At least 50% of the total paved area on site should either be soft-paved and/or shaded under trees/ pergolas/ solar photovoltaics, etc.
-
Limit use of turf on the site to conserve water and/ or ensure that landscaped area is planted with drought tolerant / native / adaptive species.
-
Avoid disturbance to the site by retaining natural topography (and/ or) design vegetated spaces on the ground, for at least 15% of the site area.
-
Restore disturbed site area by designing vegetated spaces over built structures and on the ground, for at least 30% of the site area (including development footprint).
-
Preserve or transplant at least 75% of existing fully grown trees within the project site / campus.
-
Plant tree saplings that can mature into fully grown up trees within the next 5 years on the project site, as per the below criteria (including existing and transplanted trees in the project site).
-
The landscape here refers to soft landscaping which includes only pervious vegetation.
-
Areas planted with turf should not exceed a slope of 25 percent (i.e., a 4:1 slope).
-
Landscape areas over built structures such as basements, podium, roofs, etc., can be considered for the calculation.
-
Retaining ‘Natural Topography’ in its broad sense means preserving the natural features of the terrain such as exposed natural rocks, water body, etc.,
-
Grass medians, grass pavers, jogging track, open-air theatre, parking areas, driveways, walkways, playground, swimming pool, etc., are considered as site disturbances.
-
Native / adaptive vegetation shall be retained as much as possible.
-
Potted plants shall not be considered as vegetation.
2. Solar Energy Utilization Bye laws: 10.2 (2)
All efforts need to be made towards optimum and efficient use of energy sources for life sustenance. The increasing thrust on using non-fossil fuel energy for all needs have to be given priority consideration. The tapping of renewable sources of energy for lighting, heating, cooling and ventilation needs, deserve special attention.
Note: For captive solar power generation, a minimum of 15 % of sanctioned load is the requirement.
a. Installation of Solar Photovoltaic Panels
Solar photovoltaic (PV) systems are direct energy conversion systems that convert solar radiation into electric energy. Roof of buildings as well as other exposed areas such as of parking shade, vertical/inclined walls, windows can be installed with solar PV system. can be installed with solar PV system.