Ranjangaon Growth Centre includes three total villages and part of Shirur village, namely Ranjangaon Ganpati, Karegoan, Dhok Sangavi, Shirur part (Annapur, Saradwadi, Tardobachiwadi, Kardilwadi). The total area under this Growth Centre is 7541.46 ha. According to Census 2011, the Growth Centre population was 40,381, and the estimated population for 2018 is 87444 with 23,668 resident workforce
Ranjangaon Growth Centre enjoys great locational advantage with its proximity to adjoining Ranjangaon MIDC and Pune-Ahmednagar Highway, one of the busiest national highways in PMR. The presence of renowned electronics companies and cultural significance rendered through it being the Maha Ganapati Temple site makes Ranjangaon one of the significant areas in Maharashtra.
Ranjangaon Growth Centre is located on the northeastern side of the PMR within Shirur Taluka. It shares a boundary with Shirur Municipal Council on the northeastern side, whereas the remaining area is surrounded by rural areas. It is located along NH-753F (i.e. Pune-Ahmednagar Highway) and is 54 km from Pune city and 61 km from Pimpri Chinchwad city. Figure 35.1 shows the state highway connecting NH-60 (Pune-Nashik Road) and joining NH-753F near Ranjangaon Ganpati village. SH-113 (Shirur-Satara Road) provides good inter-regional connectivity. Other than NH-753F, major district roads MDR-52, MDR-114 and MDR-100, MDR -115, MDR-90 also contribute towards improving intra-regional connectivity to MIDC developments within Ranjangaon.
Ranjangaon is located on the eastern plains of PMR with a presence of few undulation surfaces in parts north of MIDC and south of Shirur Municipal Council area. The highest point is at 660 m altitude, sloping towards the northeast to 560 m and sloping towards south to 580 m, showing a very gentle slope. The Ghod River edges the northern part of the Growth Centre, with a stream aligning the NH-753F. Ghod dam is located just east of the Growth Centre near Golegaon village. The Chaskaman canal is situated south of Ranjangaon Ganpati gaothan. Another stream starting from the north of Ranjangaon flows south to meet the Bhima river. Almost 40% of the land is under agriculture. 97.5 ha of forest land is present in Shirur part and Dhok Sangavi.
Figure 35.1: Location and Physiography
Chapter 35: Growth Centre: Ranjangaon
While Ranjangaon did not fall under any of the proposed RP sectors, however, a residential zone over a total area of 301 ha was proposed. Out of the total residential area, 171 ha was proposed at Shirur while 83 ha was proposed at Ranjangaon Ganpati. The majority of the residential zone has fructified due to the development of MIDC areas and proximity to Shirur Council and major transport corridors. Moreover, RP 1997 has 52 ha marked as forest in Shirur part. RP 1997 proposed a bypass road to NH 753 F at Shirur village.
Figure 35.2: RP 1997 Zoning Map
Table 35.1RP 1997 Area Statement
Land use category Area (ha)
Proportio oped Are
n of Total Devel- Proportio a (%) (%)
n of Total Area
Residential
301.72
72.76
4.00
Industrial
4.47
1.08
0.06
Public and semi public
4.74
1.14
0.06
Transportation
103.72
25.01
1.38
Total Developed Area
414.65
100.00
5.50
Agriculture
6939.18
92.01
Water bodies
133.43
1.77
Green Belt
3.13
0.04
Forest
51.07
0.68
Total Undeveloped Area
7126.81
94.50
Total Area
7541.46
100.00
MIDC occupies 10.41sqkm of land which is almost 14% of the total area. The industrial zone within the Growth centre, excluding MIDC area is 51 ha, followed by agricultural use with 40% of the land under cultivation. Substantial size vacant land of 2621 ha is observed in the GC at Dhok Sangavi, Karegaon and Shirur. The residential component in Ranjangaon is comparatively small due to dotted residential development. Residential nodal development is observed in Ranjangaon Ganpati, Karegaon and the southern part of Shirur Municipal Council.
Warehouse expansion is seen south of the MIDC area across the highway. Warehousing and logistic developments are also observed south of the MIDC area and NH 753 F near Karegaon village. The Maha Ganpati has a land of 0.35 ha under them, and the total area under existing schools and health care is 79 ha.
Figure 35.3: Existing Land Use Map
Table 35.2Existing Land Use Area Statement
Land use category
Area (ha)
Proportion of Total Devel-oped Area (%)
Proportion of Total Area(%)
Residential
191.87
13.53
2.54
Commercial
86.27
6.08
1.14
Industrial
838.35
59.11
11.12
Public and semi public
19.33
1.36
0.26
Garden, Playground and Recreation
8.79
0.62
0.12
Mix use
3.79
0.27
0.05
Public Utility
1.35
0.10
0.02
Government Land
18.85
1.33
0.25
Chapter 35: Growth Centre: Ranjangaon
Transportation
249.63
17.60
3.31
Total Developed Area
1418.23
100.00
18.81
Agriculture
2998.62
39.76
Water bodies
173.58
2.30
Vacant Land*
2621.70
34.76
Quarry
8.54
0.11
Forest
97.53
1.29
Hill Top Hill Slope
206.01
2.73
Special Areas
17.25
0.23
Total Undeveloped Area
6123.23
81.19
Total Area
7541.46
100
Note: Only building footprint is considered to calculate areas under residential, industrial, commercial and PSP use. It excludes the vacant areas adjoining such a building footprint. Thus, such vacant spaces are covered under the Vacant Land Use category, along with barren lands.
35.3Proposed Role and Strategies
Ranjangaon Growth Centre is envisioned to become an “Integrated Industrial Town” based on the following key considerations:
presence of well established MIDC estates abutting the Pune-Ahmednagar Highway
MIDC development and future expansion providing high employment opportunities
the need for good quality living ecosystem complementing the industrial use
increase in demand for the standard of living through the development of social infrastructure
appetite for real estate for affordable housing through townships and town planning scheme to arrest the daily to and fro commute from PMC/Wagholi
Ranjangaon Ganpati, a pilgrimage destination, need for state of the art facilities to enable the pilgrims and boost tourism activities
Understanding the above, three new nodes are proposed surrounding the MIDC estate, first at Ranjangaon Ganpati, then at Karegaon and Shirur Council with a balanced distribution of amenities and infrastructure. Also, the high demand for the electronics industry is anticipated with future urbanisation and digitisation of the economy, proposed at Karegaon as an extension to existing industrial activities. Thus the development of SMEs as part of the electronic segment would be the economic focus of the area that would leverage the “Integrated Industrial Town”.
The projected resident workforce based on the projected population through the URGD method is 50,045. Considering the proposed economic activities of all the growth centres, employment distribution was proposed based on the envisaged sectoral split for that Growth Centres. Accordingly, the employment to be generated for the Growth Centre for the year 2041 is estimated to be 93,455. The proposed residential density is about 125 PPH (12,500 persons/sq km).
For the planning of public facilities distribution, the Ranjangaon Growth Center is divided into two sectors; one is east of the Growth Centre consisting of Shirur Part, and the other is to the west consisting of Karegaon, Dhok Sangavi and Ranjangaon Ganpati. The boundaries of this planning division are shown on the Proposed Zoning Map. The projected sector-wise population statement is in Table 35.4.
Table 35.4Projected Population - Sectors
Sector
2011
2018
2031
2041
Sector 1
21,671
37978
62,621
88,195
Sector 2
18,710
49466
60,738
71,455
Total
40,381
87444
1,23,359
1,59,650
The proposed zoning would guide and determine the optimal and efficient land use for the next 20 years. The proposed zoning plan is an output of existing land use and physical conditions analysis, understanding of most pressing issues of the Growth Center, local knowledge of the place and deployment of five planning goals and allied physical planning strategies. The proposed zoning area statement is presented in Table 35.5.
Figure 35.4: Proposed Zoning Map
Chapter 35: Growth Centre: Ranjangaon
Table 35.5Proposed Zoning Area Statement
Land use category
Area (ha)
Proportion of Total Devel-oped Area (%)
Proportion of Total Area (%)
Residential
1731.09
40.79
22.95
Gaothan
27.44
0.65
0.36
Commercial
127.76
3.01
1.69
Industrial
810.16
19.09
10.74
Public and semi public
35.40
0.83
0.47
Public Utility
10.53
0.25
0.14
Traffic & Transportation
459.89
10.84
6.10
MIDC
1041.50
24.54
13.81
Total Developed Area
4243.7
56.27
Agriculture (G1)
2616.84
34.70
Water bodies
164.16
2.18
Green Belt
86.97
1.15
Forest
96.06
1.27
Hilltop Hillslope
274.21
3.64
Recreational
37.04
0.49
Quarry
22.41
0.30
Total Non-Developable Area
3297.68
43.73
Total
7541.46
100.00
Proposed zoning ensures that the sectoral development goals are clearly conveyed through it. Proposed sectoral goals and their corresponding physical planning strategies are mentioned in Table 35.6.
Table 35.6Goals and Physical Planning Strategies
Goals
Development Sector Addressed
Physical Planning Strategies
Prudent
Employment and housing
Work- Live Hubs
Convenient
Roads and mass transport
Movement Lattice
Resilient
Environment protection
Green- Blue connectors
Efficient
Infrastructure and utilities
Decentralized resource management
Self- sufficient
Social facilities
Walkable Neighbourhoods
For Ranjangaon Growth Center, the Work-Live concept is applied by:
Designating residential zones within 500 m around industrial and commercial zones to minimize workrelated trips for at least 30% of the resident workforce
Allocating new industrial and commercial zones along the Pune-Ahmednagar Highway edging the MIDC area, equidistance from Ranjangaon and Shirur to reduce travel time for commuting workforce from within and other Growth Centers
Proposing Town centre at Karegaon, at a central location of the Growth Centre
Out of the total proposed industrial zone over 186.6 sq km, industrial use over 18.51 sq km is envisaged in Ranjangaon Growth Centre, both based on projected employment and 50 workers/ha density, which includes 10.41 sq. km of MIDC development.
The industrial zone as per ELU was 0.51sq km (outside MIDC). Considering the existing MIDC development and spotted small scale ancillary industrial development scenario, within the Growth Centre and the planning intent, 18.5 sq km of the industrial zone is proposed in Ranjangaon Growth Centre.
The planning intent is to allow expansion for industries edging the MIDC estate to synergies the probable electronic and ancillary SMEs supporting the MIDC industries as part of the industrial ecosystem. It is also connected to rural catchments utilizing MDRs and village roads to support the agriculture sector.
Land requirement for the residential zone is estimated based on a net residential density of 125 PPH. Further, 45% add-on is considered to account for amenity (15%), open spaces (10%) and roads (20%). Accordingly, the total gross area required for the projected GC population of 1,59,504 by 2041 is estimated to be 18.5 sq km.
Considering the projected population, net residential density, proposed role and existing growth trends within the Growth Centre, 17.43 sq km of gross residential zone is proposed. Understanding the existing mature settlements in Ranjangaon Ganpati and south of Shirur Municipal Council, these residential nodes are expanded to accommodate their future population. With the above mentioned projected higher density, around 435 ha is proposed near Ranjangaon while 643 ha is proposed in the south of Shirur Municipal Council. A new residential node with 120 ha of the area is introduced at Karegaon, aligning the Pune-Ahmednagar Highway catering to the MIDC development. Only 38 ha are proposed around the Dhok Sangavi as part of the Gaothan expansion boundary of 200 m. EWS housing is proposed at Karegaon to facilitate affordable housing projects.
Three commercial nodes are proposed, namely at Ranjangaon Ganpati, Karegaon and Shirur Part. Warehousing and logistic activities are observed at Karegaon. Thus a commercial zone is proposed supporting the service industry activities complementing industrial development. In contrast, the commercial zone proposed at Ranjangaon Ganpati is with an intention to leverage the hospitality sector supporting tourist activities near the Maha-Ganapati temple precinct. Land requirement for the commercial zone is estimated based on URDPFI guidelines, i.e. 0.6 ha per 1,000 population Add on of 30% is considered to account for roads (15%), open spaces (10%) and amenities (5%). Accordingly, the total commercial zone requirement for the Study Area is estimated to be 23.77 sq km. 1.27 sq km from this area is proposed in the Growth Centre such that equitable distribution of commercial activities is facilitated.
‘Convenient’ goal would be addressed by developing a robust road network so that all the developable areas would be conveniently accessible. It implies a lattice (a grid) formed by the existing/proposed roads following a maximum spacing of 300 m - 500 m. This would ensure that road density in the Growth Center would increase (> 1km/sq km) to make it accessible and to improve its carrying capacity.
The movement lattice concept also includes a mass transit corridor running through the Growth Center centre,
Chapter 35: Growth Centre: Ranjangaon
high-speed rail crossing the Centre and Ring Road to encourage >50% of the residents to use mass transport for their daily commute.
A parallel system (30 m road) is proposed to NH-753F on its southern side, bypassing the congested section along the MIDC estate and disconnecting it from local traffic, starting from Ranjangaon until Shirur.
24m bypass is proposed to NH-753 F at Shirur village
A radial grid of collector roads (24-15 m wide) is proposed at Ranjangaon Ganpati and Karegaon.
Collector roads (15-24 m wide) follow spacing of 300-500 m, while Secondary arterial (30-45 m wide) follows a grid of 1 to 2 km.
Secondary arterials have the flexibility to run a dedicated bus service for faster transport and support the feeder system and last-mile connectivity.
All existing roads to be redeveloped and proposed roads are to be designated with at least 3m wide footpath on either side of the road, as the ‘pedestrian right of way’ and as ‘hawker-free zone.’
Figure 35.5: Proposed Transport Network Map
Table 35.7Proposed Transport Network Statement
Road Category
Road names/ ROWs
Proposed ROWs
Authorit
y Total Length (km) Cveolsotp omfe Rnota (dCr D.)e-
Primary
NH753F
60
NHAI
19.75
Secondary
SH103
45
PWD
9.86
Tertiary
MDR114MDR115MDR19MDR52MDR100
2424242424
PWD PWD PWD PWD PWD
6.018.694.272.842.90
ODR145
18
ZP
0.32
ODR148
18
ZP
5.46
Local
VR (Total)
15
ZP
14.23
DP Roads
Primary
MSRDC Ring Road
110
MSRDC
0.00
0
Expressway
90
MSRTC
0.00
0
PMRDA Ring Road
65
PMRDA
0.00
0
Secondary
45
PMRDA
0.00
0
30
PMRDA
12.90
221.15
Tertiary
24
PMRDA
10.51
373.99
18
PMRDA
24.59
229.19
15
PMRDA
32.55
259.69
Local
12
PMRDA
7.79
52.05
Total Road Length
162.67
“Resilient” goal aims to strengthen the inbuilt capacity of Growth Centres to sustain in adverse climatic conditions such as flooding, landslide, air pollution and climate change by protecting environmental features and land susceptible to such threats. The goal also aims to make these features accessible for passive recreation to cover the existing deficit of recreational spaces. It translated into the plan employing the Green- Blue Connector Strategy. ‘Green’ refers to the protected forests and slopes; ‘Blue’ refers to the protected water bodies; and ‘Connector’ refers to the proposed avenues and streams/ canals. Avenue is conceived as a tree-lined road, with NMT provision, linking the Green and Blue features.
The existing forest at Dhok Sangavi and the forest edging the Ghod River is designated as a protected area.
Green Zone to be reserved between the river bank up to the blue line for Ghod River.
All existing streams to be protected.
ROW of Chas Kaman Left bank canal to be protected.
These protected Green-Blue features are recommended to be connected by a 30-45m wide secondary arterial road that would be upgraded as a tree-lined avenue by developing NMT corridors (>3 m each) on both sides of the road and segregated from footpaths.
Green lungs are proposed within 500 m walkable distance covering an area of 119.41 ha. These green lungs include active and passive recreational spaces. The total active recreational space works out to be 22.08 ha that include playgrounds, sport complex, stadium and multi-purpose ground. And the total passive recreational space works out to be 97.32 ha that include gardens, town park/ regional park, bio diversity park and green belt.
Chapter 35: Growth Centre: Ranjangaon
This concept is applied as follow:
A solid waste site is proposed at Dhok Sangvi village
2 Sewerage treatment plants are proposed, one at Ranjangaon along a stream and another at Shirur part along Ghod River.
The effluent treatment plant is proposed adjoining MIDC at Karegaon.
2 WTPs are proposed at higher elevation within Karegaon, having a central location and another at Dhok Sangavi.
ETP is proposed at Karegaon abutting a water stream along the NH-753F, treating industrial waste, especially from the MIDC area.
Renewable energy sites could be proposed and are recommended on higher elevations. However, they would be finalised after a detailed study
A 220 kV substation is present within Ranjangaon MIDC
Currently, six cremation grounds are present in the Growth Centre. Thus no new additions are proposed as it satisfies the requirement
Since there exists a fire station within MIDC, no new fire station is provided.
Table 35.8Proposed Infrastructure Demand
Infrastructure Sys-tem
Demand (2041)
Unit
Utility Sites
Total Area
Water Supply
11.56
MMC
02 WTP
1.47
Sewerage
11.48
MMC
02 STP
4.07
Solid Waste
47.85
Tones/day
01 SWM
2.08
Self-sufficient: Walkable Neighbourhoods
This goal is set to increase the liability index of the Growth Centre. To do that, amenities are proposed within 500 m distance, leveraging the concept of Walkable Neighbourhoods. The concept entails providing basic infrastructure and services for education, health, sports, and recreation within the neighbourhood to have easy access to them by foot.
Amenity provision is made for the projected population by 2031(1,23,358)
Neighbourhood level amenities are located within a 500 m radius from residential zones and are connected by collector/local roads to improve their accessibility from other neighbourhoods.
Ranjangaon Ganpati is the only established urban centre in the Growth Centre. Thus the concentration of amenities is observed in Ranjangaon Ganpati.
Education: Existing schools are well serving the GC, and thus no new schools are proposed. Wherever possible, expansion to the existing ZP schools is proposed with proper road access to each amenity. One primary plus secondary school os proposed at Karegaon. No new college is proposed within the Growth Centre as Shree Mahaganpati Junior College exists at Ranjangaon, and Shri Sitabai Thite College is in Shirur, already serving the locality.
Health: HC is provided considering walking radius within a Neighbourhood. 3 health centres are proposed, each at Shirur, Karegaon and Dhok Sangavi while the hospital is provided at Karegaon, a central location and served by a national highway/secondary arterial.
Socio-Cultural: Community halls are provided considering walking radius distance within a Neighbourhood. 6 community halls are proposed at Karegaon(1), Shirur (2) and Ranjangaon (3). Socio-cultural centre (possibility of Yatri Niwas to be integrated) is provided at Ranjangaon Ganpati, abutting a Neighbourhood
Garden near the Maha-Ganapati Temple complex serving the pilgrims as recreational space and a tourist attraction.
Open Space: Playgrounds are located near existing schools and are split into 2 with a minimum area of 0.8 ha to improve spatial distribution wherever required. 16 playgrounds are proposed, Ranjangaon (6), Karegaon (3), Dhok Sangavi (1) and Shirur (6). Neighbourhood Garden, Town Parks are provided along/ near water bodies, within the green belt or on Government-owned Gairan lands. 11 neighbourhood gardens are proposed, 4 at SHirur, 4 at Ranjangaon, 2 at Karegon and 1 at Dhok Sangavi. The sports complex is provided at the newly opened up residential zone at Karegaon, within the proposed Town Planning Scheme. Town Park is provided along the Ghod River within the green belt in Shirur part.
Commercial: Shopping centre/market is provided at existing commercial nodes/near existing settlements/ available amenity spaces. 3 markets are proposed, 1 at Shirur (amenity space), at Karegaon over government land along NH-753 F and lastly at Ranjangaon Ganpati adjacent to the highway. Town Centre is provided at a central location at Karegaon.
Residential: Two public housing proposals are provided, one at Ranjangaon and other at Kargaon, over government owned land serving the adjoining industrial / commercial activities, covered under the PMAY scheme.
Transport: A bus stop is proposed at the junction of SH-113 and NH-753F, while a bus depot is proposed at Ranjangaon Ganpati over a government land along the NH-753F with a truck terminal opposite to it, adjoining proposed warehouse reservation. Parking places are proposed next to amenities that provide for a larger crowd congregation.
Civic facilities requested by various government authorities: In addition to the above amenities, a warehouse of 2 ha as requested by State Warehousing Corporation is proposed adjoining the MIDC development as part of the industrial ecosystem. A bus depot as requested by PMPML and a truck terminal as per CTTS requirement are proposed at Ranjangaon Ganpati in a clustered approach.
Table 35.9Summary of Land Ownership of Proposed Amenities
Land Ownership
No of Amenity
Total Area (ha)
Government Land
9
11.7
Private Land
45
60.36
Amenity Space
10
4.3
Other
1
1.14
Total
65
77.5
Town Planning Scheme: PMRDA envisages implementing the Development Plan proposals by enabling the provision of Town Planning Schemes, which will considerably reduce liability towards the direct cost of acquisition of land required for social and physical infrastructure. To achieve the economic role of ‘Integrated Industrial Town’, a town planning scheme is proposed at Karegaon. The reservations developed by the TPS mechanism are as follows:
a. Amenities: Town centre, cultural centre, sports complex, market, playgrounds and garden
The other proposals/reservations of the Development Plan are proposed to be acquired and developed through the mechanism of Accommodation of Reservation and Transfer of Development Rights (TDR) policy. It is estimated that all proposed roads and 50% of the public reservations will be acquired through TDR/FSI/ AR. Remaining
The remaining reservations will be acquired under the provision of the Land Acquisition Act by paying monetary compensation.
Chapter 35: Growth Centre: Ranjangaon
Figure 35.6: Strategic Projects
Chapter 35
35.1 Summary
Ranjangaon is located along Pune-Ahmednagar Highway at a distance of 54 km from Pune city. It is one of the major industrial hubs of PMR, with its MIDC area hosting more than 200 domestic and global entities such as LG, FIAT, Whirlpool, Bombay Dyeing and Bekaert. It is also known as the place of Mahaganapati, one amongst the Ashtavinayak.
Ranjangaon is envisioned as an “Integrated Industrial Town” with a focus on promoting industrial and residential real estate through townships and town planning schemes. It is proposed to develop this new town around the existing MIDC area with a balanced distribution of social infrastructure and amenities.
Promote cultural and tourism activities around Maha-Ganapati Ashtavinayak
Promote Work-Live hub concept by increasing residential development adjacent to existing industrial activities
Develop bypasses to primary roads for avoiding congestion due to pilgrimage activities at Ranjangaon and logistic activities
Develop a grid network of secondary and tertiary roads for a smooth movement within the Growth Centre
Promote affordable living supporting the MIDC industrial development
Establish green-blue links by connecting forest and green belts of the Ghod River
Promote self-sufficient town by proposing required amenities and utilities for the projected population
Southern bypass to NH-753F from Ranjangaon Ganpati to Shirur Part via Karegaon
Town Planning Scheme at Karegaon
Town Centre at Karegaon
Socio-Cultural Centre and Garden at Ranjangaon Ganpati
Sports complex at Karegaon
35.4Proposed Reservation Statement, Costing and Phasing
Table 35.10Proposed Reservation Statement
Sr.
Purpose of Reservation
Planning Standard
Total Requirement
Existing/Available
Proposed reservations
Total Reservations
Area
Min. unit required
No. of sites
Area in Ha
No. of sites
Area in Ha
No. of Sites
Area in Ha
No. of sites
Area in Ha
Neighbourhood Level
1
Primary School I - V
0.4 ha including playground.
1/500 students
25
10
31
6.9
1
0.35
32
7.25
1/5000population
2
Secondary VI - XII
1 Ha. / site (0.6 ha for play ground and 0.4 ha for building )
1/1000students
12
12.34
15
5.9
1
0.67
16
6.57
1/10000population
3
Healthcare Centre
0.08 - 0.12Ha
1HC / 15,000 population
8
1
5
0.8
3
0.54
8
1.34
4
Community Hall
0.2 ha/ site
1 /15,000population
8
1.6
1
0.06
7
1.54
8
1.6
5
Garden
1 Ha
1/15000population
8
8.22
1
0.16
11
10.36
12
10.52
6
Playground
1.5Ha
1/15,000population
8
12.34
0
0
16
17.09
16
17.09
7
Shopping Centre
0.3- 0.45 Ha
1/15,000population
8
3.7
2
0.69
5
2.46
7
3.15
Town Level
8
College
5 Ha
1000 - 1500students
1
4.93
2
0.25
0
0
2
0.25
1/1.25 lakh population
9
Hospital/Trauma Care Centre
Cat A = Area- 3.70 Ha
1/100,000population
1
1.23
0
0
1
1.02
1
1.02
200 beds, Cat B = Area =1 Ha., 80 beds
10
Public Housing
_
_
1
3.03
4
5.26
5
8.29
11
Housing for Dishouse
_
_
0
0
0
0
0
0
0
0
12
Cultural Centre/
0.6-1 Ha.
1/ 1Lakh
1
0.99
0
0
1
0.94
1
0.94
Social Welfare Centre/
Socio-Cul-tural Centre
13
Town Park
3- 5 Ha.
1 / 1 lakh
1
4.93
0
0
1
4.4
1
4.4
14
Sports complex
3- 5 Ha.
1 / 1 lakh
1
4.93
0
0
1
5.02
1
5.02
15
Multipur-pose Ground
As per land availability
0
0
0
0
0
0
0
0
Chapter 35: Growth Centre: Ranjangaon
Sr.
Purpose of Reservation
Planning Standard
Planning Standard
Total Requirement
Total Requirement
Existing/Available
Existing/Available
Proposed reservations
Proposed reservations
Total Reservations
Total Reservations
Sr.
Purpose of Reservation
Area
Min. unit required
No. of sites
Area in Ha
No. of sites
Area in Ha
No. of Sites
Area in Ha
No. of sites
Area in Ha
16
Fire Brigade station
0.4 Ha.
As per requirement of Fire department of PMRDA. 1 Fire station / growth centre
1
0.4
1
0.28
0
0
1
0.28
17
Burial ground
4 Ha.
1 site/ 5 lakh,
1
0.99
0
0
0
0
0
0
18
Cremation ground
2.5 Ha
1 site/ 5 lakh,
1
0.62
6
1.39
0
0
6
1.39
19
Parking
As per land availability
As per land availability
0
0
0
0
0
0
0
0
20
Solid Waste Management Site
5 Ha . (As per land availability)
1 site per growth centre
0
0
1
2.08
1
2.08
21
Sewerage treatment plant
80% of water supply may be expected to reach the sewers
Land area requirement is as per URDPFI i.e. For activated Sludge Process (ASP)-0.15 Ha/MLD
1
2.3
0
0
2
4.07
2
4.07
22
Water works (Water treatment Plant, tanks & pipes)
Land area requirement is as per URDPFI i.e.
Water requirement of PMR is 72 lpcd as per Report 'Integrated Master Plan Of Water Supply, Sewerage, Storm Water and Solid Waste Management in the PMR'. It is distributed to each Growth center.
1
0.19
0
0
2
1.47
2
1.47
22
Water works (Water treatment Plant, tanks & pipes)
Table 35.11Cost and Acquisition Statement for Proposed Reservations
Water Works (Water Treatment Plant, Tanks and Pipes)
26,39
14
Effluent Treatment Plant
27
15
Government Purpose
5
16
Police Station
6
17
Warehouse
62
18
Bus Stand
19
19
Bus Depot
63
20
Toursit Center
56
Regional level
1
Truck Terminal
64
Total Cost of development of Reservations of UGC : Ranjangaon
Total Acquisition cost of Reserva-tions ( in Rs.CR.)
Total Con-struction cost of Reser-vations ( in Rs.CR.)
Total Cost of development of Reservations( in Rs.CR.)
Road con-struc-tion cost
Total De-velopment Cost
Reservation on Amenity Space/TP scheme/Government (A)
0.00
428.04
428.04
2453.62
2996.83
Reservations on Private land
19.86
210.47
230.33
50% of the total cost of reservations on private land with an assumption that 50% of reservations will be developed through TDR/AR & In-situ FSI (B)
9.93
105.24
115.17
Total Cost (A+B)
9.93
533.28
543.21
Chapter 36: Growth Centre: Yawat
1) 5MLD-0.10 Ha
Water requirement of PMR is 72 lpcd as per Report 'Integrated Master Plan Of Water Supply, Sewerage, Storm Water and Solid Waste Management in the PMR'. It is distributed to each Growth center.
1
0.19
0
0
2
1.47
2
1.47
22
Water works (Water treatment Plant, tanks & pipes)
2) 10MLD-0.19Ha
Water requirement of PMR is 72 lpcd as per Report 'Integrated Master Plan Of Water Supply, Sewerage, Storm Water and Solid Waste Management in the PMR'. It is distributed to each Growth center.
1
0.19
0
0
2
1.47
2
1.47
22
Water works (Water treatment Plant, tanks & pipes)
3) 50MLD-0.93 Ha
Water requirement of PMR is 72 lpcd as per Report 'Integrated Master Plan Of Water Supply, Sewerage, Storm Water and Solid Waste Management in the PMR'. It is distributed to each Growth center.
1
0.19
0
0
2
1.47
2
1.47
22
Water works (Water treatment Plant, tanks & pipes)
4) 100MLD-1.87Ha
Water requirement of PMR is 72 lpcd as per Report 'Integrated Master Plan Of Water Supply, Sewerage, Storm Water and Solid Waste Management in the PMR'. It is distributed to each Growth center.
1
0.19
0
0
2
1.47
2
1.47
22
Water works (Water treatment Plant, tanks & pipes)
5) 200MLD-3.73Ha
Water requirement of PMR is 72 lpcd as per Report 'Integrated Master Plan Of Water Supply, Sewerage, Storm Water and Solid Waste Management in the PMR'. It is distributed to each Growth center.
1
0.19
0
0
2
1.47
2
1.47
22
Water works (Water treatment Plant, tanks & pipes)
6) 500MLD-9.34Ha
Water requirement of PMR is 72 lpcd as per Report 'Integrated Master Plan Of Water Supply, Sewerage, Storm Water and Solid Waste Management in the PMR'. It is distributed to each Growth center.