Cabin — Part 3
Cable — Part 6/Section 5B, Part 8/Section 2
Cable, Circuit Integrity — Part 8/Section 2
Cable, Flame Retardant (FR) — Part 8/Section 2
Cable, Flame Retardant Low Smoke Halogen Free
(FR-LSH) — Part 8/Section 2
Cable, Flexible — Part 8/Section 2
Cable, Metal-Sheathed — Part 8/Section 2
Cable, PVC Sheathed-Insulated — Part 8/Section 2
Cable, Weatherproof — Part 8/Section 2
Cable, XLPE — Part 8/Section 2
Cable Armoured — Part 8/Section 2
Cable Bracket — Part 8/Section 2
Cable Channel — Part 8/Section 2
Cable Cleat — Part 8/Section 2
Cable Coupler — Part 8/Section 2
Cable Ducting — Part 8/Section 2
Cable Ladder — Part 8/Section 2
Cable Raceways — Part 8/Section 2
Cable Tray — Part 8/Section 2
Cable Trunking — Part 8/Section 2
Cable Tunnel — Part 8/Section 2
Call Indicator — Part 8/Section 5A
Camber — Part 6/Section 6
Candela (cd) — Part 8/Section 1
Canopy — Part 3
Canopy/Tree Canopy — Part 10/Section 1
Canopy Sign — Part 10/Section 2
Car Bodywork — Part 8/Section 5A
Car Door Electric Contact — Part 8/Section 5A
Car Frame — Part 8/Section 5A
Car Platform — Part 8/Section 5A
Car Switch Operation — Part 8/Section 5A
Carbon Emissions — Part 12
Carbon Footprint — Part 12
Cartridge Fuse Link — Part 8/Section 2
Carpet Area — Part 3
Ceiling Rose — Part 8/Section 2
Cell — Part 6/Section 3B
Part 6/Section 7B
Cellular Concrete — Part 6/Section 7A,
Cellulose — Part 6/Section 3B
Central Field — Part 8/Section 1
Centre Internode — Part 6/Section 3B
Centre of Rigidity — Part 6/Section 4
Centrifugal Fan — Part 8/Section 1
Cesspool — Part 9/Section 2
Chair — Part 9/Section 1
Chair Rail — Part 6/Section 8
Channel — Part 9/Section 1
Characteristic Load — Part 6/Section 3B, Part 6/
Section 5B, Part 6/Section 6
Characteristic Strength — Part 6/Section 3B, Part 6/
Section 5B
Characteristic Yield/Ultimate Stress — Part 6/Section 6
Check — Part 6/Section 3A
Chhajja — Part 3
Chimney — Part 3
Chowk or Courtyard — Part 3
Chowk, Inner — Part 3
Chowk, Outer — Part 3
Circuit — Part 8/Section 2
Circuit, Final Sub — Part 8/Section 2
Circuit Breaker — Part 8/Section 2
Circuit Breaker, Linked — Part 8/Section 2
Circuit Integrity Cable Support and Fixing
Materials — Part 8/Section 2
Circulation Path — Part 3
Circulation Space — Part 3
Clay — Part 6/Section 2
Clay, Firm — Part 6/Section 2
Clay, Soft — Part 6/Section 2
Clay, Stiff — Part 6/Section 2
Cleaning — Part 12
Cleaning Eye — Part 9/Section 2
Cleaning Services — Part 12
Clear — Part 3
Clear Design Sky — Part 8/Section 1
Clear Glass — Part 6/Section 8
Clear Waste Water- Part 9/Section 2
Clearance- Part 8/Section 5A
Cleat — Part 8/Section 2
Cleavability — Part 6/Section 3B
Climber (Creeper/Vine) — Part 10/Section 1
Closed Clusters — Part 3
Closed Sign — Part 10/Section 2
Closely-Spaced Modules — Part 6/Section 1
Cluster — Part 3
Cluster Court Town House — Part 3
Cluster Plot — Part 3
Coaxial Cable — Part 8/Section 6
Coincidence Factor — Part 8/Section 2
Collapse — Part 6/Section 3B
Collection — Part 9/Section 3
Collection Chamber — Part 9/Section 2
Colour Contrast — Part 3
Colour Rendering Index (CRI) — Part 8/Section 1
*Column — Part 6/Section 3B, Part 6/Section 6
Column or Strut — Part 6/Section 5B
Column — Part 6/Section 4
Columnar — Part 10/Section 1
Coefficient of Linear Expansion — Part 6/Section 8
Coefficient of Performance, Compressor, Heat
Pump — Part 8/Section 3
Coefficient of Performance, Compressor,
Refrigerating — Part 8/Section 3
Coefficient of Performance (Heat Pump) — Part 8/Section 3
Coefficient of Performance (Refrigerating) — Part 8/Section 3
Comb — Part 8/Section 5B
Comb Lighting — Part 8/Section 5B
Comb Plate — Part 8/Section 5B
Comb Plate Switch — Part 8/Section 5B
Comb Teeth — Part 8/Section 5B
Combination Sign- Part 10/Section 2
Combustible Material — Part 4, Part 6/Section 8, Part 10/Section 2
A material that, in the form in which it is used and under the conditions anticipated, will ignite and burn; a material that does not meet the definition of noncombustible or limited combustible.
Common Path of Travel — Part 4
Common Rafter — Part 6/Section 3B
Communication Pipe — Part 9/Section 1
Compact Section — Part 6/Section 6
Compact Substation or Prefabricated Substation — Part 8/Section 2
Competent Authority — Part 9/Section 4
Competent Maintenance Person — Part 8/Section 5A
Competent Person — Part 12
Component — Part 6/Section 7A, Part 6/Section 7B
Composite Members — Part 6/Section 7A, Part 6/Section 7B
Composite Station — Part 4
Composting — Part 9/Section 3
Compression Wood — Part 6/Section 3A
Computer Aided Facilities Management (CAFM) — Part 12
Computer Aided Maintenance Management System (CMMS) — Part 12
Concrete Grades — Part 6/Section 4
Concourse — Part 4
Condition Monitoring — Part 12
Conductor of a Cable or Core — Part 8/Section 2
Conductor, Aerial — Part 8/Section 2
Conductor, Bare — Part 8/Section 2
Conductor, Earthed — Part 8/Section 2
Conductor, Insulated — Part 8/Section 2
Conduit — Part 8/Section 2
Confined Space — Part 12
Connection — Part 9/Section 2
Connector — Part 8/Section 2
Connector Box or Joint Box — Part 8/Section 2
Connector for Portable Appliances — Part 8/Section 2
Consolidation Point (CP) — Part 8/Section 6
9
Constant Stress Range — Part 6/Section 6
Construction and Demolition Waste — Part 9/Section 3
Construction Equipment — Part 7
*Consumer — Part 9/Section 1, Part 9/Section 2
Consumer's Pipe- Part 9/Section 1
* Definitions are different.
Consumer's Terminals — Part 8/Section 2
Contaminants — Part 8/Section 1
Continuous Operating Voltage (Uc) — Part 8/Section 2
Contour — Part 10/Section 1
Contour Interval — Part 10/Section 1
Control — Part 8/Section 5A
Conversion — Part 2
Cooking Alcove — Part 3
Cooling Load — Part 8/Section 3
Cooling Tower — Part 8/Section 3
Cord, Flexible — Part 8/Section 2
Core of a Cable — Part 8/Section 2
Corrective Maintenance — Part 12
Correlated Colour Temperature (CCT) — Part 8/Section 1
Corridor — Part 6/Section 8
Corrosion — Part 6/Section 6
Counterweight — Part 8/Section 5A
Cover — Part 9/Section 1
Covered Area — Part 3, Part 4
Ground area covered by the building immediately above the plinth level. The area covered by the following in the open spaces is excluded from covered area (see Table 2 of Part 4 ‘Fire and Life Safety’ of the Code):
a) Garden, rockery, well and well structures, plant nursery, waterpool, swimming pool (if uncovered), platform round a tree, tank,
* Definitions are different.
fountain, bench, Chabutara with open top and unenclosed on sides by walls and the like;
b) Drainage culvert, conduit, catch–pit, gully pit, chamber, gutter and the like;
c) Compound wall, gate, unstoreyed porch and portico, slide, swing, uncovered staircases, ramp areas covered by Chhajja and the like; and
d) Watchman's booth, pumphouse, garbage shaft, electric cabin or sub-stations, and such other utility structures meant for the services of the building under consideration.
NOTE — For the purpose of this part, covered area equals the plot area minus the area due for open spaces in the plot.
Coupled Glazing (Secondary Glazing) — Part 6/Section 8
Crane Load — Part 6/Section 6
Creep — Part 6/Section 5B
Creep Coefficient — Part 6/Section 5B
Crime Prevention through Environmental Design
(CPTED) — Part 12
Critical Activities — Part 12
Critical Asset — Part 12
Critical Damping — Part 6/Section 1
Crookedness — Part 6/Section 3B
Cross Wall — Part 6/Section 3B
Cross-Connect — Part 8/Section 6
Cross-Connection — Part 9/Section 1
Cross-Sectional Area of Masonry Unit — Part 6/Section 4
Cross-Talk — Part 8/Section 4
Crown of Trap — Part 9/Section 2
Crumple Section — Part 6/Section 4
Crush Train Load — Part 4
'Cul-de-Sac' Cluster — Part 3
Cumulative Figure — Part 6/Section 6
Current Carrying Capacity of a Conductor — Part 8/Section 2
Current Using Equipment — Part 8/Section 2
Curtain Wall — Part 6/Section 4, Part 6/Section 8
Curvature — Part 6/Section 3B
Customer's/Consumer's Connection — Part 9/Section 4
Cut-Out — Part 8/Section 2
Cut-Off Level — Part 6/Section 2
Cut-Off Limit — Part 6/Section 6