| TYPE | FUNCTION |
|---|---|
| V1 | RoadsconnectingChandigarhwithothercitiesintheregion.TheMadhyaMargandDakshinMarg mergewiththe V1sleadingtoKalkaandAmbalarespectively. |
| V2 | The major avenues of Chandigarh, with important institutional and commercial buildings located on them. Madhya Marg, Dakshin Marg, Jan Marg, Himalaya Marg, Uttar Marg and Purv Marg are importantexamplesofthese. |
| V3 | Roads between sectors forfastmoving vehicular traffic. Each sector is surrounded either by a V2 orV3. |
| V4 | Shopping streetscuttingthroughsectorswithshopsontheirsouthernside. |
| V5 | Circulationroadswithinsectors. |
| V6 | Roadsprovidingaccesstohouses. |
| V7 | Foot paths through green belts enabling pedestrians to cross sectors without having to cross vehiculartrafficandcycletracks. |
| V8 | Cycletracksthroughgreenspaces BusesweretoplyonlyalongV2,V3and V4roads. Eachsectorwastohaveonlyfourentry points fromV3snodirectentrytohouseswaspermittedfromtheseroads. |

Present Status of Road Network
The 7V Circulation System has served the city well for decades. However the same is now under extreme pressure, both internal and external, which has begun to affect its efficiency.
The concept of the self contained neighbourhood intended to meet all the daily needs of the residents within walking distance without having to go outside the sector has not been fully successful ; freedom of choice for schools, shopping centres etc. outside the sectors results in inter sector movement of fast and slow vehicles across the city.
Further, Le Corbusier’s concept of the 7Vs has not been fully implemented.
Detailed planning of the road network/road sections of each category of road was done in great detail by the original team including road carriageways, pedestrian and cycle tracks, tree plantation, and street lighting. Phased development of the system was planned to enable the infrastructure to keep pace with the growth of the town. Refer Figure 4 and Figure 5.
Pedestrian pathways and cycle tracks not fully built
The V7s and V8s intended exclusively for the pedestrians and the cyclists respectively crossing road intersections by underpasses have not been implemented so far.
Figure 4 : Road sections 1st phase development

Figure 5 : Road sections 2nd phase development


土
The pathways that have been laid are poorly maintained and have trees, storm water drainage and other obstructions which compel pedestrians /cyclists to move on roads thereby defeating the very concept of dedicated space for them.
Underpasses to connect V4 shopping streets across V3s/V2s have also not been implemented. The built environment and the road junctions also do not permit such interconnectivity at this stage .
Four phased development of roundabouts has been carried out only upto the second phase. In most cases slip roads were built only recently. In some cases no space has been left for slip roads making them non feasible now.
DRAWING OF FOUR PHASED DEVELOPMENT OF ROUNDABOUTS

PEDESTRIAN SPACE ENCROACHED BY TREES, UTILITIES WHICH DEFEATS THE PURPOSE OF DEDICATED FOOTPATHS

POOR CONDITION OF ROADS AND CYCLE TRACKS

LANDSCAPED ROUNDABOUTS OF CHANDIGARH