Based on detailed studies, in depth analysis and looking at the future growth and development of the Chandigarh, Proposed Landuse Plan for the Chandigarh Union Territory has been evolved. While evolving this landuse plan, care has been taken to preserve the sectors which have already been planned and the landuses which have already been defined in the planning of the sectors.
Accordingly, no change is proposed in the landuse already defined in the sectors falling in Phase I, Phase II and Phase III with the exception of change of landuse from ‘Residential’ to ‘Institutional/Residential for institutions’ in sectors 50, 51, 52 and 53 in the land vacated from relocating slums. This change is proposed to meet the requirement of additional institutional area within the city.
The changes already made in the area falling in Phase I, II and III including the setting up of Rock Garden, Memory Park, Sports Complex in Sector I etc. have been made an integral part of the Landuse Plan.
13.2Existing Landuse Plan
Landuse for the city of Chandigarh was defined by the Plan prepared by Le Corbusier. Based on the CIAM (Congress International de Architecture Modern) principles of the Functional City which focused on segregation of four major functions i.e. Living (the residential sectors), Working (the Capitol Complex, commercial/institutional buildings along Madhya Marg, Jan Marg, City Centre), Care of Body and Spirit (the Leisure Valley, open spaces and sector greens) and Circulation (the network of roads, the 7Vs).
The total area proposed to be covered in the Master Plan is the entire area of 28169.61 acres comprising of Chandigarh Union Territory .The area includes both the area falling under the Phase I ,Phase II and Phase III sectors besides the area under the periphery. Considering the pattern of development followed in Chandigarh, the Existing Landuse Plan is being detailed out in two parts. Part I comprises of planned development included in the original plan (Phase I & II) and the subsequent developments made as part of the extended sectoral grid (Phase III ). The remaining landuse of the area falling in the periphery is being detailed out separately keeping in view the nature and context of development.
In Phase I and II, out of the 46 sectors in the sectoral grid falling within the first and the second phase of the original plan, 39 sectors are Residential whereas the remaining seven sectors namely sectors I, I2, I4, I7, 26(part), 34(Part), 43(part) are predominantly Institutional and Commercial housing the Capitol Complex, PGI/PEC, Panjab University, City Centre and Sub City Centres respectively. The Industrial Area, the Sukhna Lake, and Golf Range/Club have also been considered as part of the sectoral grid of Phase I and II. Phase III sectors (remaining parts of sectors 48 to 56, 61 and 63) falling in Chandigarh UT have been earmarked as Residential sectors. These sectors also include the belts reserved as Commercial/ Institutional along the Vikas Marg now proposed for mix landuse.
The details of areas falling under different phases and periphery are as under:
CATEGORY
SECTORS
AREA in (acres)
PERCENTAGE
Phase I
1 TO 30 *
9398.83
33.37
Phase II
31 TO 47**
5158.76
18.31
Phase III
48 TO 56 (PART)
1870.54
6.64
TOTAL
16427.73
58.32
Remaining area of periphery
11741.88
41.68
Grand total
28170.00
- Includes the area of Industrial Area Phase I, Sukhna Lake, Golf Range.
- Includes the area under Industrial Phase II .
Out of the total area covered by the Master Plan, 58.32 % (16428.13 acres) falls under the area covered by the planned development whereas remaining area of 41.68% (11741.88 acre) falls in the periphery. Within the area falling under the planned sectors, Phase I has largest area comprising of 1/3rd of the area of the Master Plan whereas Phase II and Phase III has 1/4th of the total area of the Master Plan and remaining area falls in the periphery.
The area in the periphery comprising village abadis, agricultural land and the area where planned and unplanned development has taken place works out to be 11741.87 acres. As explained above, the existing landuse analysis has been carried out in two parts i.e. Area falling within the Sectoral Grid (Phase i, II & III) and Area outside the Sectoral Grid (Periphery).
13.3 EXISTING LANDUSE
Area falling within the Sectoral Grid (Phase I, II and III)
The existing landuse has been analysed in terms of different components i.e. Residential, Commercial, Traffic & Transportation, Industries, Public / Semi Public etc. Refer Table I, II & III. Looking at the above tables in Phase I, largest proportion of land has been allocated to the Residential component (42.69%) whereas Public and Semi Public have approximately same kind of area. The area under the Commercial component is placed at 4.73% whereas Traffic and Transportation occupies around 8% of the Total Area of Phase I. The above proportions of the areas have been worked out based on taking the entire area of residential sectors as the residential component. If the residential component is further detailed out, the proportions under residential will go down, whereas area under commercial, traffic, public and semi public, recreational shall accordingly go up. The detailed Landuse of Sectors falling in Phase I has been given in Annexure I. Each sector has a different pattern of Landuse as detailed out in the Table.
In case of Phase II, the proportion of Residential component is much higher i.e. 67.08 %, similarly, Commercial component is also higher than Phase I. The variation in landuse in this phase is due to the fact that Phase I was planned as low density sectors whereas the Phase II sectors were proposed to house larger population and were planned as high density neighbourhoods with smaller sized plots and ground coverage. As stated above, if the analysis of the sectors is carried out for different landuses, the proportion of Residential component will go down whereas the remaining component will go higher. The details of Landuse of Individual Sectors falling in Phase II is given in Annexure II. Considering the fact that Phase III development is largely guided by group housing, excluding the planning of individual plots, the proportion of Residential component has been found to be much higher. Residential area occupies (3)/(4) of the total area of Phase III. however, the area calculations is again based on taking the sectors as residential landuse without going into the details of various components included in the sector planning. Accordingly, the area under different uses will get rationalised once that analysis is included in different land uses. The detail Landuse of individual sectors falling in Phase III is given in Annexure III.
Landuse Within Remaining Area of UT Periphery
A perusal of the periphery area in the UT indicates that large chunks of land in the periphery have already been acquired for accommodating new land uses.
While developing area in the periphery, the existing road network with few upgradations has been used as the basis for providing accessibility to the pockets and developing these areas without a comprehensive road network. The landuse analysis of the existing development has been carried out for the area falling in the periphery and is detailed in Table IV & V
Out of the Total Area of 11741.88 acres, Residential component covers approx. 1/6th of the total areas. Commercial component accounts for 2.736%, Traffic and Transportation 5%, Industries 4.5%. In addition, area under Defense Use is placed at 13.4% which is close to the Residential component. Other Uses in the periphery area include Public /Semi Public, Recreational and Public Utilities. 19% of the Total Periphery Area is under Forest whereas the Agricultural component accounts for 21.67%.
13.5Proposed Landuse Within Remaining Area of Periphery
As already explained above, the landuse already defined in the sectors falling within the sectoral grid is proposed to be kept within the existing defined frame work of planning and development. However, considering the decisions already taken by the Administration and in order to meet the future requirements of the city in terms of Rehabilitation of Slums, Amenities, Institutions, Para Military Forces, Defense, Warehousing, Transportation, Bulk Material Market etc. the area available in the Periphery is proposed to be planned and developed to meet these requirements. While defining the future growth and development, care has been taken to integrate these areas with the existing frame work of urban development in order to ensure that the total development falls within well defined framework based on the principle of integration. Accordingly, the Road Network within the periphery has been redefined and integrated with the existing system of traffic and transportation of the city in order to ensure smooth flow and rationalise the traffic within the entire area falling under the Union Territory. Further in order to improve the environs and safeguard the identity of the city, a Green Belt is proposed to be created wherever feasible and desirable. Forest Cover is further proposed to be increased by bringing more area under afforestation in the shape of developing a Wild Life Corridor for linking the Sukhna Wild Life Sanctuary with the Sukhna Lake Forest besides promoting afforestation/green along the Sukhna Choe and Patiali Ki Rao which are proposed as Eco Sensitive Areas.
The proposed development in the periphery has been defined in 17 distinct pockets having a total area of 2987.92 acres and the broad landuse for each pocket has been defined. However, each pocket would require to be planned after detailed studies and analysis with appropriate development controls defined to regulate the development within these pockets. Each pocket has been detailed separately in terms of its landuse, traffic and transportation etc. keeping in view its location, environs and its context with the city and development in the neighbouring towns.
An area to the tune of 673.86 acres has been kept for Agriculture in order to make sure that entire periphery is not subjected to urbanisation and to ensure that no urbanisation is permitted on the North of the Capitol Complex based on the Edict of Chandigarh.
The proposed landuse plan for the area falling in the periphery is given in Plan 6.
As already explained that area falling outside Phase I, II and III have been divided into 17 distinct pockets as shown in the Proposed Landuse Plan. Detailed planning and Development Proposals including their Landuse have been worked out and are detailed below:
PLAN 6 PERSPECTIVE PLAN OF CHANDIGARH
Pocket 1 (Refer Table VII)
This pocket measuring approximately 353.46 acres is located on the North West of the city along the Chandigarh-Mullanpur Road near the Interstate Boundary with Punjab. This forms the un-acquired part of the Sarangpur Institutional Area. Only 434 acres of this site has been acquired so far of which some has been allotted/developed for setting up of the Indian Reserve Battalion and the Chandigarh Armed Police and some for Educational Sites and Service Stations etc.
From the perspective of the Chandigarh Master Plan 2031 as a whole, given the fait accompli of land acquisition, infrastructure development and allotment of land to some educational institutions in the Sarangpur Area, the area must be maintained as an Institutional Area. The sites which have already been allotted shall be used for the approved purposes.
The remaining acquired land or to be acquired land in the Sarangpur Institutional Area will be primarily used for the Panjab University and the PGI (in addition to the land designated as institutional/residential for institutions in southern sectors) (Sector 50, 51, 52 and 53 etc. that is land vacated from relocating slums) being the institutes of eminence. Some land may be used for other institutional purposes as may be decided by the Administration.
For development of the Film City, land can be provided in the unacquired portion of Sarangpur Institutional Area (Pocket 1).
• Development parameters for Pocket 1
The area shall be developed as Institutional Area with low density and low rise buildings in view of the natural scenic beauty of the area with the backdrop of the Shivalik Hills. Along the U.T./Punjab boundary 30 mtrs. wide plantation shall be undertaken within the U.T. to segregate the area from the land uses on the Punjab side.
POCKET I
Chapter 13Land Use
13.1 Introduction
The original Plan of Chandigarh was prepared six decades ago to meet the requirements of the Administrative City for a population of five lakhs. The 70 sq.km area acquired for the development of the first two phases (Sectors 1 to 47) of Chandigarh had clearly defined land use zones based on the CIAM principles of Living, Working, Care of Body and Spirit and Circulation planned within the modulor sectoral grid.
The residential sectors are based on the concept of self sufficient neighbourhoods each having schools, shops for daily needs, community centres and neighbourhood parks.
City and the Periphery
Chandigarh was planned as a stand alone city surrounded by a controlled rural belt around it to nourish it. Although, the city has largely developed as per the original plan and its clearly defined land uses, the controlled periphery even within the UT of Chandigarh has been completely transformed due to re-organisation, majority of the area of the periphery has gone to the state of Punjab (73%), State of Haryana has 24% of the area of the periphery whereas remaining 3% is with the Chandigarh. Accordingly, the area available under periphery with the Chandigarh has been reduced considerably in the post 1966 re-organisation. Over a period of time, large number of developments have been taken up in the periphery, these developments are both of planned and unplanned nature. With these developments, the city has been extended towards the East, South and West to accommodate new requirements without any comprehensive plan. New residential, institutional and other uses have been added both within and outside the sectoral grid. The establishment of the IT park, rehabilitation colonies for unauthorized settlements, Sarangpur Institutional area, Botanical Garden, Milkmen Colony-Dhanas, Dumping Ground for solid waste etc towards the east and west has entailed overstepping of the natural boundaries of the Patiali Ki Rao and the Sukhna Choe.
Considering the development already taken up within the area comprising of the periphery, the same is now proposed to be included as part of the Chandigarh Master Plan 2031 with the exception of the unauthorized constructions raised in violation of Periphery Act. Thus the present landuse plan will define the area covered under Phase I (Sector 1 to 30), Phase-II (Sector 31 to 47) and Phase-III (Sector 48 to 56) besides the area of the periphery.
Expansion of the City beyond the original plan to accommodate additional landuses
Detailed stocktaking of the existing situation within UT's periphery indicates that developments beyond the planned sectoral grid have been irregular dictated more by the availability of land for acquisition and the existing link roads rather than any planning framework. The neighbourhood concept of the city's sectoral grid is conspicuous by its absence in the periphery area.
Chandigarh Villages
The site selected for setting up capital city of Chandigarh included number of villages and their settlements. Different strategies were adopted with regard to villages while evolving the Plan of Chandigarh. For the first phase sectors I to 30, it was decided that all the villages falling within the sectoral grid shall be acquired including the abadi area and the villages will be rehabilitated at an appropriate location. Accordingly all the villages were removed and the villagers were rehabilitated in the Pipliwala and Mariwala rehabilitation colonies which were developed adjacent to Manimajra and within the periphery control area. With regard to four villages falling within the sectoral grid of Phase-II, the agricultural land was acquired but the abadi area were left intact. Accordingly, the abadi of 4 villages Attawa, Butrela and Badheri were adjusted within Sector 42 and Burail in Sector 45 as part of the sector planning.
Two villages namely Kajheri and Palsora which form part of the Phase-III sectors are also proposed to be made integral part of sector planning without acquiring the area under abadi/ Lal Dora except the area under unauthorized/ unregulated constructions raised in violation of the Periphery Act.
The Abadi areas of villages which were adjusted within the sectoral grid of the second and third phase and those in the periphery, have undergone tremendous change from pure residential areas to serving as backend centers for the city's commercial areas lacking in warehousing facilities, providing dormitory accommodation to migrants and the lower income strata unable to afford the high rentals within the main city. Guest houses and godowns are other land uses which have come up within and around the villages.
Existing Development Pattern
Despite Chandigarh being a planned city, it has not been able to avoid un-planned developments. Due to non-provision of low cost housing and services for labour in the original plan, unauthorized settlements have surfaced which are being rehabilitated partly within the sectoral grid but mostly in the peripheral areas. Similarly, informal commercial sector has emerged in a big way since even the booths which are the smallest category of commercial establishments were unaffordable by the migrants/service sector. The Chandigarh Administration planned day care markets and rehri markets adjoining the neighbourhood commercial centres to meet the needs of informal commercial sector. Over a period of time, different areas of the city have also been allotted on temporary basis to meet exigencies /or address the new requirements till such time proper arrangements for the same are made.
POCKET 5 (Refer Table VII)
This pocket of 258.062 acres has the Chandigarh Armed Police Housing Complex in its centre. The Landuse of this area shall be institutional with low density and low rise buildings to maintain a green ambience in the periphery. A site for dumping ground has also been proposed in this area.
To protect the Patiali-ki-Rao and the neighbouring area from pollution, the dumping site shall be surrounded by a green buffer on all sides. . A 60 ft. wide road branching off from the existing road running along Patiali-ki-Rao is proposed to provide direct access to the dumping ground.
POCKET 5
POCKET 5
Since the site proposed for the dumping ground is not an ideal site in view of its nearness to developed areas and closeness to the Patiali-ki-Rao, and in the absence of an appropriate alternative, the Chandigarh Administrative has requested the Punjab Government to provide alternative land within the state
POCKET NO.6
POCKET 6 (Refer Table VII)
This pocket measures 92.47 acres and falls in Sector-38(W) opposite CTU Workshop and adjoins the Veterinary Hospital.
POCKET 2 (Refer Table VII)
29.663 acres of agricultural land to the north of the Sarangpur Village has direct access from Chandigarh Mullanpur Road via PGI and via Dakshin Marg. This pocket is reserved for future expansion of the village and for essential community facilities for residents.
Unauthorized marble trade which has sprung in the area shall be relocated in the area proposed for Warehousing in village Daria and in the New Bulk Material Area proposed adjoining Pocket 8 south of the Wholesale Grain, Fruit and Vegetable Market, Sector 39. This would facilitate the construction activity of proposed projects concentrated in Maloya and the third phase sectors.
A Green Belt of 30 mts. width along the Chandigarh-Mullanpur Road extending towards the Botanical Garden shall be developed to enhance the entry to the city from the Punjab side.
No building shall be permitted to have direct access from the Chandigarh –Mullanpur Road.
POCKET 3 (Refer Table VII)
This pocket of 68.235 acres is located next to the entry to the UT from Mullanpur, abutting the interstate boundary with Punjab. The Landuse of this pocket shall be reserved for future unforeseen requirements of the UT. A green belt 30 mts. wide shall be developed/provided along the Dhanas road and the interstate boundary.
POCKET 4 (Refer Table VII)
This pocket of 32.824 acres falls along the extension of Dakshin Marg and adjoins Village Dhanas. It is reserved for low density residential use and the future requirements of Dhanas village. A Comprehensive Development Plan integrating existing development of the village with the proposed extension shall be prepared which shall address the gaps in social and physical infrastructure and open spaces etc.
POCKET 4
Landuse –
• In view of the existing rehabilitation colony, this pocket is proposed to be developed for middle income, high density group housing.
- The area across the proposed road (from extension of Dakshin Marg upto sector dividing road of 38 West) is proposed to be utilized for commercial activities including a marriage palace.
- To provide better accessibility and to segregate the residential area it is proposed to extend the road dividing Pocket A & B of 38-West to meet extension of Dakshin Marg. A pocket along extension of Dakshin Marg has been proposed as Institutional in continuity with the existing Institutional Area on Dakshin Marg.
Note: The ancillary social infrastructure including community centers recreational & educational health institutions and local level shopping facilities shall be provided as per Neighbourhood Concept and sites for social and physical infrastructure of the town.
Pocket 7 (Refer Table VII)
Measuring 166.322 acres, this pocket surrounds Village Maloya and the Rehabilitation Colony Maloya and abuts the Interstate Boundary with Punjab. The site for a Second Grain Market adjoins this pocket.
The proposed Landuse for the rest of the land is Residential. Besides augmenting the housing stock for rehabilitation, the physical and social infrastructure of Dadu Majra and Maloya villages will also be augmented.
A Comprehensive Plan for the area around the villages needs to be prepared after conducting detailed surveys and analysis. Chandigarh Administration has already acquired 162 acres for the Rehabilitation Scheme Maloya-I adjoining the inter-state boundary and another 66 acre for the Rehabilitation Scheme Maloya-II. The planning of the two schemes is at an advanced stage and its execution is to be undertaken by the Chandigarh Housing Board. Since most of this pocket is already committed for the above rehabilitation schemes, Residential Use is proposed as the landuse for the remaining scattered patches.
With a view to provide better connectivity to the proposed large high density residential development it is proposed to extend the Vikas Marg and road cutting across Maloya-I to complete the loop. The matter will need to be taken up with the Municipal Corporation for proper alignment.
Allied infrastructure such as bus stands need to be integrated. While the new areas to be developed will have commensurate social infrastructure, the deficit in facilities in the existing villages and colonies needs to be made up.
In keeping with the concept of a continuous green belt defining the UT's boundary, this pocket shall have a 30m wide Green Belt along the Interstate Boundary. That will also deal with the objection of the Punjab Government towards the Economically Weaker Sections (EWS) housing and rehabilitation colonies being located next to the Interstate Boundary.
POCKET 7
POCKET 8 (Refer Table VII)
Measuring 320 acres ,this pocket lies to the west of Sector-56 and abuts the Interstate Boundary with Punjab.
Land use –
• 45 acres for a Transport Area to be developed by Chandigarh Administration or its undertakings.
- The Municipal Corporation's proposal for a Sewerage Treatment Plant for the developments in the western periphery, across Patiali-ki-Rao has also been incorporated in the planned land use. While carrying out detailed planning of the area it shall be ensured that a sufficient green buffer shall be provided along the boundaries of the site.
• Gawala/Kumhars Colony is already existing near the interstate boundary which shall be retained.
- With a view to provide better connectivity to the proposed large high density residential development, a 100 feet wide road has been proposed between Vikas Marg via Maloya Rehabilitation Colony and existing road along Patiali ki Rao Choe, which is also to be strengthened upto Madhya Marg to serve as an alternative link/bypass for the traffic coming from the western periphery.
• The remaining area of the 320 acres has been proposed as reserved for future requirements.
- Apart from the above, the Bulk Material Market, Warehousing and Transport Area has been proposed abutting the V3 road leading to Mohali.
- The site measuring 74.55 acres for the Second Grain, Fruit And Vegetable Market is also earmarked across the road adjoining the Water Works. The infrastructure of roads, sewerage, water supply, electricity along with an auction platform has already been developed at site.
POCKET 8
13.5.9Pocket 9 & 10
Measuring 187.471 acres this pocket lies opposite Sector 48 adjoining the railway line and the airport. Since this area has no linkage with the main city combined with the restrictions on landuse due to proximity to the Defense Land, it is proposed to retain this area as a Green/Open. Embankment of the railway track on the east of Sector 47 and Sector 48 shall be suitably landscaped to protect it from erosion.
POCKET NO.9
POCKET NO.11
POCKET 10 (Refer Table VII)
This pocket also abuts the Airport Area and the interstate boundary with the state of Punjab. The pocket has no independent approach.
The land use for this pocket has also been proposed as green/open space and shall be developed subject to air funnel/ defence restrictions and confirmation of the interstate boundary and area by revenue authorities. However, on reconfirmation of boundaries, it has been confirmed by the revenue authorities that this is not a separate pocket and its area is part of Pocket 9.
POCKET 11 (Refer Table VII)
Measuring 66.25 acres this pockets lies along the Chandigarh-Ambala stretch of NH-21, surrounding Raipur Khurd village.
Since this pocket falls at the entry to the city, the permitted landuse is green/open space with uses like agriculture, natural farming with promotion of local agro bio-diversity/indigenous crops, horticulture, orchards, plant nursery, green houses, floriculture, dairy farm, fishery, poultry, etc. subject to obtaining prior approval from the competent authority of Chandigarh Administration.
Large scale unauthorized and hazardous development which have taken place in the pocket needs to be strictly controlled /and checked. A comprehensive development plan for Riapur Khurd village and the developments outside it shall be prepared after conducting and analyzing ground surveys. The development regulations of the villages shall also be strictly enforced.
The extended Abadi should remain away from the main road as well as the Sukhna Choe.
No effluent discharge/pollution of the Sukhna Choe is to be permitted and the area notified as an Eco-Sensitive Zone.
POCKET NO.12
POCKET 13 (Refer Table VII)
• Measuring 160.06 acres this pocket lies in the close vicinity of the railway station and Village Daria
- Landuse -Due to its proximity to the railway station the land use of this pocket shall be Commercial and Warehousing. Having a warehousing zone adjacent to the railway station is desirable from economic and functional point of view which is evident from the large number of warehouses already existing in the area. Many residential buildings within the abadi deh of Village Daria have been converted into warehouses/godowns. A large number of un-authorized godowns have also come up around the village.
Approximately 97.06 acres of land has been allocated for Warehousing and another 45 acres are proposed for the Transport Area. About 18 acres is proposed for Green.
POCKET 13
At present about 300 companies are operating their transport business from different part of Chandigarh i.e. Transport Area, Timber Market, Industrial Area, Manimajra, Motor Market and Daria. The present Transport area has only 28 plots where other transport companies have rented space for operating their business. No plots have been carved out since 1966 when the transport area was set up.
The Chandigarh Transport Association has demanded that an ultra modern transport complex catering for 2000 trucks on 75 acres of land with facilities for workers and labour is required for loading and unloading of goods etc.
Therefore, another pocket of 45 acres are being proposed for Transport Nagar and as brought out earlier another Transport Area is also being planned close to the Grain Market and the Bulk Market in the new Sector-56 West carved out on the western end of the city.
The matter was further deliberated in 75 th Master Plan Committee meeting held on 22.08.2012 wherein it was felt that the facilities like transport etc. are the basic requirements for the Bulk Material Market, Grain Market or other markets which are serving the region. It was also discussed that the present site of transport area should not be shifted as the same is required due to its proximity to Railway Station, Timber Market, Second Grain Fruit and Vegetable Market. However, additional sites can be proposed which should be preferably near the Industrial Area/Bulk Material Markets.
POCKET NO.14
POCKET NO.15
POCKET NO.15
POCKET 14 (Refer Table VII)
This pocket of 56.14 acres abuts the Chandigarh-Kalka Road and lies along the 200 ft. wide road leading to the Rajiv Gandhi Chandigarh Technology Park.
Landuse --The landuse of the said pocket has been proposed as Public/Semi Public/Institutional. The pocket can be used for augmenting the health infrastructure for the area in and around the area of Manimajra, village Mauli Jagran and rehabilitation colonies etc. which presently lack in adequate city level health facilities.
POCKET 16 (Refer Table VII)
• Measuring 450 acres this pocket lies in Kaimbwala Village in the north-eastern part of the city adjoining the inter-state boundary with Punjab and on the upper end of the Sukhna Lake. This area is important from the urban design perspective and the Edict of Chandigarh which recommends a no construction zone north of the Capitol Complex. It is also close to the Sukhna Wildlife Sanctuary and falls within the proposed eco-sensitive zone. The area has a mild hilly terrain below the Shivalik Hills forming the natural backdrop of Chandigarh.
• The area is also a part of the catchment area of Sukhna Lake.
- Chandigarh Forest Department plans to acquire this land to create a Wildlife Corridor linking the Sukhna Wildlife Sanctuary with the Lake Reserve Forest.
- To ensure that the development activities are in sync with the environmental considerations of the Sukhna Wildlife Sanctuary, and the urban design of the city, the Kaimbwala Village is proposed as an eco-sensitive village with specific regulations which will be more stringent than the rules applicable to other villages of Chandigarh plan of which has been prepared by the Chandigarh Administration. The basic aim and objective of establishment of Wildlife Corridor is as follows:-
• To provide connectivity of Sukhna Wild Life Sanctuary and Lake Reserve Forest so that animals from Lake Reserve Forest can move freely to Sukhna Wild Life Sanctuary and vice – versa. At present, the Lake Reserve Forest is separated by Sukhna Wild Life Sanctuary by roads and agricultural lands.
- The Lake Reserve Forest area is prone to fire hazards especially in summer, due to which wild animals like Sambhar stray into the city area and also onto the roads. In case the Wildlife Corridor is established, the wild animals can in case of such fire hazards and other such emergencies. move into Sukhna Wild Life Sanctuary area
POCKET . 17 (Refer Table VII)
- This Pocket of 296.66 acres is located at the foothills of the Shivalik Hills to the north of the city and is bound by the interstate boundary with Punjab. The site is has a semi-hilly terrain. Village Khuda Alisher falls in the Pocket.
- Like Pocket 16, this pocket is also close to the Sukhna Wild Life Sanctuary and a small part of it falls within the catchment area of the Sukhna Lake.
- The area is also very important from the urban design perspective for preserving the Shivalik Hills as the natural backdrop of the city. Moreover, the Hon'ble High Court of the Punjab and Haryana has ordered a complete ban on construction activity in the area.
- The landuse of the pocket has been proposed as Green/Open Spaces with uses like agriculture, natural farming with promotion of local agro bio-diversity/indigenous crops, horticulture, orchards, plant nursery, green houses, floriculture, dairy farm, fishery, poultry, etc. subject to obtaining prior approval from the competent authority of Chandigarh Administration and fulfillment of stipulations for the proposed Eco-Sensitive Zone around the Wild Life Sanctuary.
To ensure that the development activities are in sync with the environmental considerations of the Sukhna Wildlife Sanctuary, and the urban design of the city, the Kaimbwala Village is proposed as an eco-sensitive village with specific regulations which will be more stringent than the rules applicable to other villages of Chandigarh plan of which has been prepared by the Chandigarh Administration.
No construction activity can however be permitted due to the ban on the construction activity in the area.
• Areas on the North of the Capitol Complex falling in the States of Punjab and Haryana
The North of the Capitol Complex is highly sensitive area from the environmental and urban design considerations of the city of Chandigarh. Though the area does not fall within the jurisdiction of Chandigarh and as such the Chandigarh Administration has no statutory mechanism by way of which it can restrict any development in the neighbouring states. However in view of the importance of safeguarding the interest of the city, the matter has been taken up with the coordination committee and in the inter-state meetings to ensure that the developments being carried out/proposed as
POCKET 17
per the Development Plan, Nayagaon. Shree Mata Mansa Devi Complex adjoining the Sukhna Lake do not in any way mar the inherent characteristic of the town and its original concepts. The state Governments have appreciated the concerns of the Chandigarh Administration and have assured to make necessary amendments in the development controls so that no high rise construction comes up in the area. The Government of India has also taken serious note of the same and while approving the report of the Expert Heritage Committee has recommended that the matter should be addressed through an interstate regional plan.
The detailed recommendations have been highlighted in Chapter-20 on Chandigarh's Heritage.
Table Vi-showing Land Use in Proposed Prockets
Sr. No.
Pockets
Proposed zones
Location
Area (in Acres)
Land use
Remarks
1.
1.
Sarangpur
353.46
Institutional
Phase-ii of Sarnagpur institutional Area
2.
2.
Near Sarangpur Villages
29.663
Residential
Expansion of Sarangpur Village
3.
3.
Across Sarangpur Village
68.235
Reserved
Land for future use.
4.
4.
Near Dhanas Village
32.824
Residential
Expansion of Dhanas Village
5.
5.
Opposite Milkman Colony Dhanas
258.062
Institutional
-
5. (I)
5. (a)
Opposite milkmen colony Dhanas
-
Public utilities
Dumping Ground.
6.
6.
Above West of Sector 38
92.47
Commercial
Marriage Palaces and other commercial activities
7.
7.
Maloya
166.322
Residential
Rehabilitation of slum-dwellers and general housing.
8.
8.
Maloya
320
Reserved
Land for future use
9.
9.
Behind Defence area
187.47
Green
Green Buffer
10.
10.
-
0
-
The area of this site is part of pocket 9 as per latest confirmation by revenue department.
11.
11.
Along Chandigarh Ambala Road
66.25
Green/Open Spaces
Agriculture, natural farming with promotion of local agro bio-diversity/indigenous crops, garden centres, horticulture, orchards, plant nursery, green house related to nursery, floriculture, livestock rearing/diary form, sericulture, fishery, poultry, bee keeping.
12.
12.
Between route No.2 & U.T.Boundary
123.477
Green/Open Spaces
Agriculture, natural farming with promotion of local agro bio-diversity/indigenous crops, garden centres, horticulture, orchards, plant nursery, green house related to nursery, floriculture, livestock rearing/diary form, sericulture, fishery, poultry, bee keeping.
13.
13.
Abutting route No.2
160.06
Commercial
Ware housing.
14.
14.
Abutting Chd.-Kalka road
56.14
Institutional
Low density and low rise building.
15.
15.
Area between I.T. park Ph-II & route No.III leading to Manimajra
327.48
Industrial (I.T. & I.T.E.S.)
Low density and low rise building.
16.
16.
Behing lake, surrounding area of Village Kaimbwala.
450
Forest
To acquire for wildlife corridor
17.
17.
Behind Rajindra Park surrounding area of Village Khuda Ali Sher
296.66
Geen/Open spaces
Agriculture, natural farming with promotion of local agro bio-diversity/indigenous crops, garden centres, horticulture, orchards, plant nursery, green house related to nursery, floriculture, livestock rearing/diary form, sericulture, fishery, poultry, bee keeping.
Total
2987.92
Table VII -LAND USE OF 17 POCKETS IN MASTER PLAN
S.No.
Pocket No.
Area of Pocket (in acres)
Residential
Commercial
Traffic & Transportation
Industrial / IT Park
Public/ Semi Public
recreational
Agriculture
Public Utilities
Forest
Reserved
1
1
353.46
251.72
101.74
2
2
29.663
20.893
8.74
3
3
68.235
21.96
46.275
4
4
32.824
26.2
6
5
5
258.062
132.122
86.86
39.08
6
6
92.47
26.5
44.4
6.57
15
7
7
166.322
121.102
45.22
8
8
320
57.44
262.56
9
9
187.471
187.471
10
10
0
0
11
11
66.25
66.25
12
12
123.477
123.477
13
13
160.06
97.06
45
18
14
14
56.14
56.14
15
15
327.48
283.56
43.92
16
16
450
DISTRIBUTION OF LANDUSES IN CHANDIGARH
EXISTING (Area in acres)
S. No.
Sector
Total Area (in acres)
Residential
Comm.
Transport
Indl./IT Park
Pub/Semi Pub
Recreational
agriculture
Public Utilities
Railway land
Defence
Forest
Reserved
Vacant land
1
Phase-I, Sector 1 to 30, Sec 26E, Indl. Area-I, Sukhna Lake, Golf Range/Club.
9398.83
4012.7
444.49
747.95
516.74
1812.92
1850.33
-
13.7
-
-
2
Phase-II, Sector 31 to 47, West of Sec 38, Indl. Area-II
5158.76
3460.26
433.52
514.23
272.08
372.18
72.19
-
34.3
-
-
-
3
Phase-III, Sector 48 to 56 and part of 61 and 63
1870.54
1371.31
140.51
161.66
-
92.41
81.28
-
23.37
-
-
-
4
Periphery
11741.87
1827.89
321.21
622.26
537.68
691.28
424.67
230.96
316.29
1573.00
**2113.97
*3082.67
5
Total
28170
10672.16
1339.73
2046.10
1326.50
2968.79
2428.47
-
302.33
316.29
1573.00
2113.97
3082.67
6
Percentage
100
37.88
4.76
7.26
4.71
10.54
8.62
-
1.07
1.12
4.52
7.50
10.94
* 3082.67 acres of vacant land includes 40.10 acres acquired land in shahpur, 56.14 acres in manimajra. ** Out of 2113.97 acres of forest land, 1888.24 acres has been intimated by forest deptt. and rest of the 225.73 acres of land has been scaled out from the guide map of chandigarh which is the part of the sukhna wildlife sanctuary within the boundary of chandigarh. The area of forest in pocket no 16 has been revised from 430.088 acres to 450 acres as per information given by Deptt. of forest and Wild life, U.T., Chandigarh Vide memo o FOR/14/639, dated 06-06-2014. The area of 113.98 acres of land in 7 pockets which are unacquired & supplied by theoffice of Deputy Commissioner, UT., Chandigarh at latter stage. The total area of the 17 pockets area 2987.92 acres.
PLAN 3 EXISTING LAND USE
土
Detail of Land Use
RESIDENTIAL URBAN VILLAGES VILLAGES IN PERIPHERY
COMMERCIAL WHOLESALE
INDUSTRIAL I.T. PARK
PUBLIC/ SEMI PUBLIC INSTITUTIONAL EDUCATIONAL HEALTH FACILITIES SPORTS FACILITIES CREMATION GROUND CULTURAL FACILITIES PUBLIC UTILITES
GREEN / OPEN SPACES ORGANISED OPEN SPA FOREST AGRICULTURE
TRAFFIC AND TRANSPORTATION TRANSPORTATION NODES ROADS RAILWAY LINE
WATER BODIES
PLAN 5 ACQUISITION PLAN OF CHANDIGARH
土
DEPARTMENT OF URBAN PLANNING CHANDIGARH ADMN.
STATUS OF LAND
DETAIL OF LAND
ACQUIRED LAND
UN-ACQUIRED AREA
LAND UNDER ACQUISITION PROCESS
EXEMPTED LAND
PLAN 6 PERSPECTIVE PLAN OF CHANDIGARH
6. HOUSING IN CHANDIGARH
土
Provision of good quality housing was central to Chandigarh’s planning objective of offering “all amenities to the poorest of the poor to lead a dignified life”. Initially, two main categories of housing were planned in the city - public and private. Subsidized rental public housing for government employees of all categories was built by the government in the early years. In the case of private housing, residential plots varying in size from 125 sq. yds. to 4000 sq. yds. were made available at cost price to individual buyers for building their own houses.
6.1Government Housing
Government housing in the city was initially divided into 13 categories ranging from house for the Chief Minister to the lowest paid class-IV employee. In addition hostels and flats for members of the Legislature were also planned. Plot sizes for government housing ranged from 37.5 sq. yds. to 4000 sq. yds. Most government houses in Phase I were single or double storeyed. Housing in Phase II has much higher density with the largest plot size restricted to 1000 sq. yd. and a large part of it consisting of four storeyed flats. In addition, 800 ‘cheap houses’ were built for poorer non-government workers - the tonga driver, laundrymen, sweepers, and cobblers and later sold to them at nominal prices. Most government houses in the first phase were designed by the expatriate team of architects – Pierre Jeanneret, Maxwell Fry and Jane Drew assisted by a team of young Indian architects. A lot of attention was given to making their design suitable for local climate within severe economic constraints while using local building materials. A plan showing the location of Government housing is at PLAN H 6.2.
Institutional Housing
In addition to government housing, institutional housing has been built by parastatal and/or autonomous bodies such as Panjab University, PGI, IMTACH, CSIO, defence establishments and Survey of India, for their employees. In the early years, 620 housing units for industrial workers were also built by the government in sectors 29 and 30 adjoining the industrial area.
AN ARCHED ENTRY TO A GOVERNMENT HOUSING CLUSTER
LOWER CATEGORY SINGLE STOREYED HOUSING. EACH HOUSE HAS COURTYARD IN THE FRONT AND REAR OF THE HOUSE
GOVERNMENT HOUSING DESIGNED BY PIERRE JEANNERET, MAXWELL FRY AND JANE DREW CELEBRATE VISUAL ORDER AS DESIGN DISCRETION.
INSTITUTIONAL HOUSING AT THE PANJAB UNIVERSITY. SEVEN CATEGORY OF HOUSING (WITH PEONS IN A TYPE PROGRESSING TO THE HIGHER ACADEMICIANS IN LARGER G TYPE )
PLAN H6.1 --HOUSING IN CHANDIGARH
土
Plan H6.2: Location of Government Housing
Sectors with high concentration of Government Housing
The mandate of Chandigarh Housing Board (CHB) is to build affordable, reasonably priced dwelling units for different socioeconomic categories of the city’s residents. The detail of dwellings provided year-wise by CHB is at ANNEXURE-H.1 The board was established in 1976 by extending the Haryana Housing Board Act of 1971 to the Union Territory. The board also undertakes construction of commercial units and other schemes for Chandigarh Administration and other organizations. CHB is also the nodal agency for implementing the administration’s schemes for rehabilitating the residents of unauthorized settlements in the city.
The list of housing schemes by CHB is at ANNEXURE-H.2 & ANNEXURE-H.2(A). Out of these, nearly 42.5% comprising of all the sites and services and most of the EWS units have been provided under different rehabilitation schemes exclusively for the residents of unauthorized settlements. Units in rehabilitation colonies are generally allotted on a hire purchase or license basis with ownership rights being granted only after completing 20 years of stay.
Chandigarh Housing Board has also constructed houses for the poor under schemes like Valmiki Ambedkar Awas Yojna (VAMBAY) and more recently under Jawahar Lal Nehru Urban Renewal Mission (JNNURM).
Prior to creation of the Housing Board, Chandigarh Administration had rehabilitated approximately 12,000 households from unauthorized colonies itself.
CHANDIGARH HOUSING BOARD HOUSING
CHANDIGARH POLICE HOUSING SOCIETY
IAS OFFICERS HOUSES
6.3Private Housing
Nearly one - third of the private plots have an area of one kanal or above. These account for over two- thirds of the total area allocated for private residential plots in the original master plan. The first phase of the city had low density with residential plots ranging from 5 marla to 8 kanal. The second phase has much higher density with a switch mostly to three to four storey flats with the largest plot size being 2 kanals. About 70% of housing in the city was to be built privately.
PRIVATE HOUSING SECTOR 19 CHANDIGARH
PRIVATE HOUSING SECTOR 18 CHANDIGARH
MIDDLE CLASS PRIVATE HOUSING SECTOR 22 CHANDIGARH
6.4 Co-op Housing Societies
The southern sectors, including the ones in Phase III of the city are being developed as a high density area. Various Co-operative Housing Societies and Chandigarh Housing Board have been allotted land in these sectors for construction of HIG, MIG, LIG and EWS flats.
6.5 Cheap Houses
A special category of low cost houses was built in sectors 15, 19, 20 and 24 for low income non-government workers during the 1950s and 60s and their ownership transferred to the allottees on payment of nominal charges. Initially built as single storied units, additional floors have been added to them by the owners over time.
6.6Provision of Students/working Women’s Hostels
Although Chandigarh already has Young Women Christian Association (YWCA), Young Men Christian Association (YMCA), working women’s hostels together with students’ hostels for various colleges and the university, their availability is inadequate for the increasing demand for such accommodation. The dearth of hostel accommodation, results in outstation students opting for Paying Guest accommodation/hired accommodation in the city/villages. Feedback indicates that despite the deficit within the city to meet the city’s own requirement, the limited hostel facilities are often used by the premier institutes of the neighbouring states which lack in adequate facilities.
6.7Residential Accommodations Through Paying Guest Scheme
Through orders dated 05.09.2006, the Chandigarh Administration permitted the use of residential buildings for paying guest accommodation. The minimum area of the house for paying guest accommodation has been fixed as 10 marla with a condition that portion of the house has to be used by the owner. No extra/new kitchen is allowed and a minimum of 50 sq. ft. is to be provided for each paying guest has to be 50 sq. ft. with provision of toilets at one W.C. for five persons. The norms are being violated much to the disadvantage of the residents of the neighbourhood, who complain of the rowdy environs, parking problems and disturbance throughout the day and night. The students too are left free, unattended and unchecked which is detrimental to the society at large.
COOPERATIVE HOUSING SOCIETIES IN THIRD PHASE SECTORS
STUDENTS/WORKING WOMEN’S HOSTELS IN PANJAB UNIVERSITY
Housing in Unauthorised Settlements
One of the biggest problems of planned urban development is that it is preceded by unplanned settlements of construction labour and other service providers needed for undertaking the planned development. Despite being a totally planned new city the emergence of non-plan settlements and services was an inevitable outcome of the non-integration of socio-economic planning in implementation of the Chandigarh Plan and the virtual absence of holistic housing and employment policies. Recently a policy has been adopted to make it mandatory that all new large housing projects must make at least 15% provision for EWS housing.
Shortage of low cost housing also resulted in villages in the periphery becoming concentrations for lower income urban residents.
The initial unauthorized settlements were located near the Capitol Complex and other areas where city development work was started. Resettlement in peripheral sites with allotment of serviced plots and one room tenements was first undertaken in the mid-1970s mostly on land acquired in villages surrounding the master plan area. Some resettlement was undertaken in the southern sectors. Most of the present unauthorized settlements are located in the southern and eastern parts of the UT. As per a biometric survey undertaken by the Estate Office in 2006, the number of households considered eligible for rehabilitation living in the 18 unauthorized settlements was 23974. The details of unauthorized settlements as per Census 2011 are given in ANNEXURE H.3.
Various rehabilitation schemes for residents of unauthorized settlements have been provided as under:
Efforts have been made to provide all basic facilities to the residents of rehabilitation settlements. But major drawback of these resettlements colonies can be summarized as additional encroachment and violation of building bye-laws.
Cramped for space, many households have built additional rooms or toilets and even additional floors (in the case of those provided independent sites). In spite of that, Chandigarh’s Sites and Services Scheme in Dadu Majra won a national prize from HUDCO in 1979. More recently, Chandigarh was given a national award under JNNURM for setting aside the maximum area for slum rehabilitation. The Slum Rehabs are provided with 2 bed-room Houses in order to maintain a healthy lifestyle and better living conditions.
6.9Relaxations Accorded by the Chandigarh Administration :
The biggest problem being faced by most categories of private housing is the need for additional habitable space. This is evident from the large number of building violations being witnessed all over the city, be it in small marla houses or houses on larger plots. Chandigarh Administration has already accorded relaxations to provide relief to all categories of residences. Detailed tabulation of relaxations is given at Annexure H5 (see Annexure Page No. 25). Following is brief of the relaxations
Private Housing
The FAR of marla houses has been increased up to 2.0 with ground coverage upto 70%.
The FAR of one kanal but less than two kanal category plots has been increased upto 1.50 and ground coverage upto 50%.
The FAR of two kanal category has been increased upto 1.25 and ground coverage upto 45%.
The FAR of above two kanal category has been increased upto 1 and ground coverage upto 35%.
An additional habitable floor by permitting use of 2nd floor (barsati floor) is allowed by marginally increasing the height of the houses. Use of upto 25% of the house area has been allowed as office space to professionals such as architects, doctors and lawyers.
A green house/implement store has been allowed in the rear courtyard of frame control marla houses and on kanal houses under architectural control. Subsequently however the zoning plans of housing were revised and additional ground coverage and covered area permitted as part of the main house
3’ wide balcony/projections have been allowed in front and rear of the frame control marla houses.
For the purpose of storage, basement is now allowed under the entire ground floor area instead of the maximum 50% allowed earlier.
Car porch of temporary material has been allowed within the front courtyard of marla houses.
Flexibility in size and shape of windows has been allowed in marla houses.
Mumties permitted in one kanal and above category of houses to facilitate access for maintenance of services provided on top terrace.
Additional entry gate in all houses.
Boundary wall in the rear courtyard of kanal and above houses increased to 5’-11½”.
Government housing:
Construction of additional porch, car sheds, security accommodation, additional servant quarters have been allowed as per approved plan to meet the requirements of the occupants.
Cheap houses:
Additional covered area has been permitted in cheap houses by allowing construction of additional floor and increasing the maximum permissible ground coverage from an average of 57% to 75%.
Plan H6.3: Location of Unauthorised Colonies AS Per Biometric Survey of 2006
Source – Department of Urban Planning, Chandigarh Administration
Un-authorised Colonies
S.NO.
DESCRIPTION
1
KALYAN COLONY
2
KUMHAR COLONY
3
SHAHPUR COLONY
4
RAJIV COLONY
5
GURU SAGAR COLONY
6
L.B.S. COLONY
7
NEHRU COLONY
8
PANDIT COLONY
9
KULDIP COLONY
10
MAZDOOR COLONY
11
COLONY NO. 5
12
AMBEDKAR COLONY
13
KABARI COLONY
14
SANJAY COLONY
15
COLONY NO. 4
16
S.B.S. COLONY
17
MADRASI COLONY
18
JANTA COLONY
Due to pro-active steps taken by the Chandigarh Administration, new rehabilitation colonies have been constructed as per Rehabilitation Plan. Some of the aforesaid colonies have thus been rehabilitated.
土
KALYAN COLONY
UNAUTHORISED COLONIES IN THE CITY
PANDIT COLONY , KULDIP COLONY & MAZDOOR COLONY
GURU SAGAR COLONY
L.B.S. COLONY
NEHRU COLONY
Source – Google Earth images
UNAUTHORISED COLONIES IN THE CITY (CONTINUED)
COLONY NO. 5 Source – Google Earth images
6.10 AUGMENTATION OF HOUSING STOCK WITHIN CHANDIGARH SUBSEQUENT TO ORIGINAL PLAN
Additional residential sectors in the 3rd phase
An area of 1870.54 acres (7.5 sq.kms) from sectors 48 to 56, part of 61 and 63 were carved out to provide high density private group housing, rehabilitation colonies, CHB housing and UT employees housing schemes of various categories.
Residential housing schemes in Manimajra
Land measuring 61.21 acres falling between Chandigarh Kalka Road and the interstate boundary with Panchkula was planned for construction of residential cum commercial scheme .
Modern Housing Complex, Phase-I and II
About 60 acres of land was acquired by the Chandigarh Administration in 1989 and was allotted to Chandigarh Housing Board. 2200 dwelling units of various categories have been constructed in the scheme area in the form of four storeyed flats:-
a) Category – I 480 c) Category – III 456
b) Category – II 384 d) Category – IV 960
Modern Housing Complex Phase-III
Land measuring 9.63 acres of land falling in Pocket 4 and 5 acquired by the Notified Area Committee Manimajra have been allotted to Chandigarh Housing Board. 600 HIG independent dwelling units have been constructed at site.
Housing by Army Welfare Housing Organization -
Land measuring 9.63 acres in Pocket No. 4 and 5 has been allotted to A.W.H.O. in the year 1994. 305 dwelling units of various categories in 3 storeyed blocs have been constructed
Milkmen Colony, Dhanas
With a view to relocate the persons keeping milch cattle and carrying on the business of dairying which was creating insanitary and unhygienic conditions in the city, the Chandigarh Administration in the year 1975 notified the Scheme Chandigarh Milk Colony Allotment of Sites Rules, 1975. Only those persons who were keeping milch cattle in Chandigarh for at least one year prior to the notification coming into force and were selling milk to general public and had at least 5 cattle were eligible. Various categories of plots ranging from 5 marla to 1 kanal were planned. The standardized unit was planned with cattle shed on ground floor and residential accommodation on the upper floor. Subsequently, however these houses were allowed conversion to residential plots subject to payment of charges which has defeated the very intent of the scheme. There is at present a mix of pure residential houses and those with cattle. In stead of restricting the cattle to within the premises large number of cattle owners leave them out in the open along road side berms and parks adversely impacting the sanitation and environment of the area.
Government housing
In addition to the government housing planned in the initial stages of the city, various projects for police housing, additional judges houses, officers’ and officials’ houses of state governments of Punjab and Haryana, Chandigarh Administration, Central Government and ministers’ houses, have been developed in various sectors. There is however still a large deficit in the government housing stock which is shared by the governments of Punjab, Haryana and the Chandigarh Administration.
6.11Overview of the Housing Situation
Chandigarh was initially planned for a population of 500,000. As per 2001 census however, the population of the Union Territory had increased to 9,00,635 out of which 8,08,515 was urban and 92,120 rural. The availability of dwelling rooms per household as per the 2001 Census is shown in the Table below:
Table 6.1Distribution of households by number of dwelling rooms (2001)
Total households
No exclusive room
Oneroom
Tworooms
U.T.Chandigarh
201,878
1931(0.95%)
84,489(41.85%)
50,056(24.79%)
Urban
180,576
1725(0.95%)
69,310(38.38%)
47,395(26.24%)
Rural
21,302
206(0.96%)
15,179(71.25%)
2,661(12.49%)
Source: Census of India, 2001, H. Series, Chandigarh
Table 6.2Distribution of households by number of dwelling rooms (2011)
Total households
No exclusive room
One room
Two rooms
U.T.Chandigarh
235061
1.4
39.3
25.4
Urban
228276
Breakup not available
Breakup not available
Breakup not available
Rural
6785
Breakup not available
Breakup not available
Breakup not available
Source: Census of India, 2001, H. Series, Chandigarh
Socio-spatial maps of the city, both within and outside the master plan’s sectoral grid, show a remarkably skewed distribution of population density together with a ghettoisation of the poor in unauthorized settlements and the rehabilitation colonies in peripheral locations.
According to the 2001 Census, the average density of Phase I sectors was only 26 persons per acre and that in Phase II sectors 60 persons per acre . In contrast, densities in resettlement colonies in the city’s periphery range between 360 to 700 persons per acre.
POCKET 15 (Refer Table IV)
The Chandigarh Administration had initiated the process of acquiring land for Phase-III of the Rajiv Gandhi Chandigarh Technology Park. The land adjoins Phase I & II of the IT Park and is close to Manimajra, railway line and the Sukhna Choe. The 200 ft. wide road connecting the IT Park to the railway crossing cuts through the land.
Land use - The landuse of the pocket is proposed as IT for expansion/ continuity of existing IT complex under Phase I & II with provision of ancillary and other related uses. In view of the eco sensitive nature of the area and extensive tree covered, the same needs detailed planning to ensure their preservation.
The Development Plan for the area needs to be comprehensively worked out to ensure its proper integration with the already developed IT Park Phase-I and Phase-II.
A Green belt 30 mts. Wide has been proposed along the railway line and 100 mts. wide along the Sukhna Choe.
• Road network
In view of the circular configuration of the road network and sewerage system in the acquired part of the Sarangpur Institutional Area, the same configuration is planned for the un-acquired part of Pocket I. Since this is a stand alone pocket and only accessible from defined entries, traffic other than that destined for the area shall not enter it. The width of internal roads in the area should thus be reduced to 35 meters.
The existing road to Mata Jayanti Devi Temple through this pocket should be retained since this is used by large number of followers from this region.
• Land near the UT/Punjab border shall be reserved for an elevated metro station along the metro route.
- Area of land immediately adjoining Khuda Lahora and Jassu villages shall be reserved for developing social and physical infrastructure and to meet the residential requirements of the villages in accordance with the Development Plans proposed to be prepared after examining ground realities. Development of the villages shall be regulated by the Village Byelaws.
Chandigarh Master Plan - 2031
POCKET 2
POCKET 12 (Refer Table VII)
- This pocket of 123.477 acres abuts the Chandigarh-Ambala Road on one side and the interstate boundary with Punjab on another. The railway line and Route No.2 also pass by its side. A small village Makhan Majra, a housing colony of one room tenements and a sewerage treatment plant fall within the pocket.
• A Green buffer of 100 ft. width is proposed along the railway line.
Land use - the permitted landuse for this pocket shall be green/open spaces with uses like agriculture, natural farming with promotion of local agro bio-diversity/indigenous crops, horticulture, orchards, plant nursery, green houses, floriculture, dairy farm, fishery, poultry, etc. subject to obtaining prior approval from the competent authority of Chandigarh Administration.
Housing Policy Framework
I. A holistic housing policy framework with the following components shall be adopted to ensure that the needs of all socio-economic sections of the population are catered for to address some of the aberrations in the city’s development in the past.
II. Ensured provision for EWS in all new housing schemes - It is proposed that all future new housing schemes or housing built through redevelopment of existing government housing stock must ensure that at least 15% of the total units in them are built for economically weaker sections in line with the National Housing Policy.
III. Augmentation of infrastructure in relation to population - It shall ensure expansion of infrastructure, services and amenities in relation to population to maintain the quality of life.
Judicious Use of Limited Land
I. It must be ensured that the limited land still available for housing development is allocated judiciously for meeting the unmet housing demand of all the different sections of the population.
ii. Group Housing in vacant plots of second phase
All vacant residential plots in the Phase II sectors which were earlier planned as plotted development should as far as possible be replanned and used for group housing instead of individual plots. This shall apply to cases where a whole cluster /row of unsold vacant plots are available and not to scattered individual plots .
iii. High density Group Housing in vacant areas in Phase III Sectors
Approximately 215 acres of land in the sectors has been allotted to CHB for housing which is yet to be developed in addition approximately 146 acres of land is also lying vacant in Phase III sectors which is proposed for high density housing development in 4 /6 storey flats to accommodate large number of flats with a gross density of 100 persons per acre. Individual plots allotment shall be discontinued.
Mixed Landuse Development Along Vikas Marg
The mixed landuse, high rise and high density development proposed in the reserved belts flanking both sides of the Vikas Marg (See Chapter on Commercial Areas and Social infrastructure) shall have residential development on the upper floors and commercial and institutional areas on the lower floors. The proposal shall open up large areas for housing of various categories as per modern day requirements which shall include service apartments, guest houses, hostel accommodations etc. alongwith provisions for the essential community facilities.
The area under residential use shall be worked out on the basis of the comprehensive detailed urban design proposal of Vikas Marg and is over and above the residential areas required to meet the demands of the projected population of 2031 .
PLAN SHOWING STATUS OF VACANT LAND IN PHASE III SECTORS
Source: Census of India , 2001, H. Series, Chandigarh
Augmentation of Government Housing
There is need to make adequate provision of government houses for judges and the staff of the High Court , the ministers and legislative and for the large number of officers/officials serving in various offices in Chandigarh.
Mandatory Provision of Facilities for Domestic Servants Within Government Housing
No government houses in future shall be constructed without providing facility for domestic servants.
Single Storeyed Government Housing in Sector-19
450
17
17
296.66
296.66
Total
2987.92
194.695
141.46
51.57
283.56
454.982
389.88
673.858
39.08
450
308.835
DISTRIBUTION OF LANDUSES IN CHANDIGARH (PROPOSED) Area in acres
7
Proposed in Master Plan 17 pockets
3101.9
194.695
141.46
51.57
283.56
454.982
389.88
673.858
39.08
-
-
450
308.835
113.979
8
Percentage
11.25
0.76
0.31
0.18
1
2.52
1.38
1.52
-
-
1.39
1.05
9
Grand Total(5+7)
28170
10866.85
1481.19
2097.67
1610.06
3423.77
2818.35
672.89
341.41
316.29
1573
2563.97
308.83
113.98
10
Percentage(6+8)
100
38.64
5.07
7.44
5.72
13.82
10.00
2.95
1.21
1.12
4.52
8.89
1.05
-
11
Total area in Sq.Km.
114.00
44.00
6.00
8.49
6.52
13.86
11.41
3.37
1.38
1.28
1.20
10.38
1.19
-
TABLE 6.3: PROPOSALS OF HOUSING AT GLANCE
SECTORAL GRID
Phase
Sectors
Government . Plots
Private Plots
CHB
Other Plots
Total Units
Projected Population
Existing Plots
Projected Units
Existing Plots
Projected Units
Plots
Units
I
1 to 30
15063
19540
12110
36330
316
644
5349
89352
270086
II
31 to 47
9081
10385
10678
32034
1939
17144
15072
96333
345945
III
48 to 63 Vacant Areas
186
Yet to be developed
0
0
12910
8542
21638
201424
2. PERIPHERY
Sectors
Area in acres
Proposed density (PPA)
Population in persons
Remarks
Pocket 2 Near Sarangpur
30
250
7500
Proposed
Pocket 7 near Maloya
178
250
45000
Proposed
Chandigarh Armed Police Complex
52.9
123
6500
Under process
Rehabilitation Colonies
264558
Villages
117929
Manimajra
855
136943
Unauthorisedcolonies (to be rehabilitated)
69000
Para Military
50000
Total
Say 16 lakh
6.12 MASTER PLAN PROPOSALS
土
Approval of the Chandigarh Heritage Conservation Committee
Since Phase I sectors have been recommended for Heritage status, the re-utilization of the identified housing /institutional pockets in the first phase shall be undertaken with the prior approval of the Chandigarh Heritage Conservation Committee.
PLAN H6.4:- RE-UTILIZATION OF GOVERNMENT HOUSING POCKETS IDENTIFIED IN THE SECTORS OF THE FIRST PHASE OF THE CITY BY THE EXPERT HERITAGE COMMITTEE CONSTITUTE BY GOVERNMENT OF INDIA.
PUNJAB(NAYA SAOK(KARORAH)
2
3
4
5
6
12
11
10
9
8
7
14
15
16
17BLES STAND
18
19
25
24
23
22
21
20
38W
38
37
36
35
34
39
40
41
42
43BUS STAND
44
56
55
54
53
52
51
61PUNJAB(SAS NAGAR)
63
49
Heritage Status to Government Housing
The Government of India has approved the recommendations of the Expert Heritage Committee (EHC) with respect to according heritage status to identified pockets designed by the first team of architects.
There is, however, persistent demand from the occupants of the government housing for allowing need based changes in the government housing which include additional rooms, toilets, stores, office accommodations, servant rooms, construction of porch, car sheds, guard rooms, coverage of verandahs, enlarging window sizes and change of specifications.
The Chandigarh Administration has previously been allowing changes / modifications some of which have even included structural changes.
In view of the approved recommendations for according heritage status, further additions and alterations to the identified heritage housing stock should be put on hold till the heritage regulations are put in place. The heritage regulations stipulating the extent and nature of additions and alterations that are to be permitted are to be formulated by the Chandigarh Heritage Conservation Committee (CHCC ). The matter is recommended to be put up to the CHCC on priority to address the long pending demands .
Large number of housing stock is also being used by the State Governments of Punjab and Haryana who also need to be sensitized on the heritage aspects and requested to put on hold further additions and alterations till the finalisation of the Heritage Regulations by the CHCC.
GOVERNMENT HOUSE IN SECTOR 5 ACCORDED HERITAGE STATUS BY GOVERNMENT OF INDIA ON THE RECOMMENDATIONS OF THE EXPERT HERITAGE COMMITTEE
POCKETS OF GOVERNMENT HOUSING PROPOSED FOR REDEVELOPMENT IN VARIOUS PHASE I SECTORS BY EXPERT HERITAGE COMMITTEE CAN BE PUT TO RE-UTILISATION IN KEEPING WITH THE LOW RISE CHARACTER OF THE CITY AND WITH THE PRIOR APPROVAL OF CHCC. REDENSIFICATION IS NOT RECOMMENDED.
POCKETS PROPOSED FOR REDEVELOPMENT BY EXPERT HERITAGE COMMITTEE FOR SECTOR 19
Heritage Status Is accorded for the following:-
• Government Model Senior Secondary Schoal
SCOe/3CFe along V4
Goverment Housing as shown
Mandatory Concept Approval is required for the bulldings/sites Isted below:-
0 Insotutional buidings having architectural control along Madhya Marg
private housing along Sarovar Path, Udyog Palt, Sukhna Path
Institutional Bulcings a ong V4
Green Belt Seckr Greers
Mubile Towers
Pockets of Government Housing Proposed for Redevelopment in the Phase I Sectors by Expert Heritage Committee CAN BE Re-utilised. Redensification IS Not Recommended.
土
POCKETS PROPOSED FOR REDEVELOPMENT SECTOR 10
Heritage Status is accorded for the following:-
• Government Museum & Art Gallery campus
• Government College of Art
• Museum of Science
• Government Model Senior Secondary School which functioned as assembly in the initiate stages
Mandatory Concept Approval is required for the buildings/sites listed below:-
• Tennis Courts should retain their earth-sheltered form
• Private Housing along Vigyan Path, Udyan Path, V4 & V5 with back towards Leisure Valley
• Government Polytechnic along Udyan Path
• Home Science College along Udyan Path and Madhya Marg
• Skating Rink along Madhya Marg
• Hostel for Government College of Art on Madhya Marg
• Green Belt, Sector Greens
• Mobile Towers
Re-utilization of Additional Institutional Pockets
In addition to the government housing recommended for Reutilization there are other areas in the Phase I sectors with single / double storeyed government houses/institutional housing which shall also be taken up for Re-utilization to enable utilization of the limited land resource in the land starved city after undertaking systematic and comprehensive surveys and review.
The replanning shall involve preparation of a detailed plan for each such identified pocket and a participatory approach involving the stakeholders. The physical and social infrastructure shall also be augmented proportionately.
Since Phase I sectors have been recommended for Heritage status, the re-utilization of the identified housing pocket in the first phase shall be undertaken in consultation and subject to the approval of the Chandigarh Heritage Committee.
Some other Tentative Pockets that can be considered for Reutilization within the first and second phase sectors one enlisted below. These pockets shall however be finalized after detailed stocktaking of ground realities /norms.
Re-utilization of the Tentative Pockets have however not been included while calculating the holding capacity of the city since the same is subject to feasibility /approval of the private owners.
Tentative Pockets Which CAN BE Considered for Re-utilization:
Industrial Houses in Sectors 29 and 30.
Sector 31 government houses for defence personnel.
Sector 35B – underutilised spaces & old houses of BBMB Govt. General Pool Houses etc. can be considered for replanning.
Sector 35 – double / three storeyed houses of Sector 35 can be considered for conversion into 4 storey houses.
Sector 37 - EWS houses.
Sector 47 – vacant plots / double storeyed government housing for defence personnel subject to defence clearance.
Sector 40 – EWS housing
Sector 41 – government housing.
Sector 43/A – large number of vacant plots which can be clubbed and utilised for group housing.
Sector 44 – large number of vacant plots which can be clubbed and utilised for group housing.
Sector 50 & 51- approximately 38 acres land can be reutilized.
Sector 61 – Housing to be replanned with multi-storeyed flats instead of plotted houses.
Additional FAR and Ground Coverage to Private Housing
The Chandigarh Administration vide notification dated 16/10/2008 has already permitted increased ground coverage and FAR for all sizes of private residential plots and introduced the concept of zoning in place of frame control. Under these regulations, all private plots can build upto 3 floors with each floor having potential of having an independent unit. There are approximately 23000 private plots of all categories within the sectoral grid of the Chandigarh Master Plan. Assuming that each plot will eventually be built upto 3 storeys with one unit per floor, the total dwelling units available will be 69000 which can house approximately 3,00,000 population.
Approximately 9175 units built by the CHB are single storeyed. By permitting the owners to build upto 3 storeys, another 18350 dwelling units can be added.
Mandatory concept approval of identified areas recommended (see chapter on Chandigarh Heritage )
The varying heights of boundary-walls, construction of greenrooms, covering of courtyards, poor maintenance, uneven setbacks, and other additions and violations, have adversely impacted the order of the Built-Environment, and are a cause of serious concern.
Additional covered area and shifting of rear setback of Frame Control of private houses has impacted the streetscape along V3.
Refer 19.8 of Chapter on Chandigarh Heritage
Re-utilisation of Government Housing of the First Phase Sectors
The Expert Heritage Committee constituted by the Government of India has identified certain single/double storey pockets of government housing pockets in the first phase of the city for redensification. After examining the proposal in detail it is recommended that redensification should not be carried out since it is a very complicated and complex issue and will create lot of problems. It will put pressure on existing infrastructure and would also require making adequate provision of physical and social infrastructure - drinking water, drainage system, parking, schools, colleges, hospitals etc.
However, the identified pockets can be re-utilized by the Chandigarh Administration if required. The heritage considerations shall be kept in mind while reutilizing the pockets. It must be ensured that the lower income group housing are not replaced by a smaller number of higher income group units, thereby further skewing the distribution of population of different socio-economic groups within the sectoral grid.
REFER PLAN H6.4. showing re-utilization of Government Housing pockets identified in the sectors of the first phase of the city by the Expert Heritage Committee constituted by Government of India.
Redevelopment /urban Renewal /conservative Surgery of Existing OLD Areas and Villages Within Municpal Limits
In addition to ensuring structural safety in the existing old areas, there are certain congested residential areas in the city, especially in and around the old Manimajra Town which are characterized by poor urban form, high densities, inadequate urban infrastructure, services and lack of community facilities. For these areas, the owners can jointly prepare redevelopment plans on the basis of the redevelopment guidelines to be framed by the Chandigarh Administration.
For each of the identified areas, detailed development plans shall be drawn up which will ensure minimum necessary/feasible level of services and community facilities and services. In addition, building byelaws of these areas should be suitably amended and liberalised to facilitate redevelopment of property. While planning, care shall be taken to ensure that commercial establishments if any should be allowed basically to serve the needs of those living in the lal dora and are to be developed in a manner that they do not open onto main roads and have adequate parking.
Summary
Improvement of the Living Environment of Villages
The villages retained and integrated within the sectoral grid of the second phase and third phase and those which fall in the periphery controlled area outside the sectoral grid have undergone considerable socio – economic changes and are fast changing their residential character to a mixed landuse development. However, these villages still have a major residential component. The present status of the villages and the pressures and challenges being faced have been dealt in detail in the Chapter on Development of Villages.
Comprehensive development plan for each village shall be prepared based on detailed survey of ground realities to ensure an enriched quality of life for the residents of the villages. Permissibility of mixed landuse to the extent in the Village Rules so as to ensure that it is not detrimental to the predominant residential area, removal of non conforming landuses, upgradation of physical and social infrastructure to address the gaps and meet future requirements. While planning care shall be taken to ensure that commercial establishments should be allowed basically to serve the needs of those living in the lal dora and are developed with adequate parking and without opening onto the main roads.
Dormitory accommodation shall be permitted only as per building rules to ensure healthy and safe living with adequate air, light and ventilation.
Conservative surgery shall be carried where found essential to enable proper road widths for fire tender movement and emergency vehicles and laying of services etc. Since construction activity is going on at a rapid pace in the villages, there is need for regulating construction activity and landuses through strict enforcement with immediate effect and timely preparation of the Development Plans and their integration with the surrounding areas.
Early notification and implementation of villages rules after taking feedback from the public/villagers. It is recommended that the vacant areas around the villages should not be further developed till such time as the development plans are finalised. A participatory approach is to be adopted, involving the residents, panchayats and stakeholders.
Proposals for Making Chandigarh ‘slum Free’
Chandigarh’s rehabilitation policy conforms with Government of India’s current vision of Rajiv Awas Yojana which aims at inclusive and equitable cities with every citizen having access to basic social and civic services.
In order to prevent the emergence of new unauthorized settlements, the Administration has already adopted the policy of making it mandatory that 15 % of the dwelling units in all future public residential development must be for EWS/LIG and the same will become applicable even to private residential development. However it is pertinent to mention that in the year 2006 the population living in the slums was approximately 69,000. However as per the Chandigarh census 2011 the population residing in slums is 94,950 persons (Annexure H4). Therefore, strong measures need to be taken to check the further growth of slum’s for making Chandigarh slum free.
New Housing for the Urban Poor
Chandigarh Administration aims to make Chandigarh a ‘Slum Free city’ by building 25728 small flats for rehabilitating all the residents of unauthorized settlements as per the biometric survey conducted in 2006 under BSUP.
These flats are being built in 8 identified locations in the U.T. namely, sector 49(1024 small flats), Sector 38 (West) (1120 small flats), Ramdarbar (576 small flats), Maloya-I (8896 small flats), Maloya-II (3648 small flats), Mauli Jagran-I (320 small flats), Mauli Jagran-II (1696 small flats) and Dhanas (8448 small flats). CHB has already initiated work on building 12864 dwelling units.
All rehabilitation schemes are being planned with neighbourhood community facilities –shopping centres, schools as per norms so as to provide essential facilities within easy reach of the residents .
Rehabilitation units planned earlier as single room unit with a total covered area of 25 sqm. have now been revised to provide two room units with toilet and kitchen space.
Urgent Need for Neighbouring States to Augment Housing for the Urban Poor
There is an urgent need for the neighbouring states to also increase provision of housing for the urban poor to reduce pressure on the limited undeveloped land left with the UT.
Two bedroom houses proposed for rehabilitation schemes
VIEWS OF PROPOSED TWO ROOM DWELLING UNIT SMALL FLAT SCHEME, MALOYA- I& II, MAULI JAGRAN-I
Ensuring Safe Housing - Structural Auditing of Private Housing Stock
There is a large stock of non engineered buildings within Chandigarh which have been constructed without following the codal provisions. The city falls within the high risk prone Seismic Zone IV wherein special measures need to be taken to equip the buildings to be able to withstand earthquakes. Due to the high density development, the unsafe buildings which share common walls, can endanger the life and property of the neighbouring buildings. Some of the major observations are that
(i) The brick work is not of good quality, mortar between brick work is not adequate
(ii) Majority of walls are without plaster which make them more vulnerable to salt attack and less durable
(iii) There are no RCC lintels over wide windows and door openings
(iv) RCC bands required for structural safety during quakes are not provided
(v) Vertical reinforcement at corner of masonry walls are not provided.
(vi) Four storeyed non engineered buildings are very unsafe during quakes. Due to height of four storeyed structures, large bending moments and sheer forces are developed at the base which a non engineered building is unable to bear.
(vii) Vertical alignment of walls is not proper which can cause additional tensile stresses which may cause failure.
(viii) Clear space between buildings on either side of lane is not adequate due to cantilever projections on both sides.
(ix) Masonry columns taking load of upper floors on the floor itself without foundation. Due to lateral movement of the ground during seismic activity, the column can become a critical component.
(x) Masonry columns originating from walls without adequate bond with the wall. During earth quakes, the columns can become critical.
(xi) Staircases in many buildings are resting on cantilever slab which is not desirable.
(xii) Load bearing masonry wall of upper storey is not placed above the masonry wall of the storey below. The walls are displaced by about a feet which is not a proper structural arrangement.
There are a large number of buildings which were designed /allotted as single storeyed initially but have been constructed with additional floors without following the structural safety norms /provisions. Such housing stock also needs to be structurally audited.
On the basis of visual surveys, the following areas are recommended for structural auditing:
Cheap houses in various sectors – Sector 15, 19, 20, 24, 32 etc.
Rehabilitation colonies - Bapu Dham Colony etc
Site and Services schemes of Sector 25.
EWS houses of Sector 29B, & TBRL, OFC houses in Sector 29.
Housing stock within the old abadi deh of Manimajra as well as in the organic developments around it including, Gobindpura, Mori Gate, Bhara Mal Nagar, Dehra Sahib, Mata Raj Kaur, Darshini Dagh, Thakur Dwara, Shanti Nagar Pipliwala Town, Mariwala Town, Subhash Nagar and Bank Colony.
Housing stock within and outside the abadi deh of villages
A systematic examination of the structural safety of the housing units shall be undertaken which will guide follow up action – redevelopment /retrofitting /urban renewal to be undertaken.