22.3Relaxation in case of existing Coverage 60% and above:
Relaxation as regards coverage in case the plot is already built upon or having an existing structure before coming into force of these regulations, and the area covered by such existing building/buildings having 60% or above coverage, the coverage of the proposed building (or the composite coverage of the proposed and existing building) may be relaxed up to 10%, over and above the coverage permitted.
250[22.4. Relaxation in case of Industrial Buildings and Buildings constructed by Government:
(a) In case of Industrial buildings where there are specific requirements due to processing or operational needs or for installation of plant and machinery, the Competent Authority may, for reasons to be recorded in writing, relax the regulations regarding maximum height and minimum setback.
(b) In case of buildings constructed by Government, Government owned bodies (autonomous/corporations), local bodies and buildings constructed under specific schemes of housing or other Government schemes, executed by or on behalf of Government on PPP mode or any other mode of execution, the Government, may, for reasons to be recorded in writing relax the regulations regarding maximum height and minimum setbacks on its merit considering larger public interest to be achieved by such projects.]
249 Inserted vide notification No. 21/1/TCP/2011/Part file/3252 dated 1-8-2011.
250 Substituted vide Amendment Regulation 2018 (September).
137–
251[22.4.(a). Regularization of unauthorized construction.— 252{a)} Regularization of unauthorized constructions may be done on recommendation of the Town & Country Planning Department or the Planning & Development Authority, as the case may be, by levying compounding fee for structures having an area of not more than 500 square meters by the local authority, provided that—
(i) such constructions shall fully comply with these Regulations, and
(ii) compounding fee amounting to not less than 3 times of normal licence fee is paid by the owner of such constructions.
253{(b) Regularization of unauthorized construction having an area of more than 500 square metres, complying with these regulations and built before 31-12-2020 may be done on recommendation of Town and Country Planning Department or the Planning & Development Authority by verifying that the construction is carried out prior to the cutoff date i.e. 31-12-2020, period of construction shall be ascertained based on documents like electricity bill, water supply bill, tax receipts and other evidences. Compounding fee shall be six times the normal license fee for regularization of these structures.}
254{Note: Regularization of constructions may be considered in the conservation zones, only with the recommendation of the Conservation Committee. Similarly, regularization in Coastal Regulation Zone can be considered only after obtaining approval from the Goa Coastal Zone Management Authority.}].
22.5Compounding of deviations:
Any minor deviations which have occurred due to site conditions may be regularized by the authority competent to issue approval/NOC; provided the said deviations does not affect the FAR/Coverage and height of the building beyond 5% of the permissible limits. Such excess area shall be charged at double the cost of construction or value of such excess FAR prevalent at the time of regularization 255[, whichever is higher] and shall be compounded by the Competent Authority.
256[Note: In case of increase in height of buildings upto 5% or overall shift of position of the building without reducing the setback requirements by more than 5% and there is no increase in additional floor area and is complying with regulation 13.1(b) then the levy of compounding fee/charges as mentioned above shall not be applicable.]
23. Development undertaken on behalf of the Government.
All Government Departments and Government Undertakings, for construction of buildings/land development including sub-division of land shall inform the Competent Authority in writing of the intention to carry out any development and submit all documents and plans as required under Regulation 3.2 and obtain building licence from local bodies.
251 Inserted vide notification No. 21/1/TCP/2011/Part file/3252 dated 1-8-2011.
252 Numbered vide Amendment Regulations, 2023.
253 Inserted vide Amendment Regulations, 2023.
254 Substituted vide Amendment Regulations, 2023.
255 Inserted vide Amendment Regulations, 2023.
256Inserted vide Amendment Regulations, 2023.
138–
24. Development undertaken in GIDC estates.
As per Notification No. 15/14/92-IND published in Extraordinary Official Gazette dt. 22-02-2001, provisions of any law related to local authorities providing for control and erection of buildings has ceased to apply to Industrial Estates.
Permission for development in notified GIDC estates shall be obtained from respective GIDC authorities and shall be governed by these regulations and the GIDC shall follow these regulations while granting permission in Industrial Estates existing as well as proposed Industrial Estates.
25. (A) Transfer of Development Rights (TDR).
In certain circumstances, the development potential of a plot of land may be separated from the land itself and may be made available to the owner of the land in the form of Transferable of Development Rights (TDR).
These rights may be made available by the Government and be subject to the Regulations made at the appropriate time.
The said TDR regulations will be restricted to the following circumstances and purposes:-
(a) In case of private property which is reserved for recreational purposes under zone R in any Plan in force and is transferred to Government/Local Authority/PDA without any monetary compensation, the FAR applicable to the neighboring zone shall be allowed to be sold for the development of properties of other developable zones in the specially designated areas.
(b) In case of private property which is affected by the road widening as per any Plan in force and the affected area is transferred to Government/Local Authority/PDA without any monetary compensation, than the FAR of the said affected area shall be allowed to be sold for the development of properties of other developable zones in the specially designated areas as under:-
(i) in case the FAR of the said affected area cannot be used fully utilized within the plot, then the unutilized FAR shall be allowed to be sold for the development of properties of other developable zones in the specially designated areas.
(ii) in case the FAR of the said affected area is elected not to be used, within the plot, then the said FAR shall be allowed to be sold for the development of properties of other developable zones in the specially designated areas, provided an undertaking is given towards the permanent surrender of the use of such FAR within the plot.
(c) In case of Conservation zones where full development rights cannot be utilized due to the restrictions as per Plan in force, then the unconsumed FAR shall be allowed to be sold for the development of properties of other developable zones in the specially designated receivable areas in the plans.
139–
(B) Land Pooling, Accommodation, Reservation and Readjustment/Resettlement Scheme.
Due to deficiency in urban amenities, utilities, services and facilities as well as paucity of land and increasing rates of land that needs to be acquired it is necessary to introduce concepts of innovative land assembly technique wherein the participation of the land owner is sought for the purpose of implementation of the planning proposals.
Similarly there is a need felt for relocation of certain undesirable activities which find themselves located within the main city limits due to the growth of cities.
In order to streamline the planning process and decongest the traffic, such uses can be located along the periphery of the city.
Activities like warehouses, godowns, petrol pumps, service workshops, repair garages, garbage treatment plants, crematoriums, cemetery, burial grounds and scrap yards could be covered.
Accommodation Reservation allows the land owners to develop the sites reserved for an amenity in a plan using full Floor Area Ratio on the plot subject to agreeing to entrust and hand over such amenity to the local body free of all encumbrances and accept the full Floor Area Ratio as compensation in lieu thereof.
Land Pooling and Readjustment Scheme, allows pooling of land, by different owners, formulation and approval of a planned layout showing the original as well as the final plots, with participation of the owners and redistribution and paying compensation for the land used for public purposes and transferred to the local body.
26. FORMS/SCHEDULES
Appendix
Title
A1-PDA
Application for development Permission u/s 44 of the Goa Town Country Planning Act, 1974 (Goa Act 21 of 1975) to PDA
A1-TCP
Application for Technical clearance to TCP
A2
Application for Building Licence to Municipal Council
A3
Application for Building Licence to Village Panchayat
A4
Application for recommendation for Conversion sanad to PDA or TCP
A5
Application for Completion Order to PDA or TCP
140–
A6 Application for Occupancy certificate to Municipal Council or Village Panchayat
A7 Application for Registration/Renewal of Registration.
A8 Form of Registration Certificate
B1 Questionnaire
B2 Certificate of Conformity with regulations by Architect/Engineer/Structural Engineer/Town Planner/Landscape Architect/Urban Designer
B3 Structural Liability Certificate by Engineer/Structural Engineer
B4 Affidavit by the Owner
B5 Structural Stability Certificate by Engineer
B6 Completion Certificate by Architect/Engineer/Structural Engineer/Town Planner/Landscape Architect/Urban Designer
C1 Development permission from PDA
C2 Technical clearance order from TCP
C3 Municipal Building Licence
C4 Village Panchayat Licence
C5 Completion Order by PDA
C6 Completion Order by TCP
C7 Occupancy Certificate by Municipal Council
C8 Occupancy Certificate by Village Panchayat
C9 Refusal of Development Permission by PDA
C10 Refusal of Technical Clearance by TCP
C11 Refusal of Building Licence by Municipal Council/Village Panchayat
D1 Intimation to Municipal Council/Village Panchayat-Stages of Construction
E1 Application to Application for Technical clearance to Notary Architect/Engineer
E2 Application for Completion Order to Notary Architect/Engineer
E3 Application for Registration/Renewal of Registration by Notary Architect/Engineer
E4 Form of Registration Certificate of Notary Architect/Engineer
E5 Certificate of Conformity with regulations by Notary Architect/Engineer
E6 Technical clearance order from Notary Architect/Engineer
E7 Completion Order by Notary Architect/Engineer
E8 Refusal of Technical Clearance by Notary Architect/Engineer
Chapter 22Relaxations and saving provisions.
22.1 Relaxation for Housing Development for Economically Weaker Section:
In case of development for Economically Weaker section, for sub-division as well as building construction, by the Local Authorities, State or Central Govt. Departments, Housing Board, Planning and Development Authorities or any Private Developer, the Competent Authority may, for reasons to be recorded in writing, relax the regulations to the extent that the minimum size of the plot may be relaxed to 60 m2 and maximum coverage may be relaxed up to 60%.
22.2 Relaxation for additions/alterations to existing non-high rise buildings:
In case of applications for additions/alterations to non high rise buildings only, if on considering the merits of the case, it becomes evident that the applicant may face hardships in complying with the Regulations, as the applicant has already completed/part completed the development prior to the coming into force of these Regulations, the Competent Authority may, for reasons to be recorded in writing, relax or waive any of the above Regulations except those regarding F.A.R. and projections within setback lines.