With prior approval from the Chairman, NIT, mining or quarrying operations may be permitted subject to the conditions prescribed in this Regulation.
a) Quarrying shall be regulated in accordance with the method prescribed by the Collector, Nagpur District.
b) The conditions prescribed under the Maharashtra Minor Mineral Extraction Rules and Regulations, 1966 shall be observed.
41.1 Areas Where Mining and Quarrying shall be Prohibited
Quarrying shall not be permitted within:
a) 500m from the gaothan/ village settlements, rivers, forts, historical places, National Highway, State Highway, Major State Highway; and places of tourist interest,
b) 500m from the high flood line
41.2 Site Planning
a) Mining and quarrying operations shall be undertaken in a controlled manner, such as starting operations on a site away from crowded areas and later gradually extending it to the other areas.
b) Hill tops and hill slopes from which rain water flows should not be allowed to be used for mining and quarrying.
c) Natural landscape and environment are not to be adversely affected.
d) In case of murum quarrying, entire weathered soil or murum shall not be excavated exposing the hard rock. Instead, a capping of atleast 0.5m shall be left so that it can support vegetation and plantation during restoration.
e) A quarry or a mine shall have access from road with minimum width 15m.
41.3 Restoration of Inactive or Derelict Mines and Quarries
Land utilized for mines and quarries shall be restored after end of lease period and useful for the community:
a) Pits and holes created in the process of mining and quarrying should not be left open and be appropriately filled up
b) Site shall be restored so as to make it safe either by raising a garden or in addition by planting fruit growing trees around it or by converting it into a water reservoir.
41.4 Submission of Maps and Documents to NIT/ SPA
The following maps and documents shall be submitted to the NIT/ SPA for obtaining prior approval of Chairman NIT:
a) location Plan at the scale of 1:5,000;
b) site plan on a scale of 1:500 showing site boundaries, access, contours, all existing natural and manmade features such as hills, water courses, trees, and other important landscape features, access roads, buildings and other structures;
c) existing dwellings or other development within 1km from the site boundary;
d) proposed excavation plan and cross sections at 1:500 or larger scale showing proposed phasing, terracing, stepping, benching slopes, locations of process equipment, diversion of water courses, impounding lake and storage areas for top soil, waste material and quarried material.
e) landscaping including screen planting, mounding
f) Restoration Plan.
Areas not included in the Mines and Quarry Zone shown on the Development Plan shall be permitted for utilization as mines and quarries only in areas identified/ selected by a committee comprising of the Director of Mining and Geology, the Collector, Nagpur and the Deputy Director of Town Planning, Nagpur Division, Nagpur, on lands not less than 40 ha considering the availability of stones and minerals and demand, as per the State Government policy for quarry zone as amended from time to time. No such mines and quarries shall be permitted within urban sectors delineated on the Development Plan.
41.5 Control of Air Pollution
a) During the entire period of quarrying and mining operations, water shall be sprayed at least once a day over the roads at quarry sites.
b) Measures to minimize dust pollution such as adoption of hoods at transfer points, vulcanizing of conveyor belt joints, under belt cleaning of devices shall be employed apart from installations of dust suppressions and/ or dust extrication system for conveyance.
c) Kaccha roads leading to or within quarry and mine sites shall be planted with trees on either sides at the rate of 1 tree every three meters in order to arrest dust.
41.6 Brick Kilns
Siting of brick kilns shall not be permitted within the distances from various existing uses given below:
| Sr No. | Distance from | Distance |
|---|---|---|
| 1. | Municipal Corporation Limits | 5 km |
| 2. | Class A Town & Cities Limits | 2 km |
| 3. | Other Town & Cities Limits (Municipal councils) | 1 km |
| 4. | Village Gaothan | 500 m |
| 5. | Wild life Sanctuary / Zoo | 500 m |
| 6. | National Highway | 500 m |
| 7. | State Highway * / Scheduled Road | 300 m |
| 8. | Residential Area (15 Pucca Houses) / Educational Institutes | 500 m |
| 9. | Historical or Religious Places/ Protected Monuments / Rivers / Dams / High Tension Line | 1 km |
Maximum Stack Height
The following stack heights are recommended for optimal dispersion of particulate matter:-
| Kiln Capacity | Stack height |
| Less than 15,000 brick per day (Less than 15 ft trench width) | Minimum stack height of 22m or, |
| Induced draught fan operating with minimum draught of 50mm | |
| Water Gauge with 12m stack height. | |
| 15,000-30,000 brick per day | Minimum stack height 27 m in with (15-22 ft trench width) gravitational settling chamber or |
| More than 30,000 brick per day (More than 22 ft. trench width) | Minimum stack height of 30 m with gravitational settling chamber or Induced draught fan operating with minimum draught of 50mm Water Gauge with 17 m stack height. |
Considering the immediate need to protect the top soil and to find ways for safe disposal/utilization of fly ash, it is required that all brick manufacturing units shall utilize fly ash in optimal proportion from thermal power plants for making bricks.
Other regulations
a. Approach road within the premises of brick kiln area should be pucca/ stabilized with brick bats etc. shall be maintained by owner of Brick Kiln
b. Crushed coal should be used or better burning efficiency.
c. Bricks should be laid in a staggered manner for baking to entrap maximum particulate matter at the source itself.