15.1 The provisions given in 14.1 to 14.4 of Part 6 'Structural Design, Section 5 Concrete, Subsection 5A Plain and Reinforced Concrete' of the Code shall apply.
Samples from fresh concrete shall be taken as per accepted standard [6-5B(19)] and cubes shall be made, cured and tested at 28 days in accordance with the accepted standard [6-5B(22)].
15.2 In addition to the tests required as per Part 6 'Structural Design, Section 5 Concrete, Subsection 5A Plain and Reinforced Concrete' of the Code, additional cube tests should be conducted at appropriate intervals to ensure that the concrete strength in the member at transfer conforms to the design requirements.