This involved four broad steps, as explained below:
-
Rectification of Aerial imagery
-
Generation of contours using Digital Elevation Model
-
Creation of revenue/land records layer by georeferencing revenue maps
-
Digitization of each building information using high-resolution aerial imagery
Preparation of geo-referenced base maps is the basic requirement for the Existing Land Use (ELU) Map. All revenue records such as village maps, Tippan, Phalani, Akarband, etc. from revenue department were collected. The records were correctly decoded, digitized and brought to a proper scale.
High-resolution aerial imagery was captured for the Study Area. The detailed information about land features, land use, built-up areas, city structure and urban form, physical aspects of the environment, etc. were extracted from the aerial photographs.
A Digital Elevation Model is created for the entire project area to support the generation of ≤10 cm Ground Sample Distance (GSD) orthophotos. 0.5 m contours were generated for the entire PMR, the contour lines of 5 m and 25 m are shown in the ELU Map.
A comprehensive land information system (LIS) was created, including a parcel boundary, ownership records and digitized land record data. Geo-referencing of survey records available with the State Revenue/Land Records department was done for the Study Area.
A cadastral map was prepared by superimposing revenue records with high resolution aerial photogrammetric images with the help of GCNP (Ground Control Network Point) with geo-referencing attributes of each land parcel.
Detailed information about each building within the development plan area of PMRDA and related data from various government authorities has been collected. The information is then presented in a GIS layer with appropriate attributes.
Methodology for Data Collection
Primary Data: Physical Survey done in year 2017 includes maping of social amenities, building uses and extent of natural feature. Interview and photo documnetation were two menthods used to collect infromation. Secondary Data: Sourcing of Data from various government authorities and institutions in 2017. Desktop study includes sourcing data from official websites and research articles. Government Resolutions, notifications and Development Control Regulations form source of major information.
All these steps ultimately culminated into the creation of the Existing Land Use (ELU) map.