Technical Clearance is hereby granted for carrying out the
*(a) Land sub-division (Provisional/Final)
*(b) Construction of Building (Reconstruction/Extension/Alteration)
*(c) Construction of compound wall
*(d) Change of use of (building/Land)_/as per the enclosed approved plans in the property zoned as____ in ODP/CDP/Regional Plan and situated at ____ Village/Town bearing Survey No./Chalta No. ____ of PTS No. ____, Plot No. ____ of ____ approved sub-division reference No./Development Permission No. ____ dated ____ with the following conditions:-
²⁵⁹ Substituted vide notification No. 21/1/TCP/2011/Part file/3252 dated 1-8-2011.
160-
-
Construction shall be strictly as per the approved plans. No changes shall be effected in the approved plans/approved built spaces without the prior permission of this Authority.
-
The permission granted shall be revoked, if any information, plans, calculations, documents and any other accompaniments of the application are found incorrect or wrong at any stage after the grant of the permission and the applicant will not be entitled for any compensation.
-
The permission shall be revoked if found expedient to such an action under the provision of Section 50 of The Goa Town and Country Planning Act, 1974.
-
The development permission will not entitle the applicant for making/laying any claim on water and any other connection from the Government of Goa.
-
The Developer/applicant should display a sign board of minimum size 1.00 mts. x 0.50 mts. with writing in black color on a white background at the site, as required under the Regulations.
-
The applicant shall obtain Conversion Sanad under The Goa Land Revenue Code, 1968, before the commencement of any development/construction as per the permission granted by this order.
-
The soak pit should not be located within a distance of 15.00 meters from any other existing well in the plot area/plan.
-
The commencement and the completion of the work shall be notified to the authority in writing in appropriate forms.
-
Completion Certificate has to be obtained from this Authority before applying for Occupancy Certificate from the licensing authority.
-
Storm water drain should be constructed along the boundary of the effected plot abutting to the road.
-
Adequate Utility space for the dustbin, transformer etc. should be reserved within the plot area. In case of any cutting of sloppy land of filling of low-lying land, beyond permissible limits, prior permission of the Chief Town Planner shall be obtained before the commencement of the works per the provisions of Section 17(A) of The Goa Town and Country Planning Act, 1974.
-
In case of compound walls, the gates shall open inwards only and traditional access, if any passing through the property shall not be blocked.
-
The Ownership of the property shall be verified by the licensing body before the issuing of the licence.
THIS ORDER IS ISSUED WITH REFERENCE TO THE APPLICATION DATED ____ FROM SHRI/SMT. ____.
²⁶⁰ [THIS ORDER IS VALID FOR THREE YEARS FROM THE DATE OF ISSUE OF CONSTRUCTION LICENCE, PROVIDED THE CONSTRUCTION LICENCE IS ISSUED WITHIN THE PERIOD OF THREE YEARS]
Senior Town Planner/Town Planner/
/Dy. Town Planner
²⁶⁰ Substituted vide notification No. 21/1/TCP/2011/Part file/3252 dated 1-8-2011.
161–
To
Shri/Smt.
Copy to
(a)* Municipal Council
(b)*Village Panchayat of
* strike out which is not applicable
APPENDIX - C3
Municipal Building Licence
Municipal Council, _, Goa.
CONSTRUCTION LICENCE
No.
Date:
Licence is hereby granted for carrying out the —
*(a) Land sub-division (Provisional/Final)
*(b) Construction of Building (Reconstruction/Extension/Alteration)
*(c) Construction of compound wall.
*(d) Change of use of (Building/Land) /as per the enclosed approval plan/plans in the property zoned as in the ODP/CDP/Regional Plan and situated at Village/town bearing Survey No./Chalta No.____ of PTS No. /Plot No. of approved sub-division reference No./Development Permission Order No. with the following conditions:-
-
The applicant shall strictly comply all the conditions imposed in the Development Permission/Technical Clearance Order No. dated issued by the Planning and Development Authority/Town and Country Planning Department.
-
The applicant shall notify the Council for giving the alignment of the building.
-
The construction should maintain the minimum prescribed horizontal and vertical clearances from any overhead electrical line passing adjacent to the construction.
-
All RCC/Structural works shall be designed and supervised by the Engineer who has signed the Structural Liability Certificate submitted to the Municipal Council.
-
No material for construction or earth from excavation or any other construction material shall be stacked on the public roads.
-
The building should not be occupied unless the occupancy certificate is obtained from the Council.
162–
-
The construction licence shall be revoked if the construction work is not executed as per the approved plans and the statements therein and whenever there is any false statement or misrepresentation of any material passed, approved or shown in the application on which the permit was based.
-
The applicant should construct a separate soak pit in order to derivate in the sullage water.
-
Any soak pit should be constructed at a minimum distance of 15 meters away from any well.
-
The ventilation pipe of the septic tank should be provided with a mosquito net.
-
The Applicant should connect the pipelines from their latrines/WC‘s to the sewerage line at their own cost, when the sewerage line is commissioned.
-
The applicant should fix a board at a prominent place whenever the construction is started, indicating the number, the date and the authority for which the licence for development work has been granted.
-
All the building material and other rubbish should be cleared from the construction site before applying for the Occupancy certificate.
-
Water storage tanks shall be provided with mosquito proof lids and over flow pipes. The tanks should be provided with access ladders wherever necessary.
-
The drains surrounding the plot if any should be constructed with PCC and should be covered with removable RCC slabs of sufficient thickness.
-
The applicant should gift the road widening area to the council before applying for the Occupancy certificate, if the applicant has utilized the extra FAR in lieu of the road widening affecting the plot.
-
The applicant should plaster and paint the building internally as well as externally before applying for Occupancy certificate. Exposed brick/laterite/concrete/stone/ashlars masonry finish to buildings will also be permitted.
-
The applicant should provide a dustbin at a convenient place accessible for the Municipal vehicle for collection of garbage.
-
Road widening area shall be asphalted to the existing road level before applying for occupancy certificate.
-
Garages and Parking areas shown in the approved plan shall be strictly used for parking purposes only and should be easily accessible to vehicles. No commercial activities shall be allowed in these areas.
-
Access up to the entrance of the building is to be paved and is provided with drainage facilities.
-
Space for parking of vehicles is clearly demarcated on the ground.
-
No Restaurants/Bars will be permitted in the shops unless a separate soak pit is provided besides confirming to the rules in force.
-
No commercial activities will be permitted in the shops unless a separate permission is obtained from this council.
163–
-
The applicant should maintain all existing natural drains in the plot and should not block them at any stage.
-
No soak pit or other structures should come in the road widening area.
-
The plot boundary should be cordoned off by continuous sheet fencing either of wood or metal during the construction period.
-
The construction of compound wall should not obstruct any pathway or any public access. The applicant shall make necessary arrangements for smooth flow of rain water by keeping adequate openings in the compound wall for the purpose.
-
No gates shall open outwards on to the road.
-
The construction of the compound wall should be as per the approved plan. The applicant shall inform this council after the completion of the compound wall.
-
Drinking water well should be 15 meters away from any soak pit.
THIS LICENCE IS VALID FOR A PERIOD OF THREE YEARS FROM THE DATE OF ISSUE OF THIS LICENCE. RENEWAL IF REQUIRED SHALL BE APPLIED WITHIN THE PERIOD OF THE VALIDITY OF THE LICENCE.
Chief Officer
Municipal Council
To,
Shri/Smt.
Copy to
*(a) Member Secretary, Planning and Development Authority
*(b) Senior Town Planner TCP