Backbone — Part 8/Section 6
Backbone Cabling Media Distribution and Building
Pathway — Part 8/Section 6
Back Fill — Part 6/Section 2
Back Pressure Backflow — Part 9/Section 1
Back Siphonage — Part 9/Section 1
Back to Back Cluster — Part 3
Back Up — Part 9/Section 2
Back-up Protection — Part 8/Section 2
Back Water Valve — Part 9/Section 2
Backflow — Part 9/Section 1
Backflow Prevention Device — Part 9/Section 1
Background noise — Part 8/Section 4
Background Noise Correction — Part 8/Section 5B
Balcony — Part 3
Balustrade — Part 6/Section 8, Part 8/Section 5B
Balustrade Decking — Part 8/Section 5B
Bamboo — Part 6/Section 3B
Bamboo Clump — Part 6/Section 3B
Bamboo Culm — Part 6/Section 3B
Bamboo Mat Board — Part 6/Section 3B
Bamboo Mat Corrugated Sheet — Part 6/Section 3B
Bamboo Mat Veneer Composite — Part 6/Section 3B
Band — Part 6/Section 4
Banner — Part 10/Section 2
Banner Sign- Part 10/Section 2
Barrel — Part 9/Section 1
Barrier — Part 8/Section 2
Base — Part 9/Section 1
Basement or Cellar — Part 3
Basic Protection — Part 8/Section 2
Basic Module — Part 6/Section 7A, Part 6/Section 7B
Bath Room Group — Part 9/Section 1, Part 9/Section 2
Bather Load — Part 9/Section 1
Batter Pile (Raker Pile) — Part 6/Section 2
Battery of Fixtures — Part 9/Section 2
Beads or Glazing Beads — Part 6/Section 8
Beam — Part 6/Section 3B, Part 6/Section 6
Beam, Built-Up-Laminated — Part 6/Section 3A
Beam, Glued-Laminated — Part 6/Section 3A
Bearing Capacity, Safe — Part 6/Section 2
Bearing Capacity, Ultimate — Part 6/Section 2
Bearing Pressure, Allowable (Gross or Net) — Part 6/
Section 2
Bearing Type Connection — Part 6/Section 6
Bed Block — Part 6/Section 4
Bed Pan Washer — Part 9/Section 2
Bedding — Part 9/Section 1
Benching — Part 9/Section 2
Benchmarking — Part 12
Biodegradable Waste — Part 12
Biodiversity — Part 11
Bite — Part 6/Section 8
Biodegradable Substance — Part 9/Section 3
Building, Height of — Part 2, Part 3, Part 4
Biomethanation — Part 9/Section 3
Block (Setting Block) — Part 6/Section 8
Bond — Part 6/Section 4
Bonded Member — Part 6/Section 5B
Bonded Post-tensioning — Part 6/Section 5B
Bonding Conductor — Part 8/Section 2
Bonding Ring Conductor (BRC) — Part 8/Section 2
Bored Cast In-situ Pile — Part 6/Section 2
Bored Compaction Pile — Part 6/Section 2
Bored Pile — Part 6/Section 2
Bottom Car Clearance — Part 8/Section 5A
Bottom Car Run-by — Part 8/Section 5A
Bottom Counterweight Run-by — Part 8/Section 5A
Box System — Part 6/Section 4
Braced Member — Part 6/Section 6
Brake Load — Part 8/Section 5B
Branch — Part 9/Section 2
Branch Soil Pipe (BSP) — Part 9/Section 2
Branch Soil Waste Pipe (BSWP) — Part 9/Section 2
Branch Vent Pipe (BVP) — Part 9/Section 2
Branch Waste Pipe (BWP) — Part 9/Section 2
Breadth — Part 6/Section 1
Break-In — Part 8/Section 4
Break-Out — Part 8/Section 4
Breaking Strength — Part 6/Section 3B
Bresummer — Part 6/Section 3A
Briefing — Part 12
Brightness Ratio or Contrast — Part 8/Section 1
Brittle Cladding — Part 6/Section 6
Broad Band Noise — Part 8/Section 4
Buckling Load — Part 6/Section 6
Buckling Strength or Resistance — Part 6/Section 6
*Buffer — Part 8/Section 5A, Part 10/Section 1
Buffer Zone — Part 12
Building — Part 0, Part 2, Part 3, Part 4
Any structure for whatsoever purpose and of whatsoever materials constructed and every part thereof whether used as human habitation or not and includes foundation, plinth, walls, floors, roofs, chimneys, plumbing and building services, fixed platforms, verandah, balcony, cornice or projection, part of a building or anything affixed thereto or any wall enclosing or intended to enclose any land or space and signs and outdoor display structures. Tents/Shamianahs, tarpaulin shelters, etc, erected for temporary and ceremonial occasions with the permission of the Authority shall not be considered as building.
* Definitions are different.
The vertical distance measured, in the case of flat roofs from the average level of the ground around and contiguous to the building or as decided by the Authority to the terrace of last livable floor of the building adjacent to the external walls; and in the case of pitched roofs, up to the point where the external surface of the outer wall intersects the finished surface of the sloping roof, and in the case of gables facing the road, the midpoint between the eaves level and the ridge. Architectural features serving no other function except that of decoration shall be excluded for the purpose of measuring heights.
Building Drain-Combined — Part 9/Section 2
Building Drain-Sanitary — Part 9/Section 2
Building Drain-Storm — Part 9/Section 2
Building Sewer — Part 9/Section 2
Building Sub-Drain — Part 9/Section 2
Building Trap — Part 9/Section 2
Building Energy Simulation (BES) — Part 8/Section 3
Building Environment — Part 11
Building Fabric — Part 12
Building Information Model (BIM) — Part 12
7
Building Integrated Renewable Energy — Part 8/Section 3
Building Line — Part 2, Part 3, Part 10/Section 2
The line up to which the plinth of a building adjoining a street or an extension of a street or on a future street may lawfully extend. It includes the lines prescribed, if any, in any scheme. The building line may change from time to time as decided by the Authority.
Building Maintenance — Part 12
Building Management System (BMS) — Part 8/
Section 3, Part 8/Section 6, Part 12
Building Performance — Part 11
Buildings Related Illnesses (BRI) — Part 8/Section 3
Built-up Section — Part 6/Section 6
Built Environment — Part 11
Bunched — Part 8/Section 2
Bundle-Column — Part 6/Section 3B
Buried Direct — Part 8/Section 2
Bus Bar — Part 8/Section 6
Busbar Trunking System — Part 8/Section 2
Business Buildings — Part 6/Section 1
Business Continuity Management (BCM) — Part 12
Buttress — Part 6/Section 4
Bypass Equipotential Bonding Conductor — Part 8/Section 2