4.1. Development to be in conformity with respective Acts/Rules/Regulations.— (a) Every development shall conform to the provisions of relevant Acts, Rules and Regulations and appropriate Plan in force and no development shall be carried out without obtaining prior permission from the Competent Authority in the manner prescribed under these Regulations.
(b) Every building operation or sub-division of land shall be subject to the following general regulations, wherever applicable and no land shall be used as a site for development—
(i) If the site is found to be liable to liquefaction by the Goa State Disaster Management Authority under the earthquake intensity of the area, in such case it shall be ensured that the building site is away from such areas and a safe distance as advised by Goa State Disaster Management Authority is followed except where appropriate protection measures are taken.
(ii) If the Goa State Disaster Management Authority finds that the proposed development falls in the area liable to storm surge during cyclone, in such case it shall be ensured that the building site is away from such areas and a safe distance as advised by Goa State Disaster Management Authority is followed except where protection measures are adopted to prevent storm surge damage.
(iii) In hilly terrain, the site plan should include location of landslide prone areas, if any indicated in Goa Disaster Management Plan, on or near the site, in such case it shall be ensured that the building site is away from such areas and a safe distance as advised by Goa State Disaster Management Authority is followed except where protection measures are adopted to prevent landslides.
(iv) The site plan on a sloping site may also include proposals for diversion of the natural flow of water coming from uphill side of the building away from the foundation.
(c) Roof pattern in buildings.— All buildings in residential zone should have sloping roof 109[of each building], flat type roof 110[of each building] may be permitted up to a maximum extent of 111[50%] of covered area of the building.
4.2. Means of access to the building within the plot.— (a) Every person who erects a building shall provide a means of access to such building a clear way of not less than 3.00 mts.
(b) Such pathway shall be kept open to sky and no projection or overhang shall be permitted over it except a canopy or a balcony or a weather board or a chajja erected at least 2.50 metres above the ground level.
(c) Steps, ottas or any raised platforms shall not be permitted in such pathway.
(d) Every such pathway shall be paved, drained and adequately lighted.
109 Inserted vide Notification No. 21/1/TCP/2011/Part file/3252 dated 1-8-2011.
110 Inserted vide Notification No. 21/1/TCP/2011/Part file/3252 dated 1-8-2011.
111 Substituted vide Notification No. 21/1/TCP/2011/Part file/3252 dated 1-8-2011.
49–
(e) Any person who undertakes construction work or a building shall not reduce the width of such pathway to building previously existing below the minimum requirements prescribed under these Regulations.
(f) In case of level differences, the pathway could be in form of steps or ramp from the road level to the entrances of the building. In case of steps, the tread of the step shall not be less than 30 cms. and riser shall not be more than 20 cms. In case of ramp the gradient shall be less than 1:6 for driveway and 1:12 for pathway. In case of steps, adequate parking shall be provided nearby.
112[(g) Every person who erects a building with no side setbacks or with 1.5 mts. setback (or less) on both the sides, shall provide a means of access to the rear of (through) such building within the property, a clear way of not less than 4.5 mts. in width for non-high rise buildings and 6 mts. in width for high rise buildings for entry of fire fighting vehicle. Such means of access is to be maintained free from any obstructions and at no time shall any portion of the building be allowed to project or overhang into the passage below the height of 4.5 mts. If arch or covered gate is constructed, it shall have a clear headroom of not less than 5 meters.
113[{For buildings having side and rear setbacks as per Regulation 4.4.2, Table IV, the means of access to the rear is not required to be maintained. However, for high rise buildings, means of access to the rear of minimum 6.0 mtrs. or applicable setbacks, whichever is higher, is required to be maintained at least on one side. Further, access to the rear shall not be applicable to the plots covered under the regulation 4.7.}]
(h) The applicant shall indicate upon the site plan required to be furnished by him, the whole area of such means of access by distinguishing in colour and description.
(i) The person who undertakes development of a plot shall not do so as to deprive any other plot of land of its means of access or easement and shall not reduce such means of access to a width less than 3.0 mts. Such access could be through set back areas subject to the condition that no projection shall be permitted within this access. The area of such access shall not be deducted while computing the effective area of the plot.
(j) The applicant shall not at any time erect or cause to permit to be erected or re-erect any building/structure even temporarily, which in any way encroaches or diminishes the area so set apart for the purpose of public or traditional access.
4.3. Restriction on development within line of sight at the road intersections.— No development including construction of buildings, compound walls, erection of hoarding, etc. shall be permitted within the line of sight, upto 4.5 mts. height from the level of adjoining roads. Any obstruction existing within the line of sight, natural or/and manmade, shall also have to be removed from line before applying for occupancy certificate.
Further, no development shall extend beyond the imaginary line drawn by joining two points on the adjacent edges of the right of ways of the roads at a distance from the point of intersection of the side of the corner of the effective plot as given in the TABLE-II.
112 Substituted vide Amendment Regulations, 2018.
113 Substituted vide Amendment Regulations, 2019.
50–
TABLE-II
(Refer Sketch No. 3 at Chapter 28)
Right of way of road in meters
More than 30
More than 20 upto 30
More than 10 and upto 20
Less than 10
Distance from point of intersection in meters
10.00
7.50
5.00
4.00
4.4Front, Side and Rear Setbacks:
4.4.1. Front setback.— Every building shall have minimum front setback as per the TABLE-III given below:–
TABLE-III
Zone
Setback in meters
Residential - S1, S2, S3, S4,
3.00
Commercial - C1, C2, C3, C4
3.00
Industrial - I1, I2, I3,
5.00
Public and Transport - P, T,
5.00
Recreation - R
5.00
Agriculture - A1, A2,
10.00
114[Note: Whenever any use, other than residential is proposed in S1, S2, S3 or S4 zone, the front setback shall be minimum 5.00 meters if the plot is located on a road of width of less than 10 meters. In commercial zones, plots which are abutting roads 10 meters wide and less shall have front setback of 5 meters.]
4.4.2Side and Rear Setbacks.—
115[TABLE-IV]
Height of the building
Side/Rear Setbacks
(1)
(2)
7.60 m.
3.00 m.
9.00 m.
3.50 m
11.50 m.
4.00 m.
15.00 m.
5.00 m.
18.00 m.
5.50 m.
21.00 m.
6.00 m.
24.00 m.
6.50 m.
28.00 m.
7.40 m.
116[32.00 m.
8.00 m.
36.00 m.
8.00 m.]
114 Substituted vide Amendment Regulations, 2016.
116 Added vide Amendment Regulation, 2018(September).
115 Titled as Table-IV vide Notification No. 21/1/TCP/2011/Part file/3252 dated 1-8-2011.
– 51–
117[Note: After 36.00 mts. height the side/rear setbacks shall be increased by 1.00 mtr., for every 4.00 mts. additional height, provided further that the maximum setback which can be insisted by the authorities shall be atleast 15.00 mts., irrespective of the height of the building.]
118[(a) In existing Municipal areas notified prior to the commencement of these Regulations, the building may be allowed with the side setbacks less than those specified in table-IV limited to a minimum 1.5 meters provided that no light and ventilation is taken from that side. However, in densely built up existing areas, where neighboring building or building existing within the applicant‘s plot, are already touching the boundaries, the building may be allowed to touch the boundary or keep 1.50 meters or less on one or both sides, provided that no light and ventilation is taken from that side]
119[(b) In industrial estates/industrial areas minimum 3.00 mts. side setback shall be maintained in case the area of the plot does not exceed 1,000 sq. mts. and minimum 4.50 mts. side setback shall be maintained at least on one side for plot where the area of the plot exceeds 1,000 sq. mts.].
4.5. Restrictions on development within setbacks.— The setbacks, as required to be provided under these Regulations, shall be kept permanently open to sky and they shall not be used for stacking materials or loose articles for the purpose of trade or otherwise, nor they shall be used for putting up fixed or movable platforms or advertisement hoarding boards or neon sign boards or for such similar uses.
However, plantations/orchards, septic tanks, pump, well, gardening 120[, rain water harvesting/ground water recharge system] will be permitted in the said setbacks provided no structure shall impede the access and circulation of vehicles.
4.6. Projections within the setbacks.— Following projections shall be allowed within the setbacks provided that there is no obstruction/interference with line of sight or street furniture, fixtures, lighting, access, etc.
(a) Within Front setback.— (i) An un-storeyed porch/canopy/cantilevered stair landing projection, provided that a minimum setback of 2.00 meters is left between the R/W of the road/street and the extreme edge of the canopy, there is a clear distance of 2.50 meters between the ground and the bottom of the porch/canopy/stair landing, and no columns are located within the setback.
(ii) Balconies/verandah, floor projections which are cantilevered and there is a clear distance of 2.50 meters from the bottom of such projections and ground and 2.00 meters setback is left between the R/W of the road/street and such projection.
(b) Within Side and Rear setbacks.— Cantilevered weather board, sun shades, chajjas, balconies, canopies or stair landing projections, provided that they are at a minimum height of 2.50 meters from the ground, and not more than 1.5 m. in depth and not more 1/3rd of the side setback. The minimum height shall be 4.50 meters along the side giving access to the rear.
117 Inserted vide Amendment Regulation, 2018 (September).
118 Substituted vide Amendment Regulations, 2016.
119 Inserted vide Amendment Regulations, 2018.
120 Inserted vide Notification No. 21/1/TCP/2011/Part file/3252 dated 1-8-2011.
52–
(c) Security cabin of not more than a size of 6.00 square meters of 2.50 meters height provided it does not interfere with line of sight in a corner plot or road junction. Provided the main gate is partially recessed by at least 1.00 meter.
4.7. Further restrictions/relaxations.— (a) 121[For original survey plots or mundkarial plots or plots of approved layout having frontage up to 13.00 meters, construction of single dwelling units may be permitted with side setbacks of 1.50 meters allowing normal light and ventilation, provided the construction is limited to ground and one upper floor only and that no projection shall be permitted except of weather board, sun shades, roof projections or any architectural features not exceeding 30.00 cms. In case of multi-dwelling units, side setbacks can be relaxed to 1.50 meters on one side only with the above restrictions/control. Un-storied car porches of maximum length of 5.00 meters may be permitted to touch the boundary, provided rain water drain and disposal are within the plot.]
(b) When the construction is permitted to touch the boundary under clause 4.4.2 (b) in Municipal areas, the said setback shall be provided with a permanent wall/screen or any architectural feature, extending to the boundary, on the face of the building abutting the street, to maintain the continuity of the streetscape. An opening to serve as an emergency access only, may be provided in this wall/screen at the ground floor. This shall be applicable to any plot, irrespective of its size.
4.8. Distance between two buildings.— (a) The minimum distance between two buildings within the same plot shall not be less than three meters in case no ventilation or light is taken from facing sides.
(b) The minimum distance shall be half the mean height of the two buildings or three meters, whichever is more, in case light and ventilation is taken from facing sides and this distance shall be measured at point where such light and ventilation is taken. No projections shall be permitted within the minimum distance 122[except chajjas/weather boards].
4.9. Courtyard.— The sizes of the Courtyards provided in the development shall conform to the following provisions:–
(a) If light and ventilation is taken to the habitable rooms from a courtyard, then the minimum area of the Courtyard shall be 10.00 m2 and the smallest side shall be determined, as per the Table-IV for side setbacks given at 4.4.2 above.
(b) If light and ventilation is taken to non habitable rooms from a courtyard, then the minimum area of the courtyard shall be 6.25 sq. mts. with the smallest side not less than 2.50 mts. for courtyard having height upto 11.00 mts.
The minimum area of the courtyard shall be 9.00 sq. mts. with minimum side of 3.00 mts. for courtyard having height above 11.00 mts.
4.10. Regulations regarding development on sloping sites.— (a) When submitting plans for development of a plot which has a gradient of 1:10 or more, the plan should
121 Substituted vide Notification No. 21/1/TCP/2011/Part file/3252 dated 1-8-2011.
122 Inserted vide Notification No. 21/1/TCP/2011/Part file/3252 dated 1-8-2011.
53–
indicate block levels at 5.00 m. centre to centre or alternatively contour plans at 1.00 m. intervals.
(b) Block levels/contour plans are also to be submitted in case plot area exceeds 1000 sq. mts. for building operations.
(c) Block levels/contour plans are also to be submitted in case plot area exceeds 10000 sq. mts. for sub-division of land.
(d) The levels/contours should be drawn with reference to a bench mark clearly indicated on the site plan.
(e) No development shall be permitted if the gradient exceeds 1:4.
(f) The Chartered Surveyor or Civil Engineer shall certify the contour plans and shall be responsible for the accuracy of the said plan.
4.11. Development of Landlocked areas.— Development of any land locked area i.e. area without access or with inadequate access shall be governed by the following regulations:-
(a) If the area is accessible by a traditional access, passing through a property of different owner or is proposed to be made accessible by an access having a width of 3 m. or less, development shall be limited to a ground floor and one upper floor structure with a maximum floor area of 200 m2 to be used for residential use only. Such access shall have to be marked on the site plan.
(b) If the area is proposed to be made accessible by an access having a width of more than 4.50 m. but less than 6 m. development shall be limited to a ground floor and one upper floor structure with a maximum floor area of 350 m2 to be used for residential use only. Such access shall have to be marked on the site plan.
123[(c) If any property is made accessible by an access/road through a property of different owner by his voluntary consent, the area used for such access/road shall not be deducted from the effective area of the plot in which it is provided, for the purpose of coverage and FAR calculations provided that the width of such access is 3.00 meters or more and has concurrence of the Authority/Council/Panchayat.]
(d) In case such an access is not voluntarily made available, then the 124[Authority/ /Council/Panchayat/Town & Country Planning Department] at the request of the owner of the landlocked property, shall acquire the area of such access based on the micro planning of the area. The width of such access shall not be more than 6.00 meters and shall not render the plot unfit for development. The cost of acquisition of the area alongwith 5% service charges shall be borne by the said owner. The minimum service charges shall be Rupees five thousand or as decided by the Authority from time to time. If due to such acquisition, the owner is not able to develop his property with full benefit of FAR due to other restrictions like coverage, setbacks, etc., the 125[Authority/Council/Panchayat/Town & Country Planning Department] may relax such requirements on individual merit.
123 Substituted vide Amendment Regulations, 2016.
124 Substituted vide Amendment Regulations, 2023.
125 Substituted vide Amendment Regulations, 2023.
54–
4.12. Land Acquisition by the Competent Authority.— (a) The land zoned as P (public, semi public and institutional) and the land zoned as R (parks, playgrounds, recreational) may be acquired by the Competent Authority, to the extent of minimum size of plot specified in the Regulations of the said zones, at the request of the institution for the purpose of allowable development in the said zone.
(b) The land required for development of common facilities/services, such as a crematorium, cemeteries etc., for the uses as permitted in specific zones, may be defined and acquired by the Competent Authority on request of the Institution or local body.
Group Housing.— Group of buildings in an effective area of plot more than 4000 m² but less than 20,000 m²:
126[(a) When a plot, having an area of more than 4000 m2 but less than 20000 m2, is used for construction of building/group of buildings, an open space, as per the provisions in sub-division Regulations (12) shall be provided, in addition to the parking requirements. However, for calculating the coverage and FAR, the area of the entire plot, inclusive of the open space, shall be taken as effective plot area. However, this provision shall not be applicable to single family dwelling unit.]
(b) All the buildings should be provided with a minimum 127[ ] access of 3.00 m. and minimum setback of 1.50 mts. on either side of the access shall be applicable.
(c) All parking areas shall be accessible by an internal road having a minimum width of 6.00 meters. If such parking is provided within buildings, then the access to these buildings shall also be 6.00 meters and a setback of 1.00 meter from the road shall be necessary.
(d) A road of 6.00 m. width shall be extended to the rear of the plot or adjoining plot, in case the same is without an access. The general regulations regarding the road setbacks would not be applicable.
(e) Commercial use will be permitted as per the provisions of Regulation 6.A.1.
(f) 128[In case of plots exceeding 20,000 m2 in area, internal access roads shall be provided as per sub-division regulations or a hierarchy of roads shall be followed, subject to above Regulations 5 (a) to (d)].
(g) No part of building shall be allowed to be projected over the road/access including balcony.
Note: In case of high rise building the regulations applicable for fire safety shall be adhered to.
129[5A. Regulations for Shopping Mall cum multiplex.— (1) Definition:– ―Shopping mall cum multiplex‖ shall mean an integrated entertainment and shopping
126 Substituted vide Amendment Regulations, 2016.
127 Deleted vide Notification No. 21/1/TCP/2011/Part file/3252 dated 1-8-2011.
128 Substituted vide Notification No. 21/1/TCP/2011/Part file/3252 dated 1-8-2011.
129 Inserted vide Amendment Regulations, 2019.
55–
Centre/Complex consisting of small retail outlet, food courts, pubs, bowling alleys, restaurants, fast food outlets, health spas/centers, convention centers, hotel, IT and ITES, recreational activities, etc., with at least 2 cinema hall screens either within the complex or in a separate building within the compound of the complex.
(2) Site requirement for shopping mall cum multiplex:– (i) The minimum size of plot for a new shopping mall cum multiplex complex shall be 10,000 sq. mts.;
(ii) The minimum abutting road width for a shopping mall cum multiplex complex shall be 15 mts. existing.
(3) Location criteria:– (i) The location of a shopping mall cum multiplex complex shall be in a notified commercial area as per the statutory plans in force. The project shall be further subject to the requirements of,—
(a) a traffic impact study and a traffic management plan, for such complex undertaken through a qualified consultant in traffic and transportation.
(b) NOC from the Director of Fire and Emergency Services for considering the building permission by the Authority granting the permission.
(4) General:–
Plot area – 10,000m2
Coverage – 50%
FAR – As per the permissible FAR in respective zone.
Height – Maximum height permissible shall be as per the permissible limits within the respective zones. Maximum height of shopping mall cum multiplex having assembly occupancy shall not exceed 30 mtrs. or the height permissible in the respective zones, whichever is less. However, relaxation in height could be considered with the approval of the Town and Country Planning Board for creating iconic or landmark tower which would have tourist/public attractions and would enhance the image of the city by following setback requirements up to a maximum height of 50.00 mtrs. only in C1 Special Zone (C1 Special), Commercial Special Zone (CS) and Special Commercial Zone (SPC). This relaxation in height is subject to condition that uses in the tower shall be of non-assembly occupancy. If such tower is attached to the main shopping complex cum multiplex, it should have separate entry and exit from the ground level and overall height of the building including the tower shall not exceed 50 mtrs. If the tower like building is proposed as detached building within the same compound of the complex, maximum height of 50 mtrs. could be considered, independently. The relaxation in height will be further subject to the condition that the tower like building shall not cover more than 33% of the overall plinth area of shopping mall cum multiplex.
Note: The additional height upto 50 mtrs. can be permitted subject to availability of fire equipments capable of handling high rise building of such magnitudes by the Director of Fire and Emergency Services. However, exemptions could be considered in case the prospective developer donates the equipments as required by the Government and make available in house fire fighting facilities within the complex.
(5) Parking:— One equivalent car parking space shall be provided for every 35 sq.mtrs. of built up area of the shopping mall cum multiplex.]
56–
6. Zoning Regulations and use provisions.—
6.1. Introduction.— To regulate the development in terms of FAR, coverage, use of building, height of building, and other zoning regulations, and the use of the plot within the zone/use designated in—
(a) Regional plan of Goa.
(b) Development Plans (Notified).
(c) Development Plan of Withdrawn Notified Areas.
(d) Part-Regional Plan/Zoning Plans/Town Planning Scheme or any other plan prepared for development control as the case may be.
6.1.1. The following Regulations shall be applicable in the respective zones.— 130{The following Regulations shall be applicable in the respective zones:
(a) Regional Plan for Goa: The settlement zone areas means the areas which could be brought under development for various uses and the compatibility of the said uses/zones within the settlement level plans. FAR applicable shall be as per Table-V given below.
TABLE – V
VP Status
Area of Plot
FAR permitted
Height
VP1
Area below 4000 m2
80
As per S2/R2
131[ ]
VP2
Area below 4000 m2
60
9.00 mts. including stilt
132[ ]
Note: 133[(1)] The above shall be applicable for all types residential, commercial, industrial and institutional buildings.
134[(2) The Government on recommendation of the Town and Country Planning Board shall grant additional height and FAR to the proposals on case to case basis in consideration of the locational aspect, nature of development, use proposed, information available and on any such other criteria, if required. Such relaxation shall however not be relaxed for more than 20% permitted in the prevailing Regulations.].
Any other provisions, the interpretation of which is not clear, shall be referred to the Chief Town Planner/Member Secretary, Town and Country Planning Board of Government of Goa and interpretation given by Town and Country Planning Board shall be treated as final and shall form part of these Regulations.
(b) Outline Development Plans/Comprehensive Development Plans: These are plans as notified/to be notified for existing planning areas declared under Section 18 of The Goa Town & Country Planning Act, 1974. These Regulations shall be applicable for all developments.
130 Substituted vide Notification No. 21/1/TCP/2011/Part file/3252 dated 1-8-2011.
131 Omitted vide Amendment Regulations, 2023.
132 Omitted vide Amendment Regulations, 2023.
133 Numbered vide Amendment Regulations, 2023.
6A. Regular Zones.—
6A.1. Land use zones.— In these regulations, the land use shall be as per TABLE-VII given below, for the zones marked in the Regional Plan/Outline Development Plan/Sub-Regional Plan/Zoning Plan/Town Planning Scheme.
136[Outline Development Plan shall have two additional land use zones i.e. a Special Residential Zone and Special Commercial Zone having FAR of 200 and 300 respectively.]
135 Substituted vide Notification No. 21/1/TCP/2011/Part file/3252 dated 1-8-2011.
136 Inserted vide Amendment Regulations, 2018.
58–
TABLE-VII
USE
ZONE
I
Residential
Urban Settlement
S1
Residential
Settlement
S2
Residential
Settlement
S3
¹³⁷ Residential
Settlement
S4
Special Residential
SPR]
II
Commercial
Central Commercial
C1
Commercial
Local Commercial
C2
Commercial
Rural Central Commercial
C3
¹³⁸ Commercial
Rural Local Commercial
C4
Special Commercial
SPC
Commercial
Central Commercial Special
C1
Special;]
III
Industrial
Light Industrial
I-1
Industrial
Medium Industrial
I-2
Industrial
Heavy Industrial
I-3
IV
Public/Semi-public/Institutional
Public/Semi-public
P
V
Transport, Warehousing & Communication
Transport
T
VI
Parks, Playgrounds, Recreational
Recreational
R
VII
Agriculture
¹³⁹
Orchard/Natural Reserve
134 Inserted vide Amendment Regulations, 2023.
57–
(c) Outline Development Plans of withdrawn planning areas/Zoning Plans: These are the areas for which Outline Development Plans were prepared, when they were notified as planning areas and subsequently withdrawn/de-notified under Section 19 of The Goa Town & Country Planning Act, 1974. As the planning areas were de-notified (reduced) and as per Government decision, the ODPs prepared remained in force. These Regulations shall also be applicable for these areas/plans for all developments. In such areas outside Planning & Development Authority jurisdiction, zone with FAR‘s beyond 80 if specified shall be reduced by 20% for development of plot areas of 4,000 m2 and above. For example, 100 shall be 80, 150 shall be 120, 120 shall be 96.}
(d) Part-Regional Plan/Zoning Plan/Town Planning Scheme: For the zoning plan/ /regional plan/town planning scheme and any other plans prepared and in force, the use provisions in those plan areas will be as per TABLE-VI below:
Note: In such areas outside the jurisdiction of Planning & Development Authorities where F.A. R.s are specified more than 80% such F.A.R.s shall be reduced by 20% for development of plots with areas of 4,000 m2 and above.]
Provided, that if any person intends to develop land in Goa that is not specifically zoned or marked for specific use, or is according to the applicant wrongly designated, the relevant Competent Authority under the Act shall, after giving opportunity to the aggrieved person/persons to present their view point, refer the matter to the Government and the Government may, subject to the provisions of the relevant Act, Rules and Regulations, permit such development, subject to conditions as may be directed to be imposed.
Orchard and Natural Reserve]
A1A2
IX
Conservation
Superimposed zone
F
Notes:–140[(1) In case of SPC, C1 Special, C1, C2, C3 and C4, residential use shall be permitted on upper floors and ground floor above stilts.]
(2) IT/ITES shall be allowed in S1 to S4, C1 to C4, I 1 to I 3 and P zones and on all plots/premises fronting on roads having width more than 10 meter with a maximum FAR of 150.
(3) In IT Parks established by Department of Information Technology, Government of Goa, IT/ITES shall be allowed on all plots/premises fronting on roads having width more than 10 meter with a maximum FAR of 150.
(4) In Public/Semi Public/Institutional Use, Zone P building shall be allowed with FAR of 100 on all plots fronting roads having width less than 8 meter, on roads having width of more than 8 meter the FAR shall be 125. The maximum height of building in Zone P shall be 16 meters.
Note:– In special cases with the approval of T&CP Board and approval of the Government the maximum FAR of 150 could be permitted on case to case basis.
137 Added vide Amendment Regulations, 2019.
138 Added vide Amendment Regulations, 2019.
139 Substituted vide Notification No. 21/1/TCP/2011/Part file/3252 dated 1-8-2011
140 Substituted vide Amendment Regulations, 2019.
59–
(5) Any changes/interpretation regarding land use in various zones given by the Town and Country Planning Board from time to time shall be read as part of these Regulations.
6A.2. Provisions governing the uses.—
6A.2.1. Uses prohibited: (Except those permitted with restrictions).— (a) Zones 141[SPR, S1, S2, S3 & S4]:
Wholesale trade, warehousing, all kind of industries, gas works, fabrication and assembly workshops, scrap yards, transport agencies, go-downs, automobile workshops.
142[Fabrication unit, glass cutting unit, cement godown, tyres vulcanization units, flour/masala mills, light engineering activities involving noise making machinery, offset printing press, only those chicken/mutton stalls which involves slaughtering, only those restaurants with bar, conducting business beyond 11 p.m., carpentry workshop engaging heavy machinery and shops undertaking reconditioning of batteries.]
(b) Zones 143[SPC, C1 Special, C1, C2, C3 & C4]:
Extensive heavy and noxious industries and gas works.
(c) Zones I-1, I-2 & I-3:
(a) I-1:
Extensive, heavy and noxious industries.
(b) I-2:
Noxious and hazardous industries.
(c) I-3:
All uses other than industries with exception of those permitted with restrictions.
(d) Zone P:
All kinds of industries, wholesale trade, warehousing, storage provided the land is not owned by the Government.
(e) Zone T:
Theatres, Auditorium, Cultural and religious institutions, heavy, noxious & hazardous industries, sports stadia, crematoria, cemeteries, burial grounds and other uses permitted under other zones.
(f) Zone R:
All uses permitted under other zones.
(g) Zone A1 & A2:
All uses other than agriculture, horticulture, farming and allied operations.
(h) Zone F:
All uses prohibited in the basic zone, since this is a superimposed zone.
141 Substituted vide Amendment Regulations, 2019.
142 Inserted vide Amendment Regulations, 2018.
143 Substituted vide Amendment Regulations, 2019.
60–
6A.3. Uses permitted.— All uses which are not specifically prohibited or not covered in the category of uses with restrictions as per regulation above shall be permitted.
6A.3.1. Uses permitted with certain restrictions.— (a) Zone 144[SPR, S1, S2, S3 & S4]:
145[(i) Uses such as retail trade, banks, post offices, administrative offices, tailoring shops, laundry, hair cutting saloons, beauty saloons, IT/ITES establishments, kindergarten/crèche, abutting on main street and professional offices including IT/ITES shall be permitted as auxiliary to the main use:
Provided, that the total covered area occupied for such uses, shall not exceed 50% of the proposed covered area, if the property derives access from a road having 8.00 meters right of way or more:
Provided further that if more than one building is proposed, then all the proposed area for commercial use as above, may be located either in one building or more than one building, as desired by the owner.]
(ii) In addition to the above, use of personal residence to the extent of 10% of the carpet area of the residence could be allowed to be used as professional office including IT/ITES shall be allowed on all plots/premises fronting on roads having width more than 10 meter.
(iii) Rice and flour mill shall be permitted on ground floor only, with no floor above, not occupying an area in excess of 25 m2 and not employing more than 5 persons, is driven electrically and the motor capacity does not exceed 15 H.P.
(iv) Bakeries on ground floor, not occupying an area in excess of 75 M2 and not employing more than 9 persons, if the power requirement does not exceed 4KW, where only electrical equipment is used and additional heating load upto 12KW is permitted.
146[(v) In case of group housing, the commercial use may be allowed in one or more buildings on upper floors restricted to 50% of the proposed coverage, provided building is abutting the public road.]
Nursing Homes/Hospitals or Doctor‘s Clinic with in patient wards, cultural, educational and religious institutions as main use and their administrative offices in the entire building:
Provided that the plots have an area of more than 300 m2 with a frontage of 15.00 m.: and
Provided further that the plots should be accessible by a road having a minimum width of 8.00 m. and minimum front setback of 5.00 m. is maintained.
Provided that the plots have an area of more than 500 m² with frontage of 20.00 m.:
Provided further that the plots shall be accessible by a road having a minimum width of 8.00 m. and a minimum front setback of 5.00 m. is maintained.
(d) Zone 149[{ SPC, C1 special, C1, C2, C3, C4}]:
Service workshops, service industries, and light industries, only as auxiliary to main use. 150[ ].
(e) Zone I-1, I-2, I-3:
Residences for staff, administrative office, canteens, medical centers, banks, convenience shopping, only as auxiliary to the main use, upto the extent of 15% of the permissible floor area ratio (FAR). 151[The retiring room/rest room/changing room for staff, administrative office, canteen, medical centers, only as auxiliary to the main use upto the extent of 15% of the built up area in case of industrial estates/industrial areas. Provided that no permission shall be given for 152{accommodation for staff}, unless the area of the plot exceeds 153{5,000 m2} and where maximum 154{7.5%} of built up area is permissible.]
(f) Zone P:
Canteen, banks, convenience shopping and staff residences, only as auxiliary to the main use, to the maximum extent of 25% of permissible Floor Area Ratio (F.A.R.), provided the land does not belong to Government.
(g) Zone T:
Boarding houses, restaurants, professional offices, residences for watch and ward and utility services, retail trade, only as auxiliary to the main use, to the maximum extent of 25% of permissible Floor Area Ratio (FAR).
(h) Zone R:
Restaurants, public utilities incidental to main use, room for watch and ward, only as auxiliary to the main use, to the maximum extent of 5% of the effective area of the plot, PROVIDED that the structures are single storied only.
(i) Zone A1 & A2:
155[(i)] Roads and sub-division of lands for agricultural purposes only subject to specific restrictions in the regulations for sub-division of land 156[ ].
157[(ii)] Uses ancillary to agriculture such as irrigation, land reclamation, pump and
149 Substituted vide Regulations, 2019 and Omitted vide Corrigendum No. 21/1/TCP/2021/Steering Committee dated 9-11-2021.
150 Deleted vide Notification No. 21/1/TCP/2011/Part file/3252 dated 1-8-2011.
151 Inserted vide Amendment Regulations, 2018.
152 Substituted vide Amendment Regulations, 2023.
153 Substituted vide Amendment Regulations, 2023.
155 Numbered vide Amendment Regulations, 2023.
157 Numbered vide Amendment Regulations, 2023.
156 Deleted vide Notification No. 21/1/TCP/2011/Part file/3252 dated 1-8-2011.
62–
other electrical installations, bio-gas plants, farm houses, poultry, 158[dairy and processing units allied to agro products].
159[(iii) Uses such as Agricultural Research Centre/Development Centre/ /Agricultural Educational Institute/Educational Institute/Bio-Technology unit shall be permitted provided that the plot has minimum area of 2,00,000m2, the maximum Coverage, FAR and height of building permissible shall be 5%, 5% and 7.60 m respectively.
(iv) Yoga or meditation centre shall be permitted provided that the plot has minimum area of 50,000m2, the maximum Coverage, FAR and height of building permissible shall be 5%, 5% and 7.60 m respectively.]
Note: (applicable to all zones)
(1) The development charges will be as applicable to the Zone or to the use whichever is higher.
(2) Development charges shall be applicable for the mezzanine floors also.