4.1 This chapter is applicable to all small residential plots up to 105 sq.m in size forming a part of approved layout/ special areas/ unauthorized regularized colony/ village abadis/ lal dora /extended lal dora resettlement colonies and slum & JJ cluster/ Rehabilitation Colonies, excluding those within LBZ.
4.2 In case of corner plots, a maximum relaxation of 10% of the plot area shall be permitted.
4.3 All plot owners desirous of making any additions/alterations/new construction on such plots have to follow the procedure mentioned hereunder :
a. The plot owner has to give an UNDERTAKING for INTIMATION OF CONSTRUCTION START as given at Saral Form 1 at the end of this chapter.
b. After submitting this UNDERTAKING at the office of the Authority / concerned local body of appropriate jurisdiction, along with enclosures and building permit fee, the plot owner can start the construction immediately.
c. Construction design shall be as per General Building Requirements given in Chapter 7 and as per Development Control Regulations as per Annexure VI of this document. See 7.1
d. The building shall be designed by an Architect/ Engineer/Supervisor. Note: For qualification and competency of Architect/ Engineer/Supervisor refer Annexure I.
e. The construction has to be completed within a period of five years. If the construction is not completed within five years, the Revalidation fee has to be paid once again to revalidate.
f. The applicant/ Owner will indemnify the concerned Sanctioning Authority from structural safety and any other damages caused by constructions/ erecting of the building,
g. On completion of construction, the owner has to intimate the Sanctioning Authority having appropriate jurisdiction that the construction is complete in an INTIMATION OF COMPLETION OF CONSTRUCTION format
as given at Saral Form 2 at the end of this chapter, along with drawings/ plans duly signed by an Architect/ Engineer*. Thereafter applicant/ Owner can start occupancy of the building/ floor/ portion of the building.
h. Inspection/ Scrutiny shall not be carried out at the time of submission.
i. Rain water harvesting is required as per policy.
j. Standard Building Plans for various sizes of plots under SARAL Scheme shall have to be uploaded by the sanctioning authorities in the websites.
Saral Form 1 Undertaking Intimation of Construction Start
I/we … ...son / daughter of R/o…………............……do hereby solemnly affirm and undertake to state as follows :
a) That I /we are the lawful owner/s of the plot bearing plot no. …………, address…… …… as per allotment letter / registered Sale Deed / perpetual lease deed / Will / Deed of Partition / any other legal document (Self- attested photocopy enclosed),
b) That the plot is not affected in any of the proposed / approved scheme or project under provisions of Master Plan for Delhi/ Zonal plan and is in conformity of the approved layout plan/ as per approved policy of Government of NCT Delhi
c) That the plot under reference is residential and not part of any district park / recreational land use as per the zonal plan / approved layout plan.
d) That the plot is not affected by the road widening as per the zonal plan / approved layout plan.
e) That the plot is not affected in any site earmarked for community facilities / parks etc.
f) That the plot is away from high tension line as per the mandatory distance clearances as per the Building Bye-Laws provisions.
g) That I / we propose to construct a house as per the provisions of the prevailing building bye laws at the time of application (plans/sections/elevations of all floors proposed to be constructed duly signed by an Architect/ Engineer/Supervisor as defined in these building bye-laws are enclosed )- for qualification and competency of Architect/ Engineer/ Supervisor. (refer Annexure I)
h) That the building plan proposed duly meets the mandatory ventilation requirements as per the Building Bye-Laws provisions.
i) That I/we have enclosed herewith a building permit fees as per following categorization of colonies on the basis of plot area:
-
For plots in Colonies under A & B category: Rs. 5000 per sq.m. *
-
For plots in Colonies under C & D category: Rs. 2500 per sq.m. *
-
For plots in Colonies under E, F, G & H category: Rs.1500 per sq.m. *
*These charges are exclusive of labour cess as prescribed by the Authority/ concerned local body.
Note: For subsequent sanction of revised building plans, building permit fee @10% respectively of (1), (2) & (3) above, shall be deposited.
j) That I/we understand that the above fee is valid only for a period of five years,
k) That the building shall be constructed under due supervision, ensuring structural engineering design/ norms.
l) That if I/we do not complete the construction within five years and do not submit the INTIMATION OF CONSTRUCTION COMPLETION, an amount as decided by concerned Sanctioning Authority shall have to be paid once again for getting an extension of time/for further new construction,
m) That I/we take full responsibility for the quality of construction and structural stability of the construction using the services of a qualified professionals as referred in Annexure 1
Intimation of Construction Completion
a) I/we …..son / daughter of …… R/o… …do hereby intimate that the construction of the building as per details given below is now complete : Plot Area:… Address: …
b). I am hereby submitting the plans / drawings, site photographs (8” x 10”- 3 in nos.) which are in compliance with the prevailing bye- laws duly signed by the Owner(s) and Architect/ Engineer as defined in these bye-laws Annexure I.
c). Further the Structural Stability Certificate (Declaration Proforma, Chapter 2, para 2.1.3) duly signed by a structural engineer is enclosed:
d). I have not constructed any part of the building in violation of the building bye-laws. In case the Sanctioning Authority at any time identify unauthorized construction and violation of MPD provisions, the same is liable for penalties/demolition and I shall abide by the decisions of Sanctioning Authority.
Date: ……………
Signature/, Name and Address of Owner(s): 1) 2)