24.4 Proposed Reservation Statement, Costing and Phasing
Table 24.10Proposed Reservation Statement
No
Purpose of Reservation
Planning Standard
Planning Standard
Total Re-quirement
Total Re-quirement
Existing/ Available
Existing/ Available
Proposed Reserva-tions
Proposed Reserva-tions
Total Reserva-tions
Total Reserva-tions
Area (Ha.)
Min unit re-quired
No of sites
Area in Ha
No of sites
Area in Ha
No of sites
Area in Ha
No of sites
Area in Ha
1
Primary School (I-V)*
0.4 ha including playground.
1/5000 ppl,1/500 students
47
18.6
51
10.39
4
1.97
55
12.36
2
Secondary School (VI-XII)*
1 Ha. / site (0.6 ha for play ground and 0.4 ha for building )
1/1000 students 1/10000 population
23
23.25
25
22.23
3
2.83
28
25.06
3
Health Centre
0.08 - 0.12 Ha
1HC / 15,000 population
16
1.86
7
0.86
14
3.29
21
4.15
4
Community Hall
0.2 ha/ site
1/15000 ppl
16
3.10
1
0.20
10
2.04
11
2.24
5
Garden
1 Ha
1/15000 ppl
16
15.50
1
1.02
26.00
25.82
27.00
26.84
6
Playground
1.5
1/15000 ppl
16
23.25
1
0.54
25
27.5
26
28.04
7
Shopping Centre/ Market
0.3-0.45
1/15000 ppl
16
4.65
2
2.54
10
4.53
12
7.07
Town Level
Town Level
Town Level
Town Level
Town Level
Town Level
Town Level
Town Level
Town Level
Town Level
Town Level
Town Level
1
College
5 Ha
1000 - 1500 students
2
10
7
123.20
0
0
7
123.20
1
College
5 Ha
1/1.25 lakh population
2
Hospital/ Trauma Care Centre
Cat A = Area- 3.70 Ha
1/1 Lac
2
2
1
1.20
1
1.04
2
2.24
2
Hospital/ Trauma Care Centre
200 beds, Cat B = Area =1 Ha., 80 beds
3
Public Housing
-
0
0
5
9.38
5
9.38
4
Housing for Dishouse
0
0
0
0
0
0
6
Social Welfare Centre
0.6-1 Ha.
1/1 Lac
2
2
0
0
2
1.68
2
1.68
7
Town Park
3-5
1/1 Lac
2
6
0
0
2
7.9
2
7.9
8
Sports Complex
3-5
1/1 Lac
2
6
0
0
2
3.06
2
3.06
9
Multipurpose Ground
As per land availability
0
0
3
3.10
3.00
3.10
10
Fire Brigade Station
0.4
As per requirement of Fire depart-ment of PMRDA. 1 Fire station / growth centre
2
0.8
0
0
4
1.13
4
1.13
No
Purpose of Reservation
Planning Standard
Planning Standard
Total Re-quirement
Total Re-quirement
Existing/Available
Existing/Available
Proposed Reserva-tions
Proposed Reserva-tions
Total Reserva-tions
Total Reserva-tions
Area (Ha.)
Min unit re-quired
No of sites
Area in Ha
No of sites
Area in Ha
No of sites
Area in Ha
No of sites
Area in Ha
11
Burial ground
4 Ha.
1 site/ 5 lakh,
0
0
1
0.4
1
1.23
2
1.63
12
Cremation ground
2.5 Ha
1 site/ 5 lakh,
0
0
13
2.96
0
0
13
2.96
13
Solid Waste Management Site
5 Ha . (As per land availabili-ty)
1 site per growth centre
1
5
0
0
2
10.18
2
10.18
14
Sewerage treatment plant
80% of water supply may be expected to reach the sewers
Land area requirement is as per URDPFI i.e. For activated Sludge Process(ASP)-0.15Ha/MLD
3.14
0
0
8
5.01
8
5.01
15
Water works (Water treat-ment Plant, tanks & pipes)
Land area requirement is as per URDPFI i.e.Land area requirement is as per URDPFI i.e. 1) 5MLD- 0.10 Ha 2) 10MLD-0.19Ha 3) 50MLD- 0.93 Ha 4) 100MLD-1.87Ha 5) 200MLD-3.73Ha 6) 500MLD-9.34Ha
Water require-ment of PMR is 72 lpcd as per Report 'Integrated Master Plan Of Water Supply, Sewerage, Storm Water and Solid Waste Man-agement in the PMR'. It is distributed to each Growth center.
1.12
0
0
2
1.4
2
1.4
16
Effluent Treatment Plant
As per Requirement
1
0.09
1
0.58
1
0.58
17
Government Purpose
0
0
4
2.55
4
2.55
18
Police Station
As per Government Requirement
0
0
7
3.03
7
3.03
19
Bus Depot
As per Government Authority requirement
1
2.44
1
0.48
2
2.92
20
Electric Sub station
As per Government Requirement
0
0
1
0.2
1
0.2
21
Government Purpose
As per Government Requirement
0
0
4
2.55
4
2.55
Chapter 23: Growth Centre: Loni Kalbhor
No
Purpose of Reservation
Planning Standard
Total Re-quirement
Existing/ Available
Proposed Reserva-tions
Total Reserva-tions
Area (Ha.)
Min unit re-quired
No of sites
Area in Ha
No of sites
Area in Ha
No of sites
Area in Ha
No of sites
Area in Ha
22
Government Office
As per Government Requirement
0
0
3
0.61
3
0.61
23
Post Office
As per Government Requirement
0
0
2
0.13
2
0.13
24
Parking
0
0
5
1.81
5
1.81
25
Trauma Care Centre
0
0
1
0.46
1
0.46
Regional level
1
Town Cwnter
14 Ha. (As per concept plan)
0
0
1
3.72
1
3.72
2
Business Center
0
0
1
2.11
1
2.11
3
Multimodal Hub
0
0
1
5.02
1
5.02
4
Railway Station
2
2.16
3
35.67
5
37.83
5
Truck Terminal
0
0
1
2.76
1
2.76
6
Metro Depot/ Car shed
0
0
1
12.08
1
12.08
7
Renewable Energy Park
0
0
1
19.25
1
19.25
Table 23.11Cost and Acquisition Statement for Proposed Reservations
Water Works (Water Treatment Plant, Tanks and Pipes)
4
130
13
Effluent Treat-ment Plant
100
14
Cultural Centre
15
Electric Sub-sta-tion
30
16
Energy Park
17
Government Purpose
51,86,98
18
Government Office
77, 92
61
Chapter 23: Growth Centre: Loni Kalbhor
Regional level
Purpose of Res-ervation
Phase I (Reser-vation No)
Phase II (Reser-vation No)
Phase III (Reser-vation No)
Phase IV (Reser-vation No)
Phase V (Reser-vation No)
19
Multimodal Hub
54
20
Multipurpose Ground
118
59
79
21
Parking
106
12
158
151,22
22
Police Station
137, 8
121
37
74
23
Post Office
56
24
Public Housing
25
Town Park
23
124
26
Trauma Care Centre
80
27
Truck Terminal
123
28
Government Purpose
11
29
Bus Depot
131
1
Town Centre
53
2
Regional Park
3
Metro Depot / Car Shed
68
4
Railway Station
25
48
5
Business Center
133
6
Energy Park
129
Total Cost of development of Reservations of UGC : Loni Kalbhor
Total Acquisition cost of Reservations ( in Rs.CR.)
Total Construction cost of Reservations ( in Rs.CR.)
Total Cost of development of Reservations( in Rs.CR.)
Road construction cost
Total Development Cost
Reservation on Amenity Space/TP scheme/Government (A)
0.00
790.39
790.39
5150.82
7407.33
Reservations on Private land
804.48
2127.76
2932.24
50% of the total cost of reservations on private land with an assumption that 50% of reservations will be developed through TDR/AR & In-situ FSI (B)
402.24
1063.88
1466.12
Total Cost (A+B)
402.24
1854.27
2256.51
24.1Summary
Khadakwalsa is attributed as ‘Commuter Town’ and has an independent character. The objective behind assigning this role to Khadakwasla is because of its capacity for accommodating future residential population of adjacent Pune City. This area is surrounded by PMC which has employment opportunity, hence work to live relationship can be achieved by promoting residential development. Hilly area and forest are abundant in growth centre. Existance of river and water bodies make growth centre self-sufficient in itself in all natural aspect. PMRDA ring road and NH 48 act as mass transport system to growth centre.
Promote residential development to maintain work-live relation. propose the Town level and neighbourhood level amenities in such way that it will make the growth centre self sufficient and maintain the character of growth centre. i.e ‘Commuter Town’
Promoting Planned Development through TP Scheme to balance over densification.
Enhance the commercial activities and Public semi public area proposed as per regional plan and promote industrial activities for local employment generation.
Develop a grid network of secondary and tertiary roads for a smooth movement within the Growth Centre
Promote PMRDA ring road and NH 48 as Mass transportation system.
Utilization of available government land parcel for upliftment of development.
Promote self-sufficient town by proposing required amenities and utilities for the projected population
Conservation of green cover i.e Forest and Hill top hill slope (HTHS)
Develop Transport infrastructure facilities along major transport corridor.
Establish last mile connectivity to unaccessible villages.
Establish green and blue network by designating green belts along blue line of Mutha river, and existing stream with green avenue.
Promote tourist activities around Khadakwasla Dam.
Integrated Town Planning Scheme in Khadakwasale, Kirkitawadi, Nandoshi and Sanasnagar village.
Education Complex at Khadakwasale (28.48Ha).
Town Centre (CBD) along PMRDA ring road.
Sport Complex (2.19 ha) at Khadakwasle and Nimbalkarwadi
Truck Terminal (3.09 ha) at Mangewadi along PMRDA ring road.
Multimodal hub at Bhilarewadi.
Tourism Development in Khadakwasale and Kondhave Dhavade.