33.1 Definitions
a) Non-ambulatory Disabilities: – Impairments that, regardless of cause or manifestation, for all practical purposes, confine individuals to wheelchairs.
b) Semi-ambulatory Disabilities: - Impairments that cause individuals to walk with difficulty or insecurity, individuals using braces or crutches, amputees, arthritics, spastics, and those with pulmonary and cardiac ills may be semi-ambulatory.
c) Hearing Disabilities:- Deafness or hearing handicaps that might make an individual insecure in public areas because he is unable to communicate or hear warning signals.
d) Sight Disabilities: - Total blindness or impairments, which affect sight to the extent that the individual, functioning in public areas, is insecure or exposed to danger.
e) Wheel Chair: - Chair used by disabled people for mobility. The standard size of wheel chair shall be taken as 1050 mm x 750 mm.
33.2 Scope
These regulations are applicable to all buildings and facilities used by the public such as educational, institutional, assembly, commercial, business, mercantile buildings constructed on plot having an area of more than 2000 sq.m. It does not apply to private and public residences.
33.3 Site Development
Level of the roads, access paths and parking areas shall be described in the plan along with specification of the materials.
Access Path/ Walk Way
Access path from plot entry and surface parking to building entrance shall be minimum of 1800 mm wide having even surface without any steps. Slope, if any, shall not have gradient greater than 5%. Selection of floor material shall be made suitably to attract or to guide visually impaired persons (limited to coloured floor material whose colour and brightness is conspicuously different from that of the surrounding floor material or the material that emits different sound to guide visually impaired persons; hereinafter referred to as “guiding floor material” (Refer Regulation 33.4). Finishes shall have a non-slip surface with a texture traversable by a wheel chair. Curbs wherever provided should blend to a common level.
Parking: For parking of vehicles of handicapped people, the following provisions shall be made-
a) Surface parking for two car spaces shall be provided near entrance for the physically handicapped persons with maximum travel distance of 30.0 m. from building entrance.
b) The width of parking bay shall be minimum 3.6 meter.
c) The information stating that the space is reserved for wheel chair users shall be conspicuously displayed.
d) Guiding floor materials shall be provided or a device, which guides visually impaired persons with audible signals, or other devices, which serves the same purpose, shall be provided.
Building requirements
The specified facilities for the buildings for physically handicapped persons shall be as follows:
a) Approach to plinth level
b) Corridor connecting the entrance/exit for the handicapped.
c) Stair-ways
d) Lift
e) Toilet Drinking Water
33.3.3.1 Approach to plinth level – Every building should have at least one entrance accessible to the handicapped and shall be indicated by proper signage. This entrance shall be approached through a ramp together with the stepped entry
33.3.3.2 Ramped Approach – Ramp shall be finished with non-slip material to enter the building. Minimum width of ramp shall be 1800mm with maximum gradient 1:12. Length of ramp shall not exceed 9.0 meter having 800mm high hand rail on both sides extending 300mm beyond top and bottom of the ramp. Minimum gap from the adjacent wall to the hand rail shall be 50mm.
33.3.3.3 Stepped Approach:- For stepped approach size of tread shall not be less than 300mm and maximum riser shall be 150mm. Provision of 800mm high hand rail on both sides of the stepped approach similar to the ramped approach.
Exit/Entrance Door:- Minimum & clear opening of the entrance door shall be 900mm and it shall not be provided with a step that obstructs the passage of a wheel chair user. Threshold shall not be raised more than 12mm.
33.3.3.5 Entrance Landing:- Entrance landing shall be provided adjacent to ramp with the minimum dimension 1800mm x 2000mm. The entrance landing that adjoins the top end of a slope shall be provided with floor materials to attract the attention of visually impaired person’s (limited to coloured floor material whose colour and brightness is conspicuously different from that of the surrounding floor material or the material that emits different sound to guide visually impaired persons hereinafter referred to as “guiding floor material” (Refer Regulation 33.4). Finishes shall have a non-slip surface with a texture traversable by a wheel chair. Curbs wherever provided should blend to a common level.
Corridor connecting the entrance / exit for the handicapped: The corridor connecting the entrance / exit for handicapped leading directly outdoors to a place where information concerning the overall use of the specified building can be provided to visually impaired persons either by a person or by signs, shall be provided as follows:
a) ‘Guiding floor materials’ shall be provided or device that emits sound to guide visually impaired persons.
e) The minimum width shall be 1500mm.
f) In case there is a difference of level, slope ways shall be provided with a slope of 1:12.
g) Hand rails shall be provided for ramps/slope ways.
Stair-ways - One of the stair-ways – near the entrance / exit for the handicapped shall have the following provisions:
a) The minimum width shall be 1350 mm.
h) Height of the riser shall not be more than 150 mm and width of the tread 300mm. The steps shall not have abrupt (square) nosing.
i) Maximum number of risers on a flight shall be limited to 12.
j) Hand rails shall be provided on both sides and shall extend 300 mm on the top and bottom of each flight of steps.
Lifts - Wherever lift is required as per these Regulations, provision for wheel chair users shall be made in least one lift, as per the following lift car dimensions, for passenger lift of 13 persons capacity of Bureau of Indian Standards.
33.4 Guiding / Warning Floor Material
The floor material to guide or to warn the visually impaired persons with a change of colour or material with conspicuously different texture and easily distinguishable from the rest of the surrounding floor materials is called guiding or warning floor material. The material with different texture gives audible signals with sensory warning when a person moves on this surface with walking stick. The guiding/warning floor material is meant to give the directional effect or warn a person at critical places. This floor material shall be provided in the following areas:
a) The access path to the building and to the parking area.
b) The landing lobby towards the information board, reception, lifts, staircases and toilets.
c) Immediately at the beginning/end of walkway where there is vehicular traffic.
d) At the location abruptly changing in level or beginning/end of a ramp.
e) Immediately in front of an entrance/exit and the landing.
34 INSTALLATION OF SOLAR ASSISTED WATER HEATING SYSTEM
34.1 All building premises with hot water requirements of a capacity exceeding 100 litres per day shall install and use solar water heating (SWH) system, for at least 50 percent of their annual water heating requirement.
34.2 Solar water heating systems should be made in the building for hospitals, hotels, hostels, guest houses, police men/ army barracks, canteens, laboratories and research institutions, schools and colleges and other institutes.
34.3 The solar water heating system should be mandatory in the hospitals and hotels, where the hot water requirements are of continuous nature. These buildings must be provided with auxiliary back-up system.
34.4 The use of solar water heating system is recommended in the following type of buildings in Government/ Semi-Government and Institutional buildings where the hot water requirements may not be continuous/ permanent:
a) Guest Houses
b) Police men/Army barracks
c) Canteens
d) Laboratory & Research Institutions where hot water is needed.
e) Hostels, Schools, Colleges and Other Institutes.
34.5 The Installation of the electrical back up in all such water heating system shall be optional depending on the nature of requirements of the hot water. The backup systems may be integrated into SWH system or be separate.
34.6 It is suggested that solar heating systems of the capacity of about 100 liters per day based on thermosyphonic with necessary electrical back-up be installed at residential buildings like hostels.
34.7 In order to facilitate the installation of the solar water heating systems, the new buildings shall have the following provisions:
a) All such buildings where solar water heating systems are to be installed will have open sunny roof area available for installation of solar water heating system.