth Centres and land requirements are estimated for the same purpose:
Residential zone;
As Rural Growth Centres would be developed with higher order amenities and mini employment centres for rural areas, they are likely to attract migration from rural areas. Thus, residential zone is worked out by considering 2041 population of the village designated as the centre and additional 10% migrant population of its rural catchment; net population density of 75 pph; and 45% top up for local roads, amenities, and open space.
As residential zone is proposed for all Rural Growth Centres, provision of Gaothan extension shall not be applicable to them.
Amenity Reservations
Key amenities such as a hospital/ secondary health centre, veterinary clinic, playground, community centre (commercial complex) with a bank, administrative office, agro produce market/ sub-market yard, and a bus stand with depot shall be provided.
Facilities such as a solid waste disposal site, fire station as well as a police station shall be provided wherever it does not exist.
Out of total projected rural employment, about 30% would be provided collectively by secondary- non-manufacturing and tertiary sectors.
Zoning for commercial and warehousing activities shall be provided to accommodate projected rural employment for the secondary sector (non-manufacturing activities such as mining, construction materials
production and storage etc.)
• Land catering the health and education sector employment shall be provided in the form of amenity reservation.
Reservation for the energy center (electrical substation with complimentary renewable energy sources such as solar farm/ biogas) is recommended.
38.2Rural Growth Centre: Pabal
Pabal Growth Centre is proposed to serve the north-eastern part of PMR between the Pune- Nashik Road (NH-60) and Pune- Ahmednagar Road (NH-753F). The Growth Centre serves 24 villages under its catchment, falling under Shirur taluka. The main intention for the growth centre is to provide for tertiary level amenities
The total area of the Growth Centre is 3959.82 ha. According to Census 2011, the population of Pabal village was 8224 while the population of its catchment was 58940.
Pabal is located on the north-eastern side of PMR along the SH 117, SH 129 and SH 103 within Shirur taluka. Khed- Ranajangaon GC forms western arm while Chakan GC,Alandi GC and Wagholi GC form the south-western arm of the total catchment area of Pabal Growth Centre.Shikrapur GC forms the southern edge of the catchment. The approximate distance of the Growth Centre from PMC is 40 km. It is situated at the crossroads of SH-117, SH-103, and SH-129. SH-117 connects the Growth Centre to Shikrapur Growth Centre and Khed-Rajgurunagar. Further, SH-103 connects the RGC to Alandi GC. State Highways provides strong regional connectivity to Pabal RGC. VR-22, VR-10, and VR-7 converge at PabalGaothan, creating a radial pattern.
The Growth Centre is located over a larger basin of the Bhima River. Tithewadi Bhandara Dam is built on Vel River which is located 2.5 km away from the Pabal Gaothan. The area is located comparatively on flat terrain, with its terrain gradually sloping towards the south.
Figure 38.1: Physiography
Expressway National Highway State Highway MDR, ODR Village Boundary Water Bodies Hill Top Hill Slope Forest
Chapter 38:Rural Growth Centres
Agriculture use is predominant in the Growth Centre. 41.95 Ha of residential development is observed surrounding the gaothan and along SH-103, SH-117 and SH 129.Residential area merely covers 1% of the total land and supporting landuse such as commercial, PSPs and utilities collectively measures of 0.19 %.Vacant land occupies 1095.31 Ha of area and is observed near forest land and in the central part. Natural features constitute about 16.29 % of the land, with a major proportion of forest land and water bodies .Forest land is mostly in the northeastern and western part.
Public and semi-public zone occupy 4.25 Ha of area, all aligning SH-103. Public facilities such as 11 schools, colleges, electric sub-station and 2 primary health care facilities are present surrounding the gaothan. Special Economic Zone was proposed in the northern part with area 307.2 ha for boosting the economy of the region.
Figure 38.2: Existing Land Use Map
Table 38.1Existing land use Statement
Landuse Category
Area (ha)
Proportion of Total Devel-oped Area (%)
Proportion of Total Area (%)
Residential
41.95
37.16
1.07
Commercial
1.90
1.68
0.05
Industrial
0.33
0.29
0.01
Public- Semi Public
4.25
3.76
0.11
Garden, Playground and Recreation
0.02
0.02
0.00
Public Utility
1.13
1.00
0.03
Transportation
63.13
55.92
1.61
Govt land
0.19
0.17
0.00
Total Developed area
112.90
100.00 2.88
Agriculture
2069.54
52.86
Water bodies
183.87
4.70
Vacant land
1095.31
27.98
Forest
410.57
10.49
Hill top Hill slope
43.08
1.10
Total Undeveloped area
3802.37
97.12
Total area
3915.27
100.00
Proposed role and strategies:
Pabal Growth Centre is proposed to cover the north-eastern rural villages of PMR. As per the delineation criteria, the village is accessed by a state highway SH-103, SH 129 and SH-117, the central location of the village within two urban arms along NH-60 and NH-753F. This village has a population higher than the region’s average population per village ie>2000 ppl, and mainly it forms the administrative center (headquarter of a circle level as per revenue department).
The projected population for 2041 for Pabal village is 9,664 while that of the catchment which includes 24 villages is 75,689. Amenities are proposed based on a projected population of 2031 which 9,267 for the village and 70,689 for the catchment. The following map shows the distribution of the projected 2041 population.
Figure 38.3: Demographic projections and the rural catchment
Chapter 38:Rural Growth Centres
The proposed zoning would guide and determine the optimal and efficient land use for the next 20 years. The proposed zoning plan is an output of existing land use and physical conditions analysis, gaothan expansion boundaries, local knowledge of the place, and deployment of five planning goals and allied physical planning strategies. The proposed zoning area statement is presented in the below table.
Following strategies elaborate the zoning plan for the Growth Centre:
Residential Zone: The total residential zone of 278.6 ha is proposed accommodating 9664 population. Density of this growth center is 75 pph. radial residential expansion of 0.5 km is provided along SH-103 and SH-117 to accommodate future population.
Agriculture Zone: To promote agriculture, maximum area 65.78 % is proposed for agriculture.
Water-body zone: Tithewadi Bhandara Dam edges the south western part of Growth centre, with streams aligning in north-south direction. The tributaries originating from this village meets Vel river in the south. The total area under its blue line is 183.87 ha and that of the entire green belt proposed is 6.6 ha.
Green Belt/ Forest/ Hill top hill slope: The forests and hill top hill slope form the green segments. The area under HTHS and Forest is 43.08 ha and 410.57 ha respectively.
Proposed Amenities: For future development a large portion of government land is used for proposing amenities. The key reservations proposed here are the Rural empowerment centre, Agro market, multipurpose ground which acts as helipad, sports complex, town park and cultural centre. A shopping Centre is also proposed adjoining the Agro market. Health care facilities like hospital and vertinary hospital are proposed too.
Proposed Utilities: Fire Station is proposed closed to SH 103 for better accessibility in case of emergency. There are existing 2 cremation grounds. STP is proposed along SH 129 near Tithewadi Bhandara dam.WTP is proposed over an area of 0.18 ha. SWM site provided over an area of 1.58 ha.
Figure 38.9: Proposed Zoning Map
Table 38.2Proposed Zoning Area Statement
Land use category
Area (ha)
Proportion of Tota oped Area (%)
l Devel- Proportion of Total Area(%)
Residential
278.67
36.36%
7.11%
Gaothan
15.33
2.00%
0.39%
Commercial
4.89
0.64%
0.12%
Industrial
0
0.00%
0.00%
Public semi Public
11.4
1.49%
0.29%
Public Utility
2.38
0.31%
0.06%
Transport
150.33
19.62%
3.84%
SEZ
303.38
39.59%
7.74%
Total Developed Area
766.38
100.00%
19.56%
Agriculture Zone G-1
2493.56
63.63%
Green Belt Zone
6.22
0.16%
Hilltop Hillslope Zone
1.89
0.05%
Recreational
7.81
0.20%
Forest Zone
482.86
12.32%
Water Body
159.89
4.08%
Total Non-Developable Area
3152.23
80.44%
Total
3918.61
100.00%
38.3Rural Growth Centre: Rahu
Rahu Growth Centre is proposed to serve the eastern part of PMR between the Pune- Solapur Road (NH-65) and Talegaon- Shikrapur (NH-548 D). The Growth Centre serves 22 villages under its catchment, falling under Daund taluka. The main intention for the growth centre is to provide for tertiary level amenities
The total area of the Growth Centre is 3267.77 ha. According to Census 2011, the population of Rahu village was 10,220 while the population of its catchment was 61,197.
Rahuis located on the eastern side of PMR along the SH 68 within Daund taluka. Ranajangaon GC is located in the northern part while Yawat GC is located in southern part, Shikrapur GC, form the north -western arm while Loni Kalbhor GC and Wagholi GC form the western arm of the total catchment area of Rahu Growth Centre. Urali Kanchan GC forms the southern- western edge of the catchment.The approximate distance of the Growth Centre from PMC is 40 km. SH-68 provides regional connectivity. Further, SH-68 connects the RGC to Wagholi GC. It is situated at the crossroads of MDR -113,MDR-119, and MDR-38. SH-68 connects the Growth Centre to Wagholi Growth Centre and ends in Nangaon village in Daund Taluka.VR-7and VR-49 converge at Rahu Gaothan, creating a linear pattern.
The Growth Centre is located over a larger basin of the Bhima River. Mula- Mutha river is running on the eastern part of the GC and River Bhima flows in the northern side 5 to 6 km away from Rahu village. The area is located comparatively on flat terrain, with its terrain gradually sloping towards the Mula-Mutha River on south eastern part. The forest is located in north east and south west of Rahu village.
Chapter 38:Rural Growth Centres
Figure 38.5: Physiography
Agriculture use is predominant in the Growth Centre. Rahu settlement was developed on the banks of Mula-Mutha river and has linear development pattern along the SH-68. 31.18 Ha of residential development is observed surrounding the gaothan. Residential area merely covers 1% of the total land and supporting landuse such as commercial, PSPs and utilities collectively measures of 0.34 %.Vacant land occupies 658.245 Ha of area and is observed near north -eastern and north- western part of Rahu village.
Natural features constitute about 13.08 % of the land, with a major proportion of forest land and water bodies.Forest land is mostly in the south – western and along the Mula- Mutha River.
Public and semi-public zone occupy 3.27 Ha of area, all aligning SH-68. Public facilities such as 10 primary schools, 1 health care, burial ground and cremation ground are present surrounding the gaothan
Figure 38.6: Existing Land Use Map
Table 38.3Existing land use Statement
Landuse Category
Area (ha)
Proportion of Total Devel-oped Area (%)
Proportion of Total Area (%)
Residential
31.18
22.23
0.95
Commercial
7.422
5.29
0.23
Industrial
4.92
3.51
0.15
Public- Semi Public
3.27
2.33
0.10
Public Utility
0.47
0.34
0.01
Transportation
35.85
25.56
1.10
Govt land
57.17
40.75
1.75
Total Developed area
140.282
100.00
4.29
Agriculture
2041.719
62.48
Water bodies
126.94
3.88
Vacant land
658.245
20.14
Forest
300.05
9.18
Special Areas
0.52
0.02
Total Undeveloped area
3127.474
95.71
Total area
3267.756
100.00
Chapter 38:Rural Growth Centres
Rahu Growth Centre is proposed to cover the eastern rural villages of PMR. As per the delineation criteria, the village is accessed by a state highway SH 68, the central location of the village within two urban arms along NH-548 D and NH-65. This village has a population higher than the region’s average population per village ie>2000 ppl, and mainly it forms the administrative center (headquarter of a circle level as per revenue department).
The projected population for 2041 for Rahu village is 18,253 while that of the catchment which includes 22 villages is 95,630. Amenities are proposed based on a projected population of 2031 which 15,575 for the village and 85,402 for the catchment. The following map shows the distribution of the projected 2041 population.
Figure 38.7: Demographic projections and the rural catchment
The proposed zoning would guide and determine the optimal and efficient land use for the next 20 years. The proposed zoning plan is an output of existing land use and physical conditions analysis, gaothan expansion boundaries, local knowledge of the place, and deployment of five planning goals and allied physical planning strategies. The proposed zoning area statement is presented in the below table.
Following strategies elaborate the zoning plan for the Growth Centre:
Residential Zone: The total residential zone of 470.24 ha is proposed accommodating 18,253 populations. Density of this growth center is 75 pph. Linear residential expansion of 1.5 km to 2 km is provided along SH-68 and MDR 113 to accommodate future population.
Commercial Zone: APMC market, Rural Empowerment Centre and a market form the three commercial nodes of the Growth Centre. APMC is located along the State Highway where as market is proposed on the opposite end adjacent to the Gaothan. REC together with college is proposed on western edge of residential zone, approximately a kilometre away from SH 68.
Agriculture Zone: Almost 60% of the village is proposed to be under agriculture zone considering the rural nature of the village, thus promoting agricultural activities.
Water-body zone: Mula-Mutha river edges the Growth Centre and several nalas flow to meet the river. A total
of 4% area is observed under water body.
Green Belt/ Forest/ Hill top hill slope: Green belt of 102.32 ha covering the blue line of Mula- Mutha River is proposed. However majority of the blue line falls under the forest zone aligning the river. 16% of the total village area is observed as forest. Majority of the gaothan falls under the blue line of Mula- Mutha River.
Proposed Amenities: Amenities are proposed on private land due to lack of government land. Hospital serving as Trauma Care Centre, cultural centre, college and REC line along a collector road.
• STP and WTP are proposed over an area of 1.8 ha each and SWM site is provided over an area of 1.5 ha.
Figure 38.8: Proposed Zoning Map
Table 38.4Proposed Zoning Area Statement
Land use category
Area (ha)
Proportion of Total De-veloped Area (%)
Proportion of Total Area(%)
Residential Zone
470.24
77.91%
14.39%
Gaothan
13.78
2.28%
0.42%
Commercial Zone
6.32
1.05%
0.19%
Industrial
0
0.00%
0.00%
Public semi Public
10.11
1.67%
0.31%
Public Utility
1.93
0.32%
0.06%
Traffic & Transport Zone
101.21
16.77%
3.10%
Total Developed Area
603.59
100.00%
18.47%
Agriculture Zone G-1
1857.65
56.85%
Green Belt Zone
102.32
3.13%
Chapter 38:Rural Growth Centres
GreenZone G-2
35.14
1.08%
Recreational
9.04
0.28%
Forest Zone
529.47
16.20%
Water Body
130.5
3.99%
Total Non-Developable Area
2664.12
81.53%
Total
3267.71
100.00%
38.4Rural Growth Centre: Nhavara
Nhavara Growth Centre is proposed on (NH-548 D) Talegaon- Shikrapur and SH 118to serve the eastern part of PMR .The Growth Centre serves 16 villages under its catchment, falling under Shirur taluka. The main intention for the growth centre is to provide for tertiary level amenities.
The total area of the Growth Centre is 3456.20 ha. According to Census 2011, the population of Nhavara village was 7,429 while the population of its catchment was 40,194.
Nhavara is located on the eastern side of PMR along the NH - 548 D within Shirur taluka. Ranajangaon GC is located in the northern part while KedgaonGC is located in southern part, Loni Kalbhor GC and Wagholi GC form the north -western arm while and Shikrapur GC form the western arm of the total catchment area of Rahu Growth Centre. Rahu RGC forms the southern- western edge of the catchment.
The approximate distance of the Growth Centre from PMC is 50-55 km. NH 548-D and SH-118 provides regional connectivity. Further, SH-68 connects the RGC to Shikrapur GC. It is situated at the crossroads of NH 548 D, SH 118, MDR -39 and MDR-59.All these roads converge at Nhavara Gaothan, creating a radial pattern.
The Growth Centre is located over a larger basin of the Bhima River. A tributary of Bhima river flows from Nhavara village. Chas Caman left bank canal flows on the north eastern side of RGC. In the vicinity, approximately 4 km away on the south western side lies Alegaon Paga Lake. The area is located comparatively on flat terrain, with its terrain gradually sloping towards the Bhima River. The forest is located in south western part of Nhavara.
Figure 38.9: Physiography
Existing Land Use
Agriculture use is predominant in the Growth Centre. 31.18 Ha of residential development is observed surrounding the gaothan and along SH-118. Vacant land occupies 658.24 Ha of area .Public and semi-public zone occupy 3.27 Ha of area, all aligning SH-118. Public facilities such as schools, and health care facilities, cremation ground are present surrounding the gaothan.
Natural features constitute about about 13.02 % of the land , with a major proportion of forest land and water bodies . Vacant land is observed at southern part of Nhavara. Residential area merely covers 1% of the total land and supporting landuse such as commercial, PSPs and utilities collectively measures of 0.1 %.
Public and semi-public zone occupy 3.27 Ha of area, all aligning SH-118. Public facilities such as schools, government offices, and health care facilities are present surrounding the gaothan.
Table 38.5Existing land use Statement
Landuse Category
Area (ha)
Proportion of Total Devel-oped Area (%)
Proportion of Total Area(%)
Residential
25.87
27.20
0.75
Commercial
5.11
5.37
0.15
Industrial
2.44
2.57
0.07
Public- Semi Public
2.03
2.13
0.06
Garden, Playground and Recreation
0.15
0.16
0.00
Public Utility
0.98
1.03
0.03
Transportation
54.04
56.82
1.56
Chapter 38:Rural Growth Centres
Govt land
4.48
4.71
0.13
Total Developed area
95.1
100.00
2.75
Agriculture
2348.41
67.95
Water bodies
131.58
3.81
Vacant land
817.53
23.65
Forest
63.59
1.84
Hill top Hill slope
0
0.00
Special Areas
0
0.00
Total Undeveloped area
3361.11
97.25
Total area
3456.21
100.00
Figure 38.10: Existing Land Use Map
Proposed role and strategies:
Nhavara Growth Centre is proposed to cover the eastern rural villages of PMR. As per the delineation criteria, the village is accessed by a state highway SH 118, the central location of the village within two urban arms along NH-65 and NH-753F. This village has a population higher than the region’s average population per village ie>2000 ppl, and mainly it forms the administrative center (headquarter of a circle level as per revenue department).
The projected population for 2041 for Nhavara village is 13,128 while that of the catchment which includes 16 villages is 63,140. Amenities are proposed based on a projected population of 2031 which 11,395 for the village and 56158 for the catchment. The following map shows the distribution of the projected 2041 population.
Figure 38.11: Demographic projections and the rural catchment
Proposed Zoning
The proposed zoning would guide and determine the optimal and efficient land use for the next 20 years. The proposed zoning plan is an output of existing land use and physical conditions analysis, gaothan expansion boundaries, local knowledge of the place, and deployment of five planning goals and allied physical planning strategies. The proposed zoning area statement is presented in the below table.
Following strategies elaborate the zoning plan for the Growth Centre:
Residential Zone: A total of 328.17 ha is proposed surrounding the gaothan along NH 548 D and SH-118. The residential zone extends roughly around 500 m from the gaothan in radial manner.
Commercial Zone: The Rural Empowerment Centre and APMC market form the two major commercial nodes of the village, both along NH 548 D
Agriculture Zone: Almost entire village falls under the irrigation command area. Thus Green Zone G2 zone is proposed over 2781.24 ha covering 80% of the total village.
Water-body zone: About 3% of the area fall under the water body zone covering the nalas, major ponds/lakes within the Growth Centre
Green Belt/ Forest/ Hill top hill slope: A 61.55 ha area of land to the south of Gaothan is under forest zone
Proposed Amenities: A cultural centre is proposed adjacent to a small water body north of Gaothan while a college is proposed within a walkable distance from NH 548 D together with sports complex. A Trauma Care Centre serving also serving as general hospital is proposed opposite to APMC market along NH 548 D. A town park is proposed aligning a water body north along SH-118. Fire brigade station is proposed in a clustering rural empowerment centre and veterinary hospital. Three playgrounds are proposed which are equitably distributed within the proposed residential zone.
Proposed Utilities: A WTP is proposed on the south-western side along the existing water body and STP is proposed with an area of 0.14 ha and SWM site is provided over an area of 1.5 ha.
Chapter 38:Rural Growth Centres
Figure 38.12: Proposed Zoning Map
Table 38.6Proposed Zoning Area Statement
Land use category
Area (ha)
Proportion of Total De-veloped Area (%)
Proportion of Total Area(%)
Residential Zone
328.17
70.85%
9.50%
Gaothan
11.99
2.59%
0.35%
Commercial Zone
5.44
1.17%
0.16%
Industrial
0
0.00%
0.00%
Public semi Public
5.86
1.27%
0.17%
Public Utility
1.83
0.40%
0.05%
Traffic & Transport Zone
109.91
23.73%
3.18%
Total Developed Area
463.2
100.00%
13.41%
Agriculture Zone G-1
36.84
1.07%
Green Zone G-2
2781.24
80.50%
Recreational
6.01
0.17%
Forest Zone
61.55
1.78%
Water Body
105.98
3.07%
Total Non-Developable Area
2991.62
86.59%
Total
3454.82
100.00%
38.5Rural Growth Centre: Kikavi
Kikavi Growth Centre is proposed to serve the southern part of PMR. Situated on thePune- Bengaluru Highway (NH-48). The Growth Centre serves 18 villages under its catchment, falling under Bhor taluka. The main intention for the growth centre is to provide for tertiary level amenities
The total area of the Growth Centre is 350.52 (ha). According to Census 2011, the population of Kikavi village was 1859 while the population of its catchment was 22,163.
Kikavi is located on the southern side of PMR along the NH 48 and MDR 102 within Bhor taluka. Nasrapur GC forms the northern arm of the total catchment area of Kikavi Growth Centre.
The approximate distance of the Growth Centre from PMC is 34 km. It is situated at the junction of NH 48 and MDR102; connects the Growth Centre to Nasrapur GC, Khed Shivapur GC and Khadkwasla GC by NH48. MDR 102 converges at Kikavi Gaothan and connects Saswad MC on eastern side and VR 72 passing through Kikavi village boundary.
Nala originated from Northern side villages is running through the growth center and further it meets to River Neera in Kenjal village. The area is located comparatively on flat terrain, with its terrain gradually sloping towards the south. No forest area is in Kikavi Growth center.
Figure 38.13: Physiography
Agriculture use is predominant in the Growth Centre. 6.95 Ha of residential development is observed surrounding the gaothan and along NH48. 8.59 Ha of land used for commercial purpose. Vacant land occupies 52.07 Ha of area. Industrial land occupies 4.03 Ha. Public and semi-public zone is 0.72 Ha and Government land 0.86 Ha. Public facilities such as schools, Police chouki, and health care facilities are present surrounding the gaothan.
Chapter 38:Rural Growth Centres
Table 38.7Existing land use Statement
Landuse Category
Area (ha)
Proportion of To oped Area (%)
tal Devel- Proportion of Total Area (%)
Residential
6.96
19%
2%
Commercial
8.59
23%
2%
Indistrial
4.03
11%
1%
Public and semi public
0.72
2%
0%
Govt land
0.86
2%
0%
Public Utility
0.01
0%
0%
Transportation
15.87
43%
5%
Total Developed Area
37.05
100%
11%
Agriculture
251.02
72%
Water bodies
4.86
1%
Forest
5.52
2%
Vacant
52.07
15%
Total Un-developed Area
313.47
89%
Total Area
350.52
100%
Figure 38.14: Existing Land Use Map
Kikavi Growth Centre is proposed to cover the southern rural villages of PMR. As per the delineation criteria, the village is accessed by a national highway, the location of the village is as it has northern urban arms along NH-48. This village forms the administrative center (headquarter of a circle level as per revenue department).
The projected population for 2041 for Kikavi village is 1859 while that of the catchment which includes 18 villages is 35525. Amenities are proposed based on a projected population of 2031 which 1859 for the village and 32904 for the catchment. The following map shows the distribution of the projected 2041 population.
Figure 38.15: Demographic projections and the rural catchment
Proposed Zoning
The proposed zoning would guide and determine the optimal and efficient land use for the next 20 years. The proposed zoning plan is an output of existing land use and physical conditions analysis, gaothan expansion boundaries, local knowledge of the place, and deployment of five planning goals and allied physical planning strategies. The proposed zoning area statement is presented in the below table.
Following strategies elaborate the zoning plan for the Growth Centre:
• Residential Zone: 9492.92 Ha total residential zone is proposed in village as extension to gaothan and along NH48.
• Industrial Zone: 109.82 Ha total Industrial zone is proposed along NH48.
• Agriculture Zone: Agriculture zone G-1 is proposed over 96.15 Ha land.
• Water-body zone: Area 4.30 Ha is covered under water bodies.
Proposed Amenities:1 health center of area 1.03 Ha along NH 48 and 1 Veterinary hospital of area 0.18 Ha and 1PHC of area 0.05 are proposed along road. 1 Public Housing of area 0.73 ha is proposed near MDR 102.1 Sports complex of 1.51 Ha are proposed near gaothan, 2 playgrounds of area 0.47 Ha and 0.50 Ha. 1 Rural Empower center of area 0.68 Ha is proposed.1 cummunity hall of area 0.04 is proposed under socio cultural amenities. 1 Market of area 0.43 Ha is proposed. Agri produce sub-market of area 1.08 is proposed.1
Chapter 38:Rural Growth Centres
CG of area 0.05 ha is proposed near MDR 102.
Proposed Utilties: 1 WTP, 1 STP and 1ETP of area 0.05 Ha, 0.51 Ha and 0.51 Ha is proposed beside of connecting nala of Nira River. 1SWM site of area 0.51 is proposed near road.
Figure 38.16: Proposed Zoning Map
Table 38.8Proposed Zoning Area Statement
Land use category
Area (ha)
Proportion of Total Devel-oped Area (%)
Proportion of Total Area (%)
Residential
80.77
35.47%
23.04%
Gaothan
4.11
1.81%
1.17%
Commercial
2.15
0.94%
0.61%
Industrial
109.60
48.14%
31.27%
Public semi Public
2.64
1.16%
0.75%
Transport
28.41
12.48%
8.11%
Total Developed Area
227.68
100.00%
64.95%
Agriculture
113.39
32.35%
Recreational
4.66
1.33%
Utility Zone
0.52
0.15%
Water Body
4.27
1.22%
Total Non-Developable Area
122.84
35.05%
Total
350.52
100.00%
38.7Rural Growth Centre: Paud
Paud Growth Centre is proposed to serve the western part of PMR along Pune-Kolad Highway (NH-753F). The Growth Centre serves 29 villagesunder its catchment, falling under Mulshitaluka. The main intention for the growth centre is to provide for tertiary level amenities.
The total area of the Growth Centre is 438.75Ha. According to Census 2011, the population of Paud village was 3730 while the population of its catchment was 24,497
Paud is located on the western side of PMR along the NH 753-F within Mulshitaluka. Hinjewadi GC, Pirangut GC form eastern arm, Talegaon GC forms the northern arm while Sangrun RGC form southern arm of the total catchment area of PaudGrowth Centre.
The approximate distance of the Growth Centre from PMC is 13 km. It is situated along NH 753F, MDR 110 and MDR 26 connects growth centre to Pirangut GC and Malavali GCrespectively.NH 753F provides regional connectivity. Further, NH 753F connect RGC to Pune City.
Figure 38.21: Physiography
The Growth Centre is located over a larger basin of the Mula River. MulaRiverpasses through northern boundary of the village. The area is located comparatively on flat terrain, with its terrain gradually sloping towards the north. The forest area is about 52.61 Ha.
Agriculture use is predominant in the Growth Centre. 21.31 Ha of residential development is observed surrounding the gaothan and along NH-753F. Vacant land occupies 103.75 Ha of area. Public and semi-public zone occupy 3.31 Ha of area, all aligning NH-753F. Public facilities such as schools, government offices, and health care facilities are present surrounding the gaothan.
Chapter 38:Rural Growth Centres
Figure 38.22: Existing Land Use Map
Table 38.11Existing land use Statement
Land use category
Area (ha)
% to Total Devel-oped Area
% to Total Area
Residential
21.31
36.22%
4.86%
Commercial
2.57
4.37%
0.59%
MIXED
0.75
1.27%
0.17%
Industrial
8.99
15.28%
2.05%
Public and semi public
12.88
21.90%
2.94%
Public Utility
0.74
1.25%
0.17%
Transportation
11.60
19.71%
2.64%
Total Developed Area
58.84
100.00%
13.41%
Agriculture
204.59
46.63%
Vacant
103.95
23.69%
Water bodies
19.00
4.33%
Forest
52.41
11.94%
Total Un-developed Area
379.95
86.59%
Total Area
438.79
100.00%
Proposed Zoning
Paud Growth Centre is proposed to cover the western rural villages of PMR. As per the delineation criteria, the village is accessed by national highway, the central location of the village within along urban of NH-753F. This village has a population higher than the region’s average population per village ie>2000 ppl, and mainly it forms the administrative center (headquarter of a circle level as per revenue department).
The projected population for 2041 for Paudvillage is 7001 while that of the catchment which includes 30 villages is 58,689. Amenities are proposed based on a projected population of 2031 which 6,577 for the village and 56,918 for the catchment. The following map shows the distribution of the projected 2041 population.
Figure 38.23: Demographic projections and the rural catchment
The proposed zoning would guide and determine the optimal and efficient land use for the next 20 years. The proposed zoning plan is an output of existing land use and physical conditions analysis, gaothan expansion boundaries, local knowledge of the place, and deployment of five planning goals and allied physical planning strategies. The proposed zoning area statement is presented in the below table.
Following strategies elaborate the zoning plan for the Growth Centre:
Residential Zone: 141.36 Ha residential zone is proposed surrounding gaothan creating an expansion of existing neighbourhood.
• Commercial Zone: Commercial zone of 3.06 Ha includes proposed APMC and Shopping centre and Rural empowerment center.
• Agriculture Zone: Agriculture zone G-1 is proposed over 111.82 ha land.
• Water-body zone: Area 13.96 Ha is covered under water bodies including Mula River.
Green Belt/ Forest/ Hill top hill slope: Green Belt zoning is proposed along Mula River within blueline and riverbank. Forest is 52.61 Ha situated at southern side of the village.
Proposed Amenities: 1 neighbourhood garden and 1 playground of 0.11 Ha and 0.45 Ha is proposed around Gaothan. One sports complex of 1.06 ha has been proposed. Agriculture product market committee as a commercial reservation proposed over 1.03 Ha of government land. 0.46 Ha of shopping centre proposed
Chapter 38:Rural Growth Centres
adjoining to Gaothan along MDR 26. Rural centre and veterinary hospital as rural facilities proposed over 0.57 Ha and 0.2 Ha of land. As per requirement of Department of post, post office of 0.04 Ha is proposed on Amenity Space. 1 Tourist Centre of area 0.98 ha is proposed within Rural Growth Centre.
Proposed Utilties: A sewage treatment plant of 0.50 Ha is proposed away from residential area. One water treatment plant of 0.50 ha is proposed at higher elevation. Solid waste management site is proposed over 0.50 ha of land along MDR 110.
Figure 38.24: Proposed Zoning Map
00.075.15 0.3 0.45 0.6 Km
Table 38.12Proposed Zoning Area Statement
Land use category
Area (ha) P Arreoapo (%rt)ion
of Total Developed Prop Area
ortion of Total(%)
Residential
141.36
62.74%
32.22%
Gaothan
5.61
2.49%
1.28%
Industrial
36.96
16.40%
8.42%
Commercial
3.06
1.36%
0.70%
Public semi Public
4.57
2.03%
1.04%
Public Utility
2.46
1.09%
0.56%
Transport
31.30
13.89%
7.13%
Total Developed Area
225.32
100.00%
51.36%
Agriculture
111.82
25.49%
Forest
52.61
11.99%
Recreational
1.57
0.36%
Green Belt
33.46
7.63%
Water Body
13.96
3.18%
Total Non-Developable Area
213.42
48.64%
Total
438.74
100.00%
38.6Rural Growth Centre: Sangrun
Sangrun Growth Centre is proposed to serve the south-western part of PMR between the Pune-Bangalore National Highway (NH 48) and Pune- KoladRoad (NH-753F). The Growth Centre serves 82 villages under its catchment, falling under Haveli taluka. The main intention for the growth centre is to provide for tertiary level amenities
The total area of the Growth Centre is 597.70 Ha(5.97 sq km). According to Census 2011, the population of Sangrun village was 1245 while the population of its catchment was 34029.
Sangrun is located on the south-western side of PMR along theKhadakwasala dam and situatedon the SH 115 and proposed MSRDC Ring Road within Havelitaluka. Khadakwasala GC, KhedShivapurGC formseastern arm and NasarapurGC form the south-eastern arm of the total catchment area of SangrunGrowth Centre. PirangutGC forms the northern arm of the total catchment.
The approximate distance of the Growth Centre from PMC is 28 km. It is situated on the SH 115 and proposed MSRDC Ring Road connects the Growth Centre to KadakwasalaGrowth Centre and Pirangut Growth Centre. SH-115provides regional connectivity.VR-395 connect gaothan to SH115.
The Growth Centre is located adjacent to north edge of Khadakwasla Dam. Hilly topography is observed in the northern side of the Growth Centre. Afforestation cover is mostly observed along northern and eastern side boundary of Growth centreThe area is located partly on Hilly terrain and partly flatter terrain gradually sloping towards the south.
Figure 38.17: Physiography
Agriculture use is predominant in the Growth Centre. 7.29Ha of residential development is observed surrounding the gaothan and along SH- 115, Vacant land occupies 70.71 Ha and Government land46.63 Ha of area.Public
Chapter 38:Rural Growth Centres
facilities such as schools, post office, health care facilities and community hall are present surrounding the gaothan.
Figure 38.18: Existing Land Use Map
Table 38.9Existing land use Statement
Landuse Category
Area (ha)
Proportion of To oped Area (%)
tal Devel- Proportion of Total Area (%)
Residential
7.29
12%
1%
Commercial
3.23
5%
1%
Public and semi public
0.16
0%
0%
Govt land
46.63
77%
8%
Transportation
3.31
5%
1%
Total Developed Area
60.62
100%
10%
Agriculture
167.41
28%
Water bodies
96.13
16%
Hilltop Hill slope
202.84
34%
Vacant
70.71
12%
Total Un-developed Area
537.08
90%
Total Area
597.71
100%
Sangrun Growth Centre is proposed to cover the south-western rural villages of PMR. As per the delineation criteria, the village is accessed by a state highway and proposed MSRDC ring road, the central location of the village within two urban arms along NH-48 and NH-753F.
The projected population for 2041 for Sangrun village is 1431 while that of the catchment which includes 82 villages is 68289. Amenities are proposed based on a projected population of 2031 which 1369 for the village and 66717 for the catchment. The following map shows the distribution of the projected 2041 population
Figure 38.19: Demographic projections and the rural catchment
The proposed zoning would guide and determine the optimal and efficient land use for the next 20 years. The proposed zoning plan is an output of existing land use and physical conditions analysis, gaothan expansion boundaries, local knowledge of the place, and deployment of five planning goals and allied physical planning strategies. The proposed zoning area statement is presented in the below table.
Following strategies elaborate the zoning plan for the Growth Centre:
Residential Zone: Residential zone of 162.79 Ha is proposed surrounding gaothan and SH 115 creating an expansion of existing neighborhood.
• Commercial Zone: Commercial zone of 1.61 Ha includes proposed Rural empowerment center and Market.
• Agriculture Zone:Agriculture zone G-1 is proposed over 63.23 Ha land.
Water-body zone: Area 95.25 Ha is covered under water i.e. Khadakwasala Dam.
• Green Belt/ Forest/ Hill top hill slope: Hill top Hill slope of area 100.55Ha proposed on
• northernedge and partly eastern side of the growth center.
Proposed Amenities:1garden of area 2.0 Ha,1 playground of area 0.91Ha are proposed along SH115. 1 Secondary school of area 0.72 Ha, 1 Primary health center of area 0.04Ha and community hall of 0.05Ha are proposed within neighborhood. 1 Public housing of area 0.92 is proposed near SH 115. Rural empowerment centerof 1.29 Ha and Market of area 0.31 Ha are proposed as commercial reservation along SH115 & VR 395 respectively.
Chapter 38:Rural Growth Centres
Proposed Utilities: 1 SWM , 1 WTP and 1 STP sites of area 0.52, 1.68 and 0.51 Ha are proposed alog road near water body. Existing crematorium is maintained.
Figure 38.20: Proposed Zoning Map
Table 38.10Proposed Zoning Area Statement
Land use category
Area (ha)
Proportion of Total Devel-oped Area (%)
Proportion of Total Area (%)
Residential
176.80
77.75%
29.58%
Gaothan
4.88
2.15%
0.82%
Commercial
1.61
0.71%
0.27%
Public semi Public
1.82
0.80%
0.30%
Transport
42.28
18.59%
7.07%
Total Developed Area
227.39
100.00%
38.04%
Afforestation
114.96
19.23%
Agriculture
0.36
0.06%
Tourism Development
56.04
9.38%
Hilltop Hillslope
100.57
16.83%
Recreational
3.15
0.53%
Water Body
95.25
15.94%
Total Non-Developable Area
370.32
61.96%
Total
597.71
100.00%
38.8Rural Growth Centre: Kale
Kale Growth Centre is proposed to serve the north-western part of PMR situated at south of the Pune-MumbaiExpressway. The Growth Centre serves 49 villages under its catchment, falling under Mawaltaluka. The main intention for the growth centre is to provide for tertiary level amenities
The total area of the Growth Centre is 402Ha. According to Census 2011, the population of Kale village was 2653 while the population of its catchment was 29351.
Kalegrowth center is located at north-western side of PMR along the MDR 26 and MDR 88 within Mawaltaluka. Malavali GC, Talegaon GC form the northern arm while Hinjewadi GC form the eastern arm of the total catchment area of Kale Growth Centre. PaudRGC and forms the southern edge of the catchment.
The approximate distance of the Growth Centre from PMC is 165 km. It is situated at the crossroads MDR 26 and MDR 88. Pune Mumbai Expressway connects the Growth Centre via MDR 88 toMalavaliGC,Talegaon GC and Hinjewadi GC.MDR 26 connects it to Lonawala via Malavali GC. VR-169, VR-8, and VR-21 are crossing through Kale village.
Figure 38.25: Physiography
Chapter 38:Rural Growth Centres
The Growth Centre is located adjacent to Pawana Lake on the bank of Pawanariver. Approximately 2.5 km river crosses through the village. The area is located comparatively on flat terrain, with its terrain gradually sloping towards the south. There is no forest area and 103.18Ha land is with hilly terrain.
Agriculture use is predominant in the Growth Centre. 10.76 Ha of residential development is observed surrounding the gaothan and along MDR88 and sporadically in overall village. Vacant land occupies 64.30 Ha of area. Public and semi-public zone occupy 0.96 Ha of area, all aligning MDR88, VR 8 and Hills. Public facilities such as schools, government offices, and health care facilities are present surrounding the gaothan.
Figure 38.26: Existing Land Use Map
Table 38.13
38.9Rural Growth Centre: Kadus
Kadus Growth Centre is proposed to serve the northern part of PMR between the Pune- Nashik Road (NH-60) and Pune- Mumbai Road (NH-48). The Growth Centre serves 14 villages under its catchment, falling under Khed taluka. The main intention for the growth centre is to provide for tertiary level amenities
The total area of the Growth Centre is 3689.22Ha. According to Census 2011, the population of Kadus village was 11360 while the population of its catchment was 33728.
Kadus is located at the northern side of PMR and west of the NH60 within Khed taluka. Khed Rajgurunagar GC form the eastern arm while Chakan GC form the south arm and Talegaon GC form the South west arm of the total catchment area of KadusGrowth Centre.
The approximate distance of the Growth Centre from PMC is 53 km. It is connected through MDR18 to SH 103 situated which further connects the Growth Centre to Khed-RajgurunagarGC,Khed-RajgurunagarMC and RanjangaonGrowth Centre and MDR 18 provides connectivity to Chakan GC via MDR72 and MDR17. Further, MDR15, ODR50, VR55, VR46, VR133, VR135, VR137 converge at Kadus Gaothan, creating a radial pattern.
The Growth Centre is located over a bank of Kumandala river which further connects to Bhima River running at north eastern edge of the village and Kadus dam is situated at the western side of the RGC. Right canal of Chas Kaman dam is running at eastern side of gaothan through the Kadus Growth center. The area is located comparatively on flat terrain, with its terrain gradually sloping towards the center. The forest area.160.84Ha
Agriculture use is predominant in the Growth Centre. 48.44 Ha of residential development is observed surrounding the gaothan and along all existing roads running through the Kadus village. Vacant land occupies 547.21 Ha of area. Public and semi-public zone occupy 4.1 Ha of area and government land 203.37 Ha. Public facilities such as schools, Healthcare, civic and infrastructure utility are present surrounding the gaothan.
Chapter 38:Rural Growth Centres
Figure 38.29: Physiography
Figure 38.30: Existing Land Use Map
Existing land use Statement
Land use Category
Area (ha)
Proportion of Total Devel-oped Area (%)
Proportion of Total Area (%)
Residential
10.76
16%
2.7%
Commercial
0.43
1%
0.1%
Public- Semi Public
0.96
1%
0.2%
Public Utility
0.85
1%
0.2%
Transportation
9.35
14%
2.3%
Govt land
43.24
66%
10.8%
Total Developed area
65.61
100%
16.3%
Agriculture
113.30
28.2%
Water bodies
49.74
12.4%
Hill top Hill slope
109.21
27.2%
Vacant land
64.30
16%
Total Undeveloped area
336.56
83.7%
Total area
402.18
100%
Proposed role and strategies:
Kale Growth Centre is proposed to cover the north-western rural villages of PMR. As per the delineation criteria, the village is accessed by a state highway,in this case it is accessed by Pune Mumbai Expressway via MDR88, the central location of the village within two urban arms along NH-48 and NH-753F. This village has a population higher than the region’s average population per village ie>2000 ppl, and mainly it forms the administrative center (headquarter of a circle level as per revenue department).
• Demographic projections:
The projected population for 2041 for Kale village is 3,268 while that of the catchment which includes 49 villages is 87,475. Amenities are proposed based on a projected population of 2031 which 3,063 for the village and 84,350 for the catchment. The following map shows the distribution of the projected 2041 population.
Figure 38.27: Demographic projections and the rural catchment
Proposed Zoning
The proposed zoning would guide and determine the optimal and efficient land use for the next 20 years. The proposed zoning plan is an output of existing land use and physical conditions analysis, gaothan expansion boundaries, local knowledge of the place, and deployment of five planning goals and allied physical planning strategies. The proposed zoning area statement is presented in the below table.
Chapter 38:Rural Growth Centres
Following strategies elaborate the zoning plan for the Growth Centre:
Residential Zone: Proposed residential zoning is proposed centrally over 116.84 Ha land which includes extension to Gaothan and residential zone in RP.
Commercial Zone: Commercial zone includes proposed commercial reservations of Tourist center, Rural Empowerment Center, Media Entertainment Center and Market, over 42 Ha land.
• Agriculture Zone: Agriculture zone G-1 is proposed over 9.89 Ha land adjacent to Pawana Lake.
• Water-body zone: Part of Pawana Lake and Pawana River is spread over 37.16 Ha land.
Green Belt/ Forest/ Hill top hill slope/ Afforestation: No forest land exist in this growth center whereas 4.48 Ha greenbelt along Pawana River; it is zoning is proposed between the riverbank of the Pawan River and its blue line. Hill top hill slope & afforestation zone is proposed at northern side of village about 107.68 Ha
Proposed Amenities: Proposed Amenities: 1 hospital of 0.69Ha is proposed on government land and 1 Veterinary hospital of 0.2 Ha is proposed. 2 community halls of 0.12 Ha and culture center of 0.25 Ha are proposed under socio cultural amenities. 1 Market of 0.33Ha and Rural Empowerment center of 1.05 Ha are proposed within neighborhood. Bio diversity of 21.89Ha, sports complex 2.54Ha and 1 ha play ground is proposed. Tourist Center of 4.60Ha is proposed adjoining to proposed biodiversity park and Media Entertainment center of 43.16 Ha is proposed at scenic setting of Pawana Lake along Pawana River.
Proposed Utilties: Proposed utilities like WTP 0.51 Ha is proposed near northern hill bottom and STP is proposed away from proposed neighborhood 0.53 Ha within greenbelt zone. One fire station of 0.35Ha is proposed adjacent to proposed Media Entertainment center. One SWM site is proposed in Rural Growth Centre.
Figure 38.28: Proposed Zoning Map
Table 38.14Proposed Zoning Area Statement
Land use category
Area (ha)
Proportion of Total Devel-oped Area (%)
Proportion of Total Area (%)
Residential
116.84
59%
29%
Gaothan
3.85
2%
1%
Commercial
42
21%
10%
Public and semi public
8.13
4%
2%
Public Utility
3.90
2%
1%
Traffic & Transportation
23.81
12%
6%
Total Developed Area
198.55
100%
49%
Agriculture (G1)
9.89
2%
Water bodies
37.16
9%
Green Belt
4.48
1%
Hilltop Hillslope
102.66
26%
Recreational
29.75
7%
Afforestation
19.67
5%
Total Non-Developable Area
203.63
51%
Total
402.18
100%
Table 38.15Existing land use Statement
Landuse Category
Area (ha)
Proportion of Total Devel-oped Area (%)
Proportion of Total Area (%)
Residential
48.44
16%
1%
Commercial
0.81
0%
0.02%
Public- Semi Public
4.18
1%
0.11%
Govt land
203.37
68%
6%
Garden, Playground and Recreation
0.08
0%
0.002%
Public Utility
1.63
1%
0.04%
Transportation
38.97
13%
1%
Total Developed area
297.50
100%
8%
Agriculture
1749.28
47%
Water bodies
153.16
4%
Vacant land
547.21
15%
Forest
86.30
2%
Special Area
2.66
0.1%
Hill top Hill slope
853.11
23%
Total Undeveloped area
3391.74
92%
Total area
3689.25
100%
Proposed role and strategies:
Kadus Growth Centre is proposed to cover the north rural villages of PMR. As per the delineation criteria, the village is accessed by a state highway and MDR, the central location of the village within two urban arms along NH-60 and NH-48. This village has a population higher than the region’s average population per village ie>2000 ppl, and mainly it forms the administrative center (headquarter of a circle level as per revenue department).
The projected population for 2041 for Kadus village is 13,579 while that of the catchment which includes 14 villages is 40,870. Amenities are proposed based on a projected population of 2031 which 12,839 for the village and 38,656 for the catchment. The following map shows the distribution of the projected 2041 population.
Chapter 38:Rural Growth Centres
Figure 38.31: Demographic projections and the rural catchment
Proposed Zoning
The proposed zoning would guide and determine the optimal and efficient land use for the next 20 years. The proposed zoning plan is an output of existing land use and physical conditions analysis, gaothan expansion boundaries, local knowledge of the place, and deployment of five planning goals and allied physical planning strategies. The proposed zoning area statement is presented in the below table.
Following strategies elaborate the zoning plan for the Growth Centre:
Residential Zone:269.49Ha residential zone is proposed surrounding gaothan creating an expansion of existing neighborhood.
Commercial Zone: Commercial zone of 32.52 Ha includes proposed APMC, Agro tourism entertainment center, Rural empowerment center and Market.
Agriculture Zone: Agriculture zone G-1 is proposed over 2092.44 ha land and 124.25 Ha Green zone-2 is covering command area.
Water-body zone: Area 136.88 Ha is covered under water bodies including Kadus dam, Kumandala River, Bhima River and right canal of Chas kaman dam.
Green Belt/ Forest/ Hill top hill slope: Green Belt zoning is proposed between the riverbank of the Kumandal River, Bhima River and its blue line. Forest is 160.72 Ha is situated at southern side of the village whereas Hilltop Hillslope of 554.12 Ha edges north and south side of the rural growth center.
Proposed Amenities:1PHC of 0.1Ha, 1 hospital of 1.13Ha are proposed near gaothan.1 Veterinary hospital of 0.25Ha is proposed. 3 community halls of 0.16Ha and community center of 0.63 Ha is proposed under socio cultural amenities. 1 Market of 0.45Ha is proposed within neighborhood whether Rural Empowerment center of 2.96 Ha, Education complex of 5Ha, sports complex 2.72 Ha are clubbed together on gairan land 3 Km away from proposed neighborhood and well connected with VR137. APMC of 5 Ha and Agro Tourism Entertainment center of 24 Ha is proposed along Bhima river on gairan land.
Proposed Utilties: Proposed utilities like burial ground of 0.32 Ha as per 7/12 extract, WTP 0.5 Ha near Kadus dam, STP away from proposed neighborhood 0.68 Ha along MDR15, SWM at southern side away from settlement is proposed over 1.1 Ha land and 34.47Ha Hilltop gairan land is proposed as Energy Park.
Figure 38.32: Proposed Zoning Map
Table 38.16Proposed Zoning Area Statement
Land use category
Area (ha)
Proportion of Total Devel-oped Area (%)
Proportion of Total Area (%)
Residential
269.49
50.6%
7.3%
Gaothan
12.85
2.4%
0.3%
Commercial
32.52
6.1%
0.9%
Public and semi public
76.16
14.3%
2.1%
Public Utility
37.56
7%
1%
Traffic & Transportation
104.44
19.6%
2.8%
Total Developed Area
533.03
100.0%
14.4%
Agriculture zone G-1
2091.23
56.7%
Green zone G-2
124.25
3.4%
Hill Top- Hill Slope Zone
448.55
12.2%
Afforestation
105.36
2.9%
Water bodies
136.72
3.7%
Green Belt
28.77
0.8%
Forest
160.72
4.4%
Recreational
60.55
1.6%
Total Non-Developable Area
3156.18
85.6%
Total
3689.21
100%
Chapter 38:Rural Growth Centres
Pabal : Cost and Acquisition Statement for Proposed Reservations
Res-er-va-tion No
Purpose of Reser-vation
Taluka
Vil-lage Name
S. No/ Gut No./ CTSNo./F.P.No
Area (ha)
Land Ownership(Govt/GP/PMRDA/Private)
Total Cost of Acqui-sition (INR Cr)
Total Cost of Devel-opment (Const.) (INR Cr)
Total Cost (INR Rs.)
Appro-priate Au-thority
1
Public Housing
Shirur
Pabal
1171
1.46
Government
0.00
41.08
41.08
PMRDA
2
Hospital
Shirur
Pabal
1171
1.03
Government
0.00
25.63
25.63
PMRDA
3
Government Purpose
Shirur
Pabal
1171
3.04
Government
0.00
57.34
57.34
PMRDA
4
Cultural Centre
Shirur
Pabal
1171
0.69
Government
0.00
18.07
18.07
PMRDA
5
Sports Complex
Shirur
Pabal
1171
1.77
Government
0.00
33.36
33.36
PMRDA
6
Rural Empowerment Centre
Shirur
Pabal
1171
1.29
Government
0.00
33.77
33.77
PMRDA
7
Market
Shirur
Pabal
1171
1.24
Government
0.00
32.40
32.40
PMRDA
8
Agri Produce Sub-Marketyard
Shirur
Pabal
1171
3.64
Government
0.00
95.21
95.21
PMRDA
9
Fire Station
Shirur
Pabal
1171
0.39
Private
0.09
7.33
7.42
PMRDA
10
Police Station
Shirur
Pabal
1171
0.38
Government
0.00
7.22
7.22
PMRDA
11
Bus Depot
Shirur
Pabal
1171
0.97
Government
0.00
18.33
18.33
MSRDC
12
Playground
Shirur
Pabal
NA
1.02
Private
0.24
2.05
2.30
PMRDA
13
Multipurpose Ground
Shirur
Pabal
2767
1.93
Private
0.46
3.89
4.35
PMRDA
14
Sewerage Treatment Plant
Shirur
Pabal
3, 50, 23,50, 13, 50,03, 490
0.18
Private
0.04
3.40
3.44
PMRDA
15
Community Hall
Shirur
Pabal
3630
0.06
Private
0.01
1.49
1.51
PMRDA
16
Town Park
Shirur
Pabal
4422
2.10
Private
0.50
6.09
6.59
PMRDA
17
Playground
Shirur
Pabal
4441
1.00
Private
0.24
2.03
2.27
PMRDA
18
Community Hall
Shirur
Pabal
4458,4455
0.12
Private
0.03
3.06
3.09
PMRDA
19
Veterniary Hospital
Shirur
Pabal
1138
0.09
Private
0.02
2.21
2.23
PMRDA
20
Water Treatment Plant
Shirur
Pabal
4881
0.18
Private
0.04
3.34
3.39
PMRDA
21
Solid Waste Manage-ment Site
Shirur
Pabal
2672
1.26
Private
0.30
23.74
24.04
PMRDA
Total
22.57
1.98
421.03
423.02
Pabal:Total Cost of development of Reservations of RGC
Total Acquisition cost of Reservations ( in Rs.CR.)
Total Construction cost of Reservations ( in Rs.CR.)
Total Cost of development of Reservations( in Rs.CR.)
Road construction cost
Total Development Cost
Reservation on Amenity Space/TP scheme/Government (A)
0.00
362.40
362.40
863.14
1255.85
Reservations on Private land
1.98
58.63
60.61
50% of the total cost of reservations on private land with an assumption that 50% of reservations will be developed through TDR/AR & In-situ FSI (B)
0.99
29.32
30.31
Total Cost (A+B)
0.99
391.72
392.71
Rahu: Cost and Acquisition Statement for Proposed Reservations
Res-er-va-tion No
Purpose of Reser-vation
Talu-ka
Vil-lage Name
S. No/ Gut No./ CTS No./F.P.No
Area (ha)
Land Ownership(Govt/GP/PMRDA/Private)
Total Cost of Acqui-sition (INR Cr)
Total Cost of Con-struc-tion (Cr.)
Total Cost of Devel-opment (Cr.)
Appro-priate Au-thority
1
Water Treatment Plant
Daund
Rahu
217
0.61
Gairan
0.00
1.70
1.70
PMRDA
2
Agri Produce Sub-Marketyard
Daund
Rahu
149151
4.54
Private
6.04
118.86
124.91
PMRDA
3
Police Station
Daund
Rahu
148
0.73
Private
0.97
13.72
14.69
PMRDA
4
Multipurpose Ground
Daund
Rahu
122
1.98
Private
2.63
4.00
6.63
PMRDA
5
Community Hall
Daund
Rahu
86
0.09
Private
0.12
2.44
2.56
PMRDA
6
Bus Depot
Daund
Rahu
86
0.93
Private
1.24
17.62
18.87
PMRDA
7
Health Centre
Daund
Rahu
84
0.02
Private
0.02
0.43
0.45
PMRDA
8
Town Park
Daund
Rahu
38, 3, 40,41, 42, 43,Gaothan
1.07
Private
1.43
3.12
4.55
PMRDA
9
Playground
Daund
Rahu
860,779
1.05
Private
1.40
2.13
3.53
PMRDA
10
Market
Daund
Rahu
1474
0.46
Sarkari Akari Pad
0.00
12.07
12.07
PMRDA
11
Fire Station
Daund
Rahu
1474
0.40
Sarkari Akari Pad
0.00
7.58
7.58
PMRDA
12
Sewerage Treat-ment Plant
Daund
Rahu
1075, 1076,1073, 1072
0.59
Private
0.19
2.74
2.93
PMRDA
13
Playground
Daund
Rahu
1308
1.00
Private
1.34
2.03
3.36
PMRDA
14
Community Hall
Daund
Rahu
1308
0.12
Private
0.16
3.17
3.34
PMRDA
15
Sports Complex
Daund
Rahu
1245, 1310
3.01
Private
4.00
56.72
60.72
PMRDA
16
Health Centre
Daund
Rahu
1245
0.08
Private
0.10
1.88
1.98
PMRDA
17
Community Hall
Daund
Rahu
1317
0.13
Private
0.17
3.28
3.44
PMRDA
18
Secondary School
Daund
Rahu
1318
0.94
Private
1.25
17.67
18.92
PMRDA
19
Playground
Daund
Rahu
1413
0.92
Private
1.22
1.85
3.07
PMRDA
20
Rural Empowerment Centre
Daund
Rahu
1323
1.31
Private
1.75
34.39
36.13
PMRDA
21
College
Daund
Rahu
1365
2.87
Private
3.81
54.02
57.83
PMRDA
22
Cultural Centre
Daund
Rahu
1356
1.22
Private
1.62
22.97
24.59
PMRDA
23
Hospital
Daund
Rahu
1347
1.25
Private
1.67
31.17
32.84
PMRDA
24
Solid Waste Management Site
Daund
Rahu
844
1.68
Private
0.18
31.66
31.84
PMRDA
Total
27.02
31.32
447.21
478.53
Chapter 38:Rural Growth Centres
Rahu: Total Cost of development of Reservations of RGC
Total Acquisition cost of Reservations ( in Rs.CR.)
Total Construction cost of Reservations ( in Rs.CR.)
Total Cost of development of Reservations( in Rs.CR.)
Road construction cost
Total Development Cost
Reservation on Amenity Space/TP scheme/Government (A)
0.00
21.34
21.34
525.37
775.31
Reservations on Private land
31.32
425.87
457.19
50% of the total cost of reservations on private land with an assumption that 50% of reservations will be developed through TDR/AR & In-situ FSI (B)
15.66
212.94
228.60
Total Cost (A+B)
15.66
234.28
249.94
Nhavara: Cost and Acquisition Statement for Proposed Reservations
Res-er-va-tion No
Purpose of Reserva-tion
Talu-ka
Village Name
S. No/ Gut No./ CTSNo./F.P.No
Area (ha)
Land Owner-ship(Govt/GP/PMRDA/Private)
Total Cost of Acqui-sition (INR Cr)
Total Cost of Devel-opment (Const.) (INR Cr)
Total Cost (INR Cr.)
Appro-priate Au-thority
1
Cultural Centre
Shirur
Nhavara
47
0.88
Private
0.17
23.01
23.18
PMRDA
2
Market
Shirur
Nhavara
303
0.20
Private
0.04
5.34
5.37
PMRDA
3
Playground
Shirur
Nhavara
303
1.01
Private
0.19
2.04
2.23
PMRDA
4
Veterinary Hospital
Shirur
Nhavara
304
0.23
Private
0.04
5.63
5.67
PMRDA
5
Rural Empowerment Centre
Shirur
Nhavara
385
1.24
Private
0.24
23.34
23.58
PMRDA
6
Fire Station
Shirur
Nhavara
387
0.49
Private
0.09
9.29
9.38
PMRDA
7
Bus Stop
Shirur
Nhavara
392
0.19
Govt. Other Dept
0.00
3.59
3.59
PMRDA
8
Sewerage Treatment Plant
Shirur
Nhavara
409
0.53
Private
0.04
4.16
4.20
PMRDA
9
Community Hall
Shirur
Nhavara
419
0.06
Private
0.01
1.06
1.07
PMRDA
10
Playground
Shirur
Nhavara
854
0.99
Private
0.19
2.00
2.19
PMRDA
11
Police Station
Shirur
Nhavara
8, 68, 867
0.20
Private
0.04
3.74
3.78
PMRDA
12
Health Centre
Shirur
Nhavara
879
0.07
Private
0.01
1.62
1.63
PMRDA
13
College
Shirur
Nhavara
884
1.97
Trust
0.38
37.10
37.48
PMRDA
14
Water Treatment Plant
Shirur
Nhavara
846
0.54
Private
0.02
2.29
2.31
PMRDA
15
Sports Complex
Shirur
Nhavara
885
1.09
Private
0.21
20.57
20.78
PMRDA
16
Agri Produce Sub-Marketyard
Shirur
Nhavara
886
3.99
Private
0.77
104.44
105.20
PMRDA
17
Trauma Care Centre
Shirur
Nhavara
966
1.09
Private
0.21
27.05
27.26
PMRDA
18
Health Centre
Shirur
Nhavara
967
0.05
Private
0.01
1.27
1.28
PMRDA
19
Playground
Shirur
Nhavara
9, 67, 972
1.01
Private
0.19
2.04
2.23
PMRDA
20
Community Hall
Shirur
Nhavara
1120
0.06
Private
0.01
1.15
1.16
PMRDA
21
Town Park
Shirur
Nhavara
15, 16, 17
1.91
Private
0.37
5.54
5.90
PMRDA
22
Solid Waste Manage-ment Site
Shirur
Nhavara
328
1.33
Private
0.15
25.06
5.90
PMRDA
Total
19.11
3.39
311.31
295.40
Nhavra: Total Cost of development of Reservations of RGC
Total Acquisition cost of Reservations ( in Rs.CR.)
Total Construction cost of Reservations ( in Rs.CR.)
Total Cost of development of Reservations( in Rs.CR.)
Road construction cost
Total Development Cost
Reservation on Amenity Space/TP scheme/Government (A)
0.00
3.59
3.59
544.56
703.71
Reservations on Private land
3.39
307.72
311.11
50% of the total cost of reservations on private land with an assumption that 50% of reservations will be developed through TDR/AR & In-situ FSI (B)
1.70
153.86
155.56
Total Cost (A+B)
1.70
157.45
159.15
Kikavi :Cost and Acquisition Statement for Proposed Reservations
Res-er-va-tion No
Purpose of Reservation
TA-LUKA
Vil-lage Name
S. No/ Gut No./ CTSNo./F.P.No
Area_Ha
Land Ownership(Govt/GP/PMRDA/Private)
Total Cost of Acqui-sition (INR Cr)
Total Cost of Devel-opment (Const.) (INR Cr)
Total Cost (INR Cr)
Appro-priate Author-ity
1
Water Treat-ment Plant
Bhor
Kikavi
0.44
359
Govern-ment
0.00
8.31
8.3
PMRDA/Govern-ment
2
Public Housing
Bhor
Kikavi
0.74
359
Private
0.00
0.00
0.0
MHADA
3
Playground
Bhor
Kikavi
0.47
290, 292
Private
0.08
0.95
1.0
PMRDA
4
Cremation Ground
Bhor
Kikavi
0.05
396
Govern-ment
0.00
0.21
0.2
PMRDA
5
Market
Bhor
Kikavi
0.43
400
Private
0.08
11.31
11.4
PMRDA
6
Sports Complex
Bhor
Kikavi
1.51
109
Trust
0.27
28.55
28.8
PMRDA
7
Effluent Treatment Plant
Bhor
Kikavi
0.44
95
Private
0.08
8.38
8.5
PMRDA/MIDC
8
Sewarage Treatment Plant
Bhor
Kikavi
0.56
95
Private
0.10
10.46
10.6
PMRDA/ZP
9
Solid Waste Management Site
Bhor
Kikavi
0.91
138
Private
1.27
17.15
18.4
PMRDA/ZP
10
Primary Health Centre
Bhor
Kikavi
0.06
252
Private
0.09
1.49
1.6
PMRDA
11
Playground
Bhor
Kikavi
0.51
237, 234
Private
0.71
1.03
1.7
PMRDA
12
Community Hall
Bhor
Kikavi
0.05
233
Private
0.07
1.28
1.4
PMRDA
13
Veterinary Hospital
Bhor
Kikavi
0.19
232
Private
0.26
4.62
4.9
ZP
14
Rural Empower-ment Centre
Bhor
Kikavi
0.67
228
Private
0.94
17.61
18.6
PMRDA
15
Hospital
Bhor
Kikavi
1.04
225, 227
Private
1.58
25.80
27.4
PMRDA/Govern-ment
16
Agri Produce Sub-Marketyard
Bhor
Kikavi
1.08
285, 286,287
Private
0.21
28.30
28.5
APMC
Total
5.74
165.45
171.19
Chapter 38:Rural Growth Centres
Kikavi: Total Cost of development of Reservations of RGC :
Total Acquisition cost of Reservations ( in Rs.CR.)
Total Construction cost of Reservations ( in Rs.CR.)
Total Cost of development of Reservations( in Rs.CR.)
Road construction cost
Total Development Cost
Reservation on Amenity Space/TP scheme/Government (A)
0.00
0.21
0.21
37.58
123.39
Reservations on Private land
5.74
165.45
171.19
50% of the total cost of reservations on private land with an assumption that 50% of reservations will be developed through TDR/AR & In-situ FSI (B)
2.87
82.73
85.60
Total Cost (A+B)
2.87
82.94
85.81
Sangarun :Cost and Acquisition Statement for Proposed Reservations