Relaxation as regards coverage in case the plot is already built upon or having an existing structure before coming into force of these regulations, and the area covered by such existing building/buildings having 60% or above coverage, the coverage of the proposed building (or the composite coverage of the proposed and existing building) may be relaxed up to 10%, over and above the coverage permitted.
250[22.4. Relaxation in case of Industrial Buildings and Buildings constructed by Government:
(a) In case of Industrial buildings where there are specific requirements due to processing or operational needs or for installation of plant and machinery, the Competent Authority may, for reasons to be recorded in writing, relax the regulations regarding maximum height and minimum setback.
(b) In case of buildings constructed by Government, Government owned bodies (autonomous/corporations), local bodies and buildings constructed under specific schemes of housing or other Government schemes, executed by or on behalf of Government on PPP mode or any other mode of execution, the Government, may, for reasons to be recorded in writing relax the regulations regarding maximum height and minimum setbacks on its merit considering larger public interest to be achieved by such projects.]
249 Inserted vide notification No. 21/1/TCP/2011/Part file/3252 dated 1-8-2011.
250 Substituted vide Amendment Regulation 2018 (September).
137–
251[22.4.(a). Regularization of unauthorized construction.— 252{a)} Regularization of unauthorized constructions may be done on recommendation of the Town & Country Planning Department or the Planning & Development Authority, as the case may be, by levying compounding fee for structures having an area of not more than 500 square meters by the local authority, provided that—
(i) such constructions shall fully comply with these Regulations, and
(ii) compounding fee amounting to not less than 3 times of normal licence fee is paid by the owner of such constructions.
253{(b) Regularization of unauthorized construction having an area of more than 500 square metres, complying with these regulations and built before 31-12-2020 may be done on recommendation of Town and Country Planning Department or the Planning & Development Authority by verifying that the construction is carried out prior to the cutoff date i.e. 31-12-2020, period of construction shall be ascertained based on documents like electricity bill, water supply bill, tax receipts and other evidences. Compounding fee shall be six times the normal license fee for regularization of these structures.}
254{Note: Regularization of constructions may be considered in the conservation zones, only with the recommendation of the Conservation Committee. Similarly, regularization in Coastal Regulation Zone can be considered only after obtaining approval from the Goa Coastal Zone Management Authority.}].