Nasrapur is envisioned as ‘Heritage Tourism & Education Hub’. It leverages upon its natural setting created by hill ranging over the northern and eastern boundary. Nasrapur region is bestowed with many popular and some unexplored forts, along with the religious attractions with a potential for growth in tourism related activities. Considering present trend of city institutions setting up campuses at the outskirts and advent of new national/ international universities at fringes of the city to avail cheaper lands and conducive environment for learning, Nasrapur Growth Centre provides a perfect setting for development of Education Hub.
Promote consolidated clustered development of tourism related activities at potential tourism nodes.
Promote consolidated development of educational hub in vicinity of transport corridor.
Consolidate industrial zone around existing and industrial zone proposed in RP 1997;
Open up residential zone around proposed industrial and commercial zone, within 500m to promote work live concept.
Develop a grid network of secondary and tertiary roads for a smooth movement within the Growth Centre
Establish green and blue network by designating green belts along Shivganga and Gunjavani river .
Promote self-sufficient town by proposing required amenities and utilities for the projected population.
Tourist Centre near Baneshwar Temple at Nasrapur along ODR 96.
Development of tourism activity adjoiing to Devadi Dam and Tourist Centre therein.
Educational Complex at Kelavade.
30 m. bypass to SH 106.
Town Planning Scheme proposed in Kelavade and Nasrapur village.
Public Housing proposed in Kelavade village within TPS.
34.3Proposed Role & Strategies:
Nasrapur is envisioned as ‘Heritage Tourism & Education Hub’ weighing upon following assets:
Natural setting created by hill ranging over the Northern and Eastern boundary as well as Shivganga and Gunjavani Rivers flowing on the Western and Southern edge.
Bestowed popular and some unexplored forts, along with the religious attractions (Dargah, Temples) with a potential for growth in tourism related activities and has potential to become hub for tourists, visiting salient forts with heritage tourism potential.
Considering present trend of city institutions setting up campuses at the outskirts and advent of new national/ international universities at fringes of the city to avail cheaper lands and conducive environment for learning, Nasrapur Growth Centre provides a perfect setting for development of Education Hub.
34.2Existing Situation Analysis
Nasrapur Growth Centre comprises of 12 villages from Bhor and PurandarTalukas as below:
Bhor taluka comprises of 9 villages namely, Varve Kh., Varve Bk., Kelavade, Naygaon, Kamthadi, Nasrapur, Harishchandri, Kapurhol and Divele.
Purandar taluka comprises of 3 villages, Ketkawale, Devadi and Chivhewadi. 2 villages out of total 12 falls under Western Ghat villages, namely, Ketkavale and Chivhewadi.
Area of the Growth Centre is about 5754.41 Ha. and it’s population was about 19,605, as per Census 2011.
Key strengths of the Growth Centre are established tourism nodes and its connectivity to Pune via Mumbai-Bangalore Highway (NH 48). Existing trend of well-planned low density residential enclaves and amusement parks and has potential to become hub for tourists, visiting salient forts with heritage tourism potential. Saswad Airport is made accessible by MSRDC Ring Road and SH 119.
Location & Connectivity
Nasrapur Growth Centre is located on the south of PMR Region along the Mumbai-Bangalore Highway (NH 48). It shares Northen boundary with KhedShivapur Growth Centre. It is connected to PMC to the north by Mumbai-Bangalore Highway (NH 48). It’s future connectivity is likely to be strengthened by widening of NH 48. Connectivity to, proposed Saswad Airport is strengthened by proposed MSRDC Ring Road and SH 119. Proximity to proposed Chatrapati Sambhaji Maharaj Airport near Saswad (approx.18 KM) and MSRDC 110M ring road (approx. 0.16 Km from boundary)has potential for extension of existing Industrial Cluster in the growth center. Devadi dam, PratiBalaji and Baneshwar temple is the main tourist attraction in Nasrapur Growth Centre and a well known Navsahyadri College of Engineering of Navsahyadri Education Society is in Naygaon village. The approximate distance of Nasrapur, from PMC and PCMC is 26 km and 51 km, respectively.
Terrain of Nasrapur is sloping towards south west with presence of hills on Northern and Eastern edge. Shivganga and Gunjavani rivers flow along western and southern boundary of the Growth Centre. Physiography of the area is greatly influenced by the presence of Sahyadri Hills.
Figure 34.1: Location & physiographic
Chapter 34: Growth Centre: Nasrapur
Regional Plan (RP) 1997 Analysis
Nasrapur Growth Centre lies under Sector Q and Pune District of RP 1997. As per RP 1997, most of the area under Growth Centre was proposed to be agriculture, with four major residential nodes at Kapurvhol, Nasrapur , Varve Khurd and Kelavade villages and an industrial node at Kelavade. Small industrial parcel were also proposed along NH 48. Two bypasses were proposed to NH 48 in RP. In terms of implementation of RP1997, Industrial zone is mostly implemented and extended along NH 48. Residential area is witnessed, under-developed. 2081.73 ha of agriculture zone proposed in the Regional Plan dominates the Growth centre.
Figure 34.2: RP 1997 Zoning Map
Table 34.1RP 1997 Area Statement
Land use category
Area (Ha)
Proportion of Total Devel-oped Area (%)
Proportion of Total Area (%)
Residential
510.66
62%
9%
Gaothan
61.36
7%
1%
Industrial
79.31
10%
1%
Transportation
171.00
21%
3%
Total Developed Area
822.34
100%
14%
Agriculture
2081.73
36%
Forest
1083.75
19%
Afforestation
1657.91
29%
Water bodies
107.35
2%
Total Undeveloped Area
4930.75
86%
Total Area
5753.09
100%
Existing Land Use
Agriculture (about 38.4%), Hill Top Hill Slope and forest (about 30.1%) and Vacant land (about 21%), dominates existing landuse composition of the Growth Centre. Sum of non-developable areas (about 92.8%) that includes agriculture, forest, hill top hill slope, special areas, recreational, and water bodies conveys environmental sensitivity of the planning area. Developed areas are about 7.2% of the total area of Growth Centre. It is dominated by residential and commercial zones.
Implementation of industrial zone proposed under RP 1997 can be seen at Kelavade. Commercial development is seen along NH 48 and in villages like Kelavade, Nasrapur and Harishchandri. Share of agricultural land is significant (38.4%) due to the presence of Shivganga and Gunjavani River and its topographic setting. Share of vacant land is also sizeable, since residential zone proposed in RP 1997 is is remained undeveloped due to lack of roads and social infrastructure. Compared to the existing demand and surge in growth of industries along NH 48, road and transport infrastructure is not adequate, has led to traffic congestion issues.
Figure 34.3: Existing land use map
Chapter 34: Growth Centre: Nasrapur
Table 34.2Existing land use area statement
Land use category
Area (Ha.)
Proportion of Total Developed Area (%)
Proportion of Total Area (%)
Residential
113.59
28%
2%
Gaothan
38.43
9%
0.7%
Commercial
40.75
10%
0.7%
Mixed
8.24
2%
0.1%
Industrial
33.41
8%
0.6%
Public - semi Public
47.25
11%
0.8%
Transport
127.57
31%
2.2%
Public Utilities
2.72
1%
0.05%
Total Developed Area
411.97
100%
7.2%
Agriculture
2206.52
38.4%
Forest
1031.20
17.9%
Hilltop Hillslope
702.79
12.2%
Special areas
4.88
0.1%
Recreational
0.53
0.0%
Water Body
189.20
3.3%
Vacant land
1206.09
21 %
Total Non-Developed Area
5341.20
92.8%
Total
5753.17
100.0%
Key Challenges:
Residential zone proposed in RP 1997 is not developed to its full potential.
Compared to the existing demand and surge in growth of industries along NH 48, road and transport infrastructure is not adequate, has led to traffic congestion.
Scattered development has seen surrounding to Gaothans.
Absence of sewerage, storm water drainage and solid waste management sites.
Socio - Economic Projections
Based on the URGD method, projected population for the Growth Center would be as below:
Table 34.3Population Projections
Village
2011
2018
2031
2041
Chivhewadi
738
826
990
1,117
Devadi
1,201
1,255
1,354
1,430
Divale
1,269
1,371
1,560
1,706
Harishchandri
904
2,760
3,708
3,861
Kamthadi
2,452
2,779
3,134
3,350
Kapurhol
1,533
1,651
1,869
2,036
Kelawade
2,888
6,298
8,131
8,503
Ketkawale
1,250
1,878
2,294
2,441
Nasrapur
3,812
7,034
8,767
9,118
Naygaon
402
403
405
407
Varve Bk.
926
1,201
1,461
1,604
Varve Kh.
2,230
3,413
4,362
4,805
Total
19,605
30,869
38,037
40,378
The projected resident workforce based on the projected population through the URGD method is 19,180. Considering the proposed economic activities of all the growth centres, employment distribution was proposed based on the envisaged sectoral split for that Growth Centres. Accordingly, the employment to be generated for the Growth Centre for the year 2041 is estimated to be 19,582. The proposed residential density is about 100 PPH (10,000 persons/sq km).
For the planning of sustainable and self-sufficient infrastructure and amenities distribution with less population density, the Growth Centre is considered as a single sector.
Proposed zoning would determine efficient use of land for the next 20 years. Proposed zoning plan is an output of existing landuse and physical conditions analysis; understanding of most pressing issues of the Growth Center; local knowledge of the place; and deployment of five planning goals and allied physical planning strategies. The proposed zoning area statement is presented in Table 34.4.
Chapter 34: Growth Centre: Nasrapur
Figure 34.4: Proposed zoning map
Table 34.4Proposed zoning area statement
Land use category
Area (ha)
Proportion of Total Devel-oped Area (%)
Proportion of Total Area (%)
Residential
722.13
42.26%
12.55%
Gaothan
34.29
2.01%
0.60%
Commercial
146.88
8.60%
2.55%
Industrial
111.45
6.52%
1.94%
Public semi Public
80.86
4.73%
1.41%
Tourism Development
275.54
16.13%
4.79%
Transport
330.88
19.36%
5.75%
Public Utilities
6.64
0.39%
0.12%
Total Developable Area
1708.68
100.00%
29.70%
Agriculture (G-1)
1996.29
34.70%
Forest
1033.61
17.97%
Afforestation
177.93
3.09%
Hilltop Hill slope
609.58
10.60%
Green Belt
25.28
0.44%
Recreational
15.08
0.26%
Water Body
173.49
3.02%
Quarry
13.19
0.23%
Total Non-Developable Area
4044.45
70.30%
Total
5753.13
100.00%
Translating Goals into the Plan
Proposed zoning ensures that the sectoral development goals are clearly conveyed through it. For brevity, proposed sectoral goals and their corresponding physical planning strategies are mentioned in figure below:Proposed zoning ensures that the sectoral development goals are clearly conveyed through it. Proposed sectoral goals and their corresponding physical planning strategies are mentioned in Table 34.5
Table 34.5Goals and physical planning strategies
Goals
Development Sector addressed
Physical planning strategies
Prudent
Employment and housing
Work- Live Hubs
Convenient
Roads and mass transport
Movement Lattice
Resilient
Environment protection
Green- Blue connectors
Efficient
Infrastructure and utilities
Decentralised resource management
Self- sufficient
Social facilities
Walkable Neighbourhoods
‘Prudent’ goal would be addressed by Work-live concept that implies working closer to homes. As explained in proposed vision framework, in context of metropolitan regions it is assumed that maximum 30% of the resident workforce would be employed within a suburb/ town where they reside.
For Nasrapur Growth Center, work-live concept is applied by
Designating residential zones within 500m around industrial and commercial zones to minimize work related trips for atleast 30% of resident workforce.
Expansion of industrial zone at Kelavade, Varve Bk, Varve Kh.of total area 112.81 Ha. along NH48.
Designating commercial zone area from Kelavade to Kamthadi village of total area 147.33 Ha. , along NH 48.
Designating tourism development zones to foster employment to the local population by promoting tourism related economic activities.
Town Centre is proposed in Kelvade village.
Adjoining to Education complex , District court , Trauma care centre, residential zone is proposed in Kelavade village.
Industrial/ Logistics Zone:
The total logistic land use requirement of the Study Area is estimated to be 2020 Ha. considering projected demographics and area requirement of 55 sqm built-up area per person. 100 Ha. of this estimated area is anticipated in Nasrapur Growth Centre. However by considering proposed industrial zone of 79.31 Ha. at sporadic locations along NH 48 in sanctioned RP and existing industrial development, total 11.45 Ha. of industrial zone is proposed along NH 48.
As per the provision of DCPR, the logistic activity is also permissible in industrial zone.
Chapter 34: Growth Centre: Nasrapur
Land requirement for the residential zone is estimated based on a net residential density of 100 PPH. Further, 45% add-on is considered to account for amenity (15%), open spaces (10%) and roads (20%). Accordingly, the total gross area required for the projected GC population of 40,378 by 2041 is estimated to be 590 Ha.
Considering the projected population, net residential density, residential zone in sanctioned RP, proposed role and existing growth trends within the Growth Centre, 722.13 Ha. of gross residential zone is proposed. As per work-live hub concept, consolidated residential zone is proposed. In sanctioned RP, 507 Ha. area was proposed under residential zone. Existing Gaothan at Varve Khurd, Varve Bk., Kelavade, Naygaon, Nasrapur, Kamthadi, Harishchandri, Devadi considered as a social nuclei. Also residential zone is proposed for the expansion of 4 Gaothans (Divale, Ketkavale, Devadi and Naygaon ) upto 200 m, which are located away from main development. Thus total proposed residential zone covering 704.89 Ha. Majority of residential zone lies within 500 metres from commercial zone fostering a work-live environment. Town Planning Scheme is proposed in Kelavade and Nasrapur ,a combination of residential, commercial and PSP zone remarking a work live relationship.
Land requirement for the commercial zone is estimated based on URDPFI guidelines, i.e. 0.6 ha per 1,000 population. Two cardinal commercial nodes are proposed along NH 48. One is from Kelavade, to Nasrapur village serving surrounding villages.Due to MSRDC Ring road and NH 48 junction , good accessibility will be provided to growth centre. Second node is proposed at Kapurhol near the junction of SH 119 and NH 48 to serve the surrounding neighbourhood. Total proposed commercial zone is 146.88 Ha.Town Centre is located in Kelavade village.
Tourism Development Zone:
Nasrapur region is bestowed with the religious and heritage attractions with a potential for growth in tourism related activities. Considering existing tourist attractions, Tourism zone is proposed at two major nodes. One of the node is in the village Devadi and Ketkavale, in close proximity to Devadi Dam. Another tourism node is in Nasrapur near Baneshwar Temple.
Convenient: Movement Lattice:
‘Convenient’ goal would be addressed by developing a robust road network so that all the developable areas would be conveniently accessible. It implies a lattice (a grid) formed by the exiting/ proposed roads following maximum spacing of 300m - 500m. This would ensure that road density in the Growth Center would increase (> 1km/sqkm) to make it accessible; and improving its carrying capacity.
Movement lattice concept also includes mass transit corridor running through center of the Growth Center Ring Road, to encourage >50% of the residents to use mass transport for their daily commute.
This concept is applied as described in the following paragraph. MSRDC Ring Road (110 M) connects the growth centre with proposed Saswad Airport on the East and Pirangut Growth Centre on the West.
As per the proposal of sanctioned regional plan, 30 m. wide bypass road for the NH 48( about 10 km. length) is proposed from Kapurvhol to Varve Bk.
Widening of SH 106 unable due to existing structures, hence another 30 m. wide road has been proposed at it’s southern side to reduce congestion at SH 106.
SH 119 connects the growth centre to proposed airport at Saswad. Therefore to enhance the connectivity, 45 m widening has been proposed for the said road.
Grid-iron pattern of collector roads is proposed in the Growth Centre covering the entire residential and industrial zone.
All proposed roads are to be designated with at least 3m wide footpath on either side of the road, as the ‘pedestrian right of way’ and as a ‘hawker-free zone’.
Figure 34.5: Proposed transport network map
Table 34.6Proposed transport network statement
Road Category
Road names/ ROWs
Proposed
ROWs Authority
T (komta)l Length T d cooevstaet(llIo rNopRamd Cern)t
Primary
NH48
60
NHAI
11.55
Secondary
SH 106 SH 119
2430
PWD PWD
1.8210.91
Tertiary
ODR 95 ODR 96 ODR 106
181818
ZP ZP ZP
0.075.571.82
Local
VR (Total)
15
ZP
24.10
DP Roads
Primary
MSRDC Ring Road
110
MSRDC
4.04
Secondary
30
PMRDA
16.67 307
Tertiary
241815
PMRDA PMRDA PMRDA
2.37 36.7737.92 417.805.43 53.38
Local
129
PMRDA PMRDA
7.09 61.10.03 0.2
Total Road Length
73.56 606.25
Chapter 34: Growth Centre: Nasrapur
Resilient” goal aims to strengthen the inbuilt capacity of Growth Centres to sustain in adverse climatic conditions such as flooding, landslide, air pollution and climate change by protecting environmental features and land susceptible to such threats. The goal also aims to make these features accessible for passive recreation to cover the existing deficit of recreational spaces. It translated into the plan employing the Green- Blue Connector Strategy. ‘Green’ refers to the protected forests and slopes; ‘Blue’ refers to the protected water bodies; and ‘Connector refers to the proposed avenues and streams/ canals. Avenue is conceived as a tree-lined road, with NMT provision, linking the Green and Blue features.
Application of the concept is carried out as below:
All lands with slope >1:5 and Afforestation Zone proposed in RP 1997 are designated as Hill top hill slope zone.
Existing forest is designated as protected area;
Green belt zone is reserved between river bank up to blue line for Shivganga and Gunjavani River ;
Green belt of 15 m. wide proposed surrounding to Devadi Lake.
Green lungs are proposed within 500 m walkable distance covering an area of 40.84 ha. These green lungs include active and passive recreational spaces. The total active recreational space works out to be 7.3 ha that include playgrounds, sport complex, stadium and multi-purpose ground. And the total passive recreational space works out to be 33.47 ha that include gardens, town park/ regional park, bio diversity park and green belt.
Efficient: Decentralised resource management
The realisation of the ‘Efficient’ goal would mean successful management of natural resources and implementation of proposed infrastructure network as well as utility sites covering 100% projected populaton of a Growth Centre. These networks are proposed to be integrated systems using smart metering, renewable energy and SCADA systems. The goal would cover infrastructure systems such as water supply, wastewater, stormwater, electricity and solid waste management systems.
A Water treatment plant (0.34 Ha.) is provided at Kelavadein the Growth Centre.
STP (0.58 ha) is provided at Kelavade, away from the residential development.
Solid Waste Management site of 0.55 Ha. is proposed at Kelavade and is accessible by ODR 96.
1 ETP is proposed in Varve Bk. within proposed industrial zone.
Table 34.7Infrastructure requirement and proposals
Infrastructure System
Demand (2041)
Unit
Required Area
Utility sites
Total Area
Water Supply
2.93
MLD
0.1
1WTP
0.34
Sewerage
2.91
MLD
0.44
1STP
0.58
Solid Waste
12.11
Tones/day
0.48
1 SWM
0.55
Effluent Treatment
_
_
_
1 ETP
0.35
Self-sufficient: Walkable Neighbourhood
This goal is set to increase the liability index of the Growth Centre. To do that amenities are proposed within 500m distance as per concept of Walkable Neighbourhoods. The concept entails provision of basic services for education, health, sports and recreation within neighbourhood so that the resident can have easy access to them by foot.