(a) No connection from any source of public electric supply to any electric supply installation in any new construction/re-construction/alteration as specified in these rules shall be sanctioned by the Electricity Department without or prior to the sanction of construction licence/completion certificate by the Competent Authority.
(b) In buildings where multiple connections are likely to come up, the owner/ /promoter of the building shall assure a built-up premises of 2 x 2 sq. meters, nearest to the public road in the ground floor. Buildings having 1000 m2 of floor area or above have to compulsorily provide built-up room of size 2 mts. x 3 mts. with fire barriers on the ground floor nearest to the public road to put transformer and distribution board or as may be permitted by Electricity Department.
229 Inserted vide notification No. 21/1/TCP/2015/Steering Comm/16/5145 dated 21-12-2016.
111–
(c) Whenever underground system exists, any person or persons intending to construct multi-storied building or buildings, having a carpet area of 1000 m2 or more, shall require to enter into an agreement with the Government, wherein he will give an undertaking that he or she or they will provide on the ground floor, an outhouse facing the public road, built-up premises of area of 21 m2 (7mts. x 3mts.), for setting up departmental indoor sub-station and control switch gear or as may be permitted by Electricity Department.
The said premises shall be placed at the disposal of the Electricity Department and the Department shall reserve the right to extend supply to any consumer by laying underground/overhead electric lines from the said indoor sub-station.
(d) Any building or structure whether permanent or temporary shall maintain clearances from the electric lines as specified in the TABLE-XX below.
TABLE-XX
Detail of clearance
Distance in meters
Vertical clearance
a) For high voltage lines upto and including 33000 volts.
3.70
b) For extra high voltage lines
3.70 plus 0.30 for every additional 33000 volts or part thereof.
Horizontal clearance
a) for high voltage lines upto and including 11000 volts
1.20
b) for high voltage lines above 11000 volts and upto and including 33000
2.00
c) for extra high voltage
2.00 plus 0.30 for every 33000 volts or part thereof
Chapter 14Building Services.—
14.1 Water Supply and Sanitary Installation:
14.1.2 Water Supply:
(a) All premises intended for human habitation, occupancy or use group shall be provided with the supply of pure and wholesome water, neither connected with polluted or unsafe water supply nor subject to the hazards of back flow or back siphonage;
225 Omitted vide notification No. 21/1/TCP/2011/Part file/3252 dated 1-8-2011.
226 Inserted vide notification No. 21/1/TCP/2011/Part file/3252 dated 1-8-2011.
227 Substituted vide Amendment Regulations, 2023.
106–
(b) No connection from any source of public water supply to any water supply installation in any new construction/re-construction/alteration as specified in these rules shall be sanctioned by the P.W.D. (Water Supply) Division without prior sanction of construction licence/occupancy certificate by the Competent Authority.
(c) Application for the supply of water supply connection may however, be entertained without insisting on production of a No Objection Certificate from Competent Authority as prescribed at (b) above, provided that the applicant fulfils all the formalities as required by the PWD–Water Supply Division and tenders an undertaking to the effect that connection so granted shall in no way give any legitimacy to any such construction or structure, which if unauthorized or illegal shall continue to be so even after such connection is released.
(d) The design of the pipe system shall be such that there is no possibility of back-flow towards the source of supply from any cistern or appliance whether by siphonage or otherwise and reflux or non-return valves shall not be relied upon to prevent such back flow.
(e) Where a supply of wholesome water is required as an alternative or standby to a supply of less satisfactory water or is required to be mixed with the latter, it shall be delivered only into a cistern and by pipe or fitting discharging into an air gap at a height above the top edge of the cistern equal to twice its nominal bore and in no case less than 15 centimeters. In all appliances or taps used in water closets a definite air cap shall be maintained.
(f) The bottom of the water service-pipe at all points, shall be at least 30 centimeters above the top of the sewer-line at its highest point, if laid closer than 30 meters horizontally from the building sewer.
(g) No pipe, carrying wholesome water, shall be laid or fixed so as to pass into or through any pipe or fitting, secure outlet or drain or any manhole, connected therewith nor through any ash pit, manure pit, fouled, soiled or porous material or any material of such nature that is likely to cause deterioration of the pipe. Provided that where the laying of such pipe is unavoidable, the piping shall be properly, protected from contact with such soil, material or surrounding matter by being carried through an exterior cast-iron tube or by some other suitable protective covering as approved by Panchayat or P.W.D. (Water Supply) Division. Provided further that any existing piping or fitting laid or fixed which does not comply with the above requirements, shall be removed immediately by the owner and re-laid by him in conformity with the above requirements and to the satisfaction of the P.W.D. (Water Supply) Division.
(h) All pipes including all bends, junctions, tees and elbows and all fittings used in connection with, or forming part of the sanitary installations of a building shall be made of such material and be of such weight and pattern be fixed, joined and painted in such a manner as per specifications laid down by P.W.D.
107–
(i) The planning design and installation of water supply system shall conform to Part IX–Plumbing Services, Section I-Water Supply of National Building Code of India, 2005 unless otherwise specified in these rules.
(j) The per capita requirement of water supply for various occupancies shall be determined as specified in TABLE-XIX below. The overhead tanks shall have adequate capacity of storage for flushing as well as domestic storage.
TABLE-XIX
Per Capita requirements -
Group
Type of occupancy
Consumption per head per day in liters
Group
Residential
135
A1
Group
Special Residential
180
A2
Group B
Educational a) Day schools b) Boarding schools
45135
Group C
Institutional/Medical a) No. of beds not exceeding 100 b) No. ofbeds exceeding 100 c) Medical quarters and hostels
340450135
Group D
a) Assembly (per seat of accommodation) other than restaurants b) Assembly (per seat of accommodation) for restaurants
1570
Group E
Government or Semi-Public
45
Group F
Mercantile business (Commercial) a) Restaurants (per seat) b) Hotels with lodging accommodation (per bed) c) Other business buildings
7018045
Group G
Industrial
45
Group H
Storage (including Warehousing)
30
Group I
Hazardous
30
(k) A tank or cistern for storage of water shall be water tight properly covered over and shall be constructed of reinforced concrete; G.I. steel, stone masonry or brick work in cement mortar and shall be rendered inside with cement mortar.
(l) In the case of underground storage tanks, the design of the tank shall be such as to provide for the drainage of the tank when necessary and water shall not be allowed to collect round about the tank.
(m) The tank shall be provided with, an overflow pipe, tap or other apparatus, the invert of which shall not be less than 5 centimeters higher than the bottom of the tank.
(n) The tank shall be provided with a draw off which shall-
(i) be so located and fitted as to prevent entry of animals and insects;
108–
(ii) not be connected to a drain or sewer;
(iii) have an open end to permit the overflow pipe to serve as a warning pipe.
(o) All water mains, communication pipes, service and distribution pipes used for water for domestic purposes shall be thoroughly and efficiently disinfected before being taken into use and also after every major repair.
(p) Overhead water tanks and sumps should be provided with mosquito proof lids and their vents shall be covered with mosquito proof nylon mesh. All the structures created for water supply i.e. over head tanks/loft over head tanks and sumps has to abide by the provisions of the design and specifications as laid down in Goa Public Health Act, 1985 (Goa Act 25 of 1985) for prevention of Vector Borne Diseases.
(q) The extent of water to be stored for the fire fighting purpose in the case of multi-storeyed buildings shall be in accordance with Part IV, Fire Prevention and Fire Protection of National Building Code of India, 2005 or as amended from time to time.
14.1.3 Wells:
(a) Wells intended to supply water for human consumption or for domestic purpose shall be–
(i) Not less than 15 meters away from any ash pit, refuse pit, soak pit, earth closet or privy and shall be located on a site upward from the earth closet or privy;
(ii) so situated that contamination by the movement of sub-soil of other water is unlikely;
(iii) of a minimum internal diameter of not less than 1.00 meter;
(iv) of permanent and sound quality construction throughout.
(b) Wells without internal lining shall be permitted only in fields and gardens for purpose of irrigation.
(c) The parapet wall on the head of all wells shall be raised to height not less than 1 meter above the level of the adjoining ground to form a parapet or kerb with a minimum thickness of 20.00 centimeters and shall be surrounded with a paving constructed of impervious material which shall extend for a distance of not less than 1.00 meter in every direction from the parapet framing the well head and the surface of such a paving shall be sloped outward from the well. All such structures created has to abide by the provisions of the design and specifications as laid down in Goa Public Health Act, 1985 (Goa Act 25 of 1985) for prevention of Vector Borne Diseases.
(d) The interior surface of the well or lining of the well shall be rendered impervious to a depth of 3.00 meters measured from the level of the ground immediately adjoining the well head.
109–
(e) A well from which water is drawn by means of a bucket or other similar means shall be provided with a stand for the bucket raised not less than 15.00 centimeters above the level of the paving.
14.1.4 Drainage and Sanitation:
(a) No person shall install or carry out any water-borne sanitary installation or drainage installation or any work in connection with any existing or new building or any other premises without obtaining the previous sanction of the Competent Authority.
(b) Every sanitary/drainage installation from any existing building shall be connected to a public sewer wherever available. All the structures created for Drainage and Sanitary installation i.e. inspection chambers and septic tank has to abide by the provisions of the design and specifications as laid down in Goa Public Health Act, 1985 (Goa Act 25 of 1985) for prevention of Vector Borne Diseases.
(c) No connection to any public sewer line from any new construction/ /reconstruction/alteration as specified in these rules shall be sanctioned by the PWD-Sewerage Division prior to the sanction of building permit/Occupancy Certificate by the Competent Authority.
(d) Wherever public sewer is not available, the sanitary installation shall be connected to septic tank/soak pit and the drainage of waste water to a soak pit or any other waste water recycling/treatment unit of adequate size, to be located within the plot in such manner that it is away from any existing well or water body 228[indicated on the survey plan].
(e) The drainage from the water closet compartment shall be connected to the septic tank through a system of pipes and inspection chambers, laid to a slope sufficient enough to ensure smooth flow.
(f) The drainage of waste water from the bathrooms, kitchen and any other source shall be connected to the soak pit or any other waste water recycling/ /treatment unit through a system of pipes and inspection chambers, laid to a slope sufficient enough to ensure smooth flow.
(g) The size of septic tank and soak pit should be proportionate to the number of users. Following design criteria are recommended by the Directorate of Health Services for the Septic Tank:-
(i) Capacity-A capacity of 20 to 30 gallons (2.5 cft to 5 cft) per person is recommended for household septic tanks. The minimum capacity should be 500 gallons. Septic tanks are not recommended for large communities.
(ii) Length/Breadth-The length shall usually be twice the breadth.
228 Inserted vide notification No. 21/1/TCP/2011/Part file/3252 dated 1-8-2011.
110–
(iii) Depth-It should vary from 1.50 mts to 2.00 mts.
(iv) Liquid depth-The recommended liquid depth is only 1.20 mts.
(v) Air space-There should be a minimum air space of 30 cm. between the level of liquid in the tank and the under surface of the cover.
(vi) There should be an inlet and outlet pipe which would be submerged.
(vii) Cover-The septic tank shall be covered by a concrete slab of suitable thickness and provided with a manhole.
(h) The planning, design and installation of all drainage of waste water and sanitary installation shall conform to Part IX, Plumbing Services, Section 2, Drainage and sanitation, of National Building Code of India, 2005, as amended from time to time, unless otherwise specified in these rules.
(i) Every room to be used as Kitchen shall have facility for the washing of kitchen utensils, the exit pipe of which shall lead directly to, or through a sink, to a grated and trapped connection to the waste disposal pipe-Provided that this facility may not be installed, if separately provided in a pantry.
(j) Sinks: Sink shall be so located that at least one of its sides shall be against an external wall or in a window recess or in a position to ensure suitable plumbing. Sinks shall be constructed of glazed stoneware, enameled, stainless steel, fire clay or other equally suitable material. Sinks shall be of such shape as will facilitate their maintenance in a state of cleanliness. No woodwork shall be used for covering any such sink. The bottom of the sink shall slope towards the outlet.
229[14.1.5 Sewage Treatment Plant.— Sewage Treatment Plant is mandatory for residential complexes having 50 flats/residential units and above. Sewage Treatment Plant will not be required if the area is already served by existing sewer lines.]
14.3Other Services:
14.3.1 Solar water heating/Solar energy capturing system in buildings:
The Ministry of Non-Conventional Energy is encouraging use of solar water heating/solar energy capturing system in buildings. This should be considered while designing the buildings keeping in view the saving in normal electricity consumption or for heating of water.
Schemes covering Government subsidy for such installation should also be considered.
Note: The Government may decide to give incentives in form of a rebate in infrastructure tax to be assessed and collected on the building in addition to the subsidy on such installation under the Schemes of Ministry of Non-Conventional Energy.
112–
(a) No new building in the following categories in which there is a system of installation for supplying hot water/Solar energy capturing system, shall be built, unless the system or the installation is also having an auxiliary solar assisted water heating system:—
(i) Hospitals and Nursing homes with ten or more beds.
(ii) Hotels, lodges and guest houses with twenty or more beds with twenty or more beds.
(iii) Hostels/Dormitories/arracks of Schools, Colleges, Training centers and others.
(iv) Group Housing having 50 and more units.
(v) Functional buildings of railway stations and airports like waiting rooms, retiring rooms, rest rooms, Inspection bungalows and catering units.
(vi) Community centre/Hall, Banquet halls, and buildings of public assembly and similar use.
(b) Installation of solar water heating system/Solar energy capturing system:—
(i) New buildings – All building plans shall indicate on roof top, adequate space for installation of the solar water heating system, Solar energy capturing system and water supply to the same as per requirements.
(ii) Existing buildings-Installation of solar assisted water heating systems/ /Solar energy capturing system in the existing buildings shall be mandatory in case the use is proposed to be changed to the above said categories.
(iii) Industrial buildings - Installation of solar assisted water heating systems/Solar energy capturing system in the buildings is mandatory.
230[(c) Norms for roof top solar PV installation shall be as under:–
Sl. No.
Category of building/area
Area standards
Generation requirement
(1)
Group Housing
all proposals of Group Housing having more than 40 dwelling units
Minimum 5% of connected load or 20W/sqft for available roof space, whichever is less.
All other buildings defined under clause (20A) of regulation 2 (mandatory for buildings having shadow free rooftop area > 50 sq.mt.).
(2)
Educational
Plot size of 500 sq.mt. and above
Minimum 5% of connected load or 20W/sq. ft. for available roof space, whichever is less.]
(3)
Institutional
(4)
Commercial
(5)
Industrial
(6)
Mercantile
(7)
Recreational
230Inserted vide Amendment Regulations, 2019.
113–
14.3.2 Rain Water Harvesting:
231[Rain water harvesting tank for storage and re-use of water shall be mandatory for private buildings in case the plot area is more than 4000 sq. meters and having 40 units and more for secondary use such as flushing of WC, gardening, landscaping, car washing and the like through a separate parallel line in the plot/premises. Similarly, for public/institutional buildings/complexes in plots having areas of more than 4000 sq. meters and having a floor area of more than 2000 sq. meters and all commercial/industrial developments in plots having areas of more than 4000 sq. meters shall be provided with rain water harvesting tanks for storage and re-use. In all other constructions, such provision shall be recommendatory. For availing subsidies, the provisions of rain water harvesting policy notified by the Water Resources Department shall be complied with].
However, Rain Water Harvesting for recharging of ground water specially deep aquifers shall be permitted in areas identified and designated for the purpose in the State of Goa by the Water Resource Department, Government of Goa.
The details of the structures and their design shall be as per the provisions indicated in Annexure-V (27.V).
232[Rain Water Harvesting in industrial estates and industrial areas shall be decided by Goa Industrial Development Corporation as per availability of space and requirement in each case.]
233[14.3.3. Arrangement for treatment of waste:—
Arrangement for treatment of biodegradable waste through aerobic, vermin composting or bio-gas plant shall be mandatory for development of group housing schemes in plots having area of more than 4000 sq. meters and having 40 units and more. Structures for covering the chambers for sorting the waste having a height of not more than 2.5 meters and open on at least two sides shall be excluded from coverage and FAR calculation and also from setback distances. Designated spots for collection and treatment of non bio-degradable waste shall be shown in the site plan.]
234[14.3.4. In Building Solutions for Common Telecommunication Infrastructure (CTI):
A. Multi dwelling units, commercial complexes, public buildings and Transport facilities:
New building constructions shall have to properly demarcate section (area) within buildings and on roof tops for installing broadband/digital connectivity infrastructure/antenna. These areas should have access to power supply for reliable, un-interrupted services.
Provisions of In-building Solutions (IBS) components in building premises:
231 Substituted vide notification No. 21/1/TCP/2011/Part file/3252 dated 1-8-2011.
232 Inserted vide Amendment Regulations, 2018.
233 Inserted vide notification No. 21/1/TCP/2011/Part file/3252 dated 1-8-2011.
234 Inserted vide Amendment Regulations, 2023.
114–
(a) Entrance facilities (EF)/lead-in conduits: Minimum 1.2m x 1.83m space to be allocated for each Telecom Service provider adjacent to the EF, if a separate space is required for service providers.
Underground conduits/pipes to Main Distribution Frame room shall be through min 100mm dia encased conduits.
(b) Main Distribution Frame (MDF)/Equipment Room: The minimum recommended size for ER is 14m2 with L:W ratio between 1:1 to 2:1, with proper lighting for vision of equipments and ventilation of room. This room shall be located at a level above from the Natural Ground Level to avoid incidence of flooding. Necessary Electric distribution panels, isolaters, sockets and earthing shall be provided as per specific requirements.
(c) Telecommunications Room (TR): At each building block unless provided with MDF Room with appropriate numbers and size (length x width) of Service/Telecom risers (vertical shafts) for all multi-storeyed buildings w.r.t. the area proposed for Coverage (DUs/service subscribers) with access door at each floor.
(d) Telecommunications Enclosures (TE): At each floor of a block or TR.
(e) (i) Telecom room space norm for buildings with built-up area (floor space) greater than 465 sq. mts.
Sl.No.
Area* to be covered by IBS
Size ofTelecom Room (all dimension in m)
1
Upto 465 sqmt
3.0 x 2.4
2
465.0 sqmt to 930.0 sqmt
3.0 x 3.4
3
More than 930.0 sqmt
Additional TR required with same space rooms
*usable floor space to be served.
(ii) Space requirements for smaller buildings with built-up area less than 465 sq. mts.
Sl. No.
Area to be covered by IBS
Space provisions (all dimensions in m)
1
Upto 93.0 sqmt
Wall cabinets, self-contained enclosed cabinets
2
93.0 sqmt to 465.0 sqmt
Shallow Room (0.6 x 2.6)
Walk-in Room (1.3 x 1.3)
For the purpose of floor area calculation, the above said room area(s) of IBS components in building premises shall be exempted as per sub regulation (63) (k) of regulation 2.
Occupancy certificate/Completion Order to a building shall be granted only after ensuring that an undertaking is given by the Architect or Engineer or other professional who is competent to submit application for issue of completion order/occupancy certificate under GLDBCR-2010 certifying that building has ensured common access to all digital infrastructure to all service provider at building level and in-building components are in accordance with plan of creation of CTI.
115–
B. At layout level (sub-division): (1) Layout plans should clearly indicate the telecom as utility infrastructure lines. Telecommunication cables should be placed in a duct/pipe that can be accessed at frequent service points with sufficient spare capacity to enable scaling and future expansion and empty popes (large size hume popes/HDPE pipes) should be laid before planting trees in order to accommodate additional infrastructure.
(2) Telecommunication cables should ideally be placed below the parking area or service lane. Where this is not possible, the cables may be placed at the outer edge of the right-of-way. Telecom boxes if required, should be placed after leaving 2m space for pedestrian path (foot path).
(3) Final NOC for sub-division shall be granted after ensuing that an undertaking is given by the Architect or Engineer or other Professional who is competent to submit application for issue of NOC for sub-division under GLDBCR-2010 certifying that the layout has all the Telecommunication cables to service provider in accordance with plan of CTI.
(4) For any other necessary detailing of building components and service installations with respect to common Telecom/Digital Connectivity Infrastructure architects/engineers/planners/other professionals may be advised to refer the above said Addendum to Model Building Bye-laws/Part 8 – Section 6: Information and Communication Enabled Installations of Volume 2 of the National Building Code, 2016].