Explanatory Note on Electric Vehicle Charging Infrastructure
A. Rationale for EVCI establishment
Rapid urbanization coupled with adoption of mechanized transportation modes has resulted in high emissions of Green House Gases that goes on to impact Global warming. Unless, the global surface temperature rise is restricted to no more
than 2oC compared with pre-industrial levels, the IPCC has warned that the world will see irreversible catastrophic climate change.
India being a signatory to the UNFCCC, has pledged for efforts to assess the Greenhouse Gas Emissions (GHG) of anthropogenic origin and removal by sinks. India’s per capita emissions are still considered low at 1.9 tonnes (2013), but its total emissions are next only to China and the US and is likely to overtake those of the EU by 2019.
While comparing the Indian cities for their emission scores, Delhi is on top as the biggest emitter at over 38 38 million tonnes of carbon dioxide equivalent overall emissions, followed by Greater Mumbai at 22.7 million tonnes and Chennai at 22.1 million tonnes, Kolkata at 14.8million tonnes, Bangalore at 19.8million tonnes, Hyderabad at 13.7 million tonnes and Ahmedabad at 9million tonnes were the other cities whose emissions for the year were calculated sector wise.
As per the statistics of Transport Department (GNCTD), total number of vehicles in Delhi is more than the combined total vehicles in Mumbai, Chennai and Kolkata. Delhi has 85 private cars per 1000 population against the national average of 8 cars per 1000 population. In terms of CO2 emissions due to motor vehicles, Delhi emits about 12.4 million tonnes while the city of Bengaluru emits about 8.6 million tonnes.
Therefore, addressing the quantum of emissions from the “Transport” and “Domestic” sector emerges to be the high priority subjects under the overarching umbrella of “Climate change mitigation” as committed to the UNFCC.
Encouraging “Electric Vehicles” as a viable option for phased transportation in terms of short and long distance trips with appropriate “Charging Infrastructure” is therefore, the pre-condition for this paradigm shift / phased migration to sustainable transportation.
For this changes are required in Infrastructure provisions (at Regional and City levels) and in Development Control Regulations (in terms of provisions therein) to include the formulations of norms and standards for “Charging Infrastructure” in the said Mater Plan Regulations and State Bye-Laws for adoption across the country suiting local conditions.
B. EV Charging Technology
B.1 Electric Vehicle Supply Equipment (EVSE):
An EVSE is a wall mounted box that supplies electric energy for recharging of electric vehicle batteries. Also EVSEs have a safety lock-out feature that does not allow current to flow from the device until the plug is physically inserted into the car. EVSEs can be customized with added features like:
Authentication
Integrated payment gateways
Software for remote monitoring.
As electric vehicle charging technology continues to advance, several standards and guidelines have become widely accepted across the industry. This section gives a brief overview of charging infrastructure technology, standards, and terminology.
B.2 Different types of EVSE:
Charging speeds- Charging power, which determines the time required to charge a vehicle, can vary by orders of magnitude across charge points, as shown in Table 1. A small household outlet may charge as slowly as 1.2 kW, while the most advanced rapid charging stations can charge at up to 350 kW. Charging infrastructure is broadly broken into three categories based on speed: Level 1, Level 2, and direct current (DC) fast charging (sometimes referred to as Level 3).
Private Charging
Charging batteries of privately owned cars through domestic charging points. Billing is mostly part of home/domestic metering.
AC “Slow” Charging:
The home private chargers are generally used with 230V/15A single phase plug which can deliver a maximum of up to about 2.5KW of power. The EVSE supplies AC current to the vehicle’s onboard charger which in turn converts the AC power to DC allowing the battery to be charged.
Public Charging
For charging outside the home premises, electric power needs to be billed and payment needs to be collected. The power drawn by these chargers may need to be managed from time to time.
DC “Fast” Charging:
DC current is sent to the electric car’s battery directly via the charge port. FC chargers (usually 50 KW or more) can supply 100 or more kilometers of range per hour of charging. The fast chargers would generally be used as a top-up, rather than fully charging vehicles. These are important for cab companies and corporate users who have a fleet of electric cars.
C. Options for EV Charging
There is an urgent need to offer flexible charging infrastructure for different vehicle segments to drive adoption of EVs. Charging infrastructure is the most crucial enabler in the entire EV value chain. The exploration of different charging models according to the local conditions shall enable faster deployment of electric vehicles in the country.
EV share in all vehicles - It has been broadly projected that by the current rate of adoption of EVs, about 15% of all vehicles in the country would be EVs by the year 2020. Therefore, while assuming percentage composition of all proposed capacities in Public facilities of vehicle holding capacity, the Metropolitan and ‘Tier I’ cities will be assumed to have a higher percentage share of EVs, say 20% for now. The charging infrastructure prescriptions in all urban development guidelines shall, therefore, be in consonance with the said percentage.
Power Load sanction to premises – While adding these Charging Infrastructures to the proposed set of building types of the Indian cities, enhanced Power Load shall have to be had for each such building type by the Power DISCOMs, commensurate to the total additional power requirement of simultaneous operation of all the prescribed charging points in the premise. With further advancement of charging technologies and the enhanced capacity of chargers to draw more power, it is advised that the load capacity assigned to each premise should be kept with a safety factor of 1.25 with a long-term vision of 30 years.
| Vehicle type | Slow Charging | Fast Charging | Public CI |
|---|---|---|---|
| 2 Wheelers | Y | N | Yes/Limited |
| 3 Wheelers | Y | N | Yes/Limited |
| PVs (Cars) | Y | Y | Yes |
| PVs (Buses) | N | Y | Yes |
| Vehicle type | Private CI | Public CS | Predominant place of charging |
|---|---|---|---|
| 2 Wheelers | SC/BS | SC | Point of residence / Work |
| 3 Wheelers | SC/BS | SC/BS | Residence / Parking stations |
| PVs (Cars) | SC/BS |
D. Charger Specifications and PCS Infrastructure
Any installed PCS shall have one or more electric kiosk/boards with installation of all charger models as prescribed in the Guidelines and Standards notified by Ministry of Power, dated 14 December 2018 and revised Guidelines & Standards, dated 1st October 2019 for “Charging Infrastructure for EVs”, with other necessary arrangements as deemed necessary.
Public Charging Station service providers shall be free to create charging hubs and to install additional number of kiosk/ chargers in addition to the minimum chargers prescribed vide the MoP Guidelines, including options for installation of additional chargers, if required.
-
Minimum infrastructure requirements do not apply to Private Charging Points meant for self-use of individual EV owners (non-commercial basis).
-
Captive charging infrastructure for 100% internal use for a company’s own fleet will not be required to install all type of chargers and to have NSP tie ups.
E. Location of PCS / FCB CS in local area / building precincts
In accordance with the Guidelines issued by the Ministry of Power (MoP), following minimum standards with regard to density of / distance between PCS in local level facilities in building premise / urban precincts shall be followed.
i. At the Local levels (within the urban area):
At least 1Public Charging Station is to be available within a grid of 3Km x 3Km.
ii. At the Building premise levels (for various building types)
Private charging infrastructure (non-commercial use) for individuals.
For all commercial modes of charging EVs, at least 1PCS, as per minimum specifications laid under MoP guidelines.
Standalone Battery Swapping Stations may be added with the PCs.