To,
____
____
____
New Delhi.
File No____ Dated: ____
Sir,
With reference to your application No ____ dated ____ for the grant of sanction for the erection of building/execution of work in House No.____ Plot No____ Block No____ Scheme____ Situated at ____ I am directed to inform you that the sanction has been revalidated/refused on ____(date) on the following grounds:
2
3
Yours Faithfully
For sanctioning authority ____
FORM- C-1
(Chapter 2, Para 2.5.4.a)
Form- D-2
Intimation of Completion of Work UP to Plinth Level for Moderate and High Risk Buildings
To,
____
____
____
New Delhi.
This is to intimate that the Construction up to plinth/column up to plinth level has been completed in Building No. ____ on/in Plot No. ____ SchemeNo. ____ Road/Street ____ Ward ____ in accordance with permission/Letter No. ____ dated ____ under my supervision and in accordance with the sanction.
Yours faithfully,
Digital Signature of Architect/Engineer/Supervisor____
Dated ____
Digital Signature of Owner____
Dated ____
(Chapter 2, Para 2.5.3 & 2.5.4.b)
Inspection Report Upto Plinth Level
By the Office of the Sanctioning Authority for Moderate and High Risk Buildings/ by the Architect/engineer/supervisor for Very Low and Low Risk Buildings
I ---------------- working as a ---------------- with ---------------- have carried out the inspection of Building No. ---------------- on/in Plot No. ---------------- Scheme No ---------------- Road/Street ---- Ward ---------------- in accordance with your permission no. ---------------- dated ----------------.
a. No deviation has been noticed.
b. The following deviation from the sanctioned plans have been noticed which are against the provisions of Master Plan for Delhi/ Bye-Laws and are of non-compoundable nature.
Description of deviations noticed ----
You are requested to stop further work till such time the above deviations are rectified and construction is brought in conformity to the Sanctioned Plans.
Yours faithfully,
For sanctioning authority ____ for Moderate and High Risk Building
Or
Digital Signature of Architect/Engineer/Supervisor ____ for Very Low and Low Risk Building
Dated ____
(Chapter 2, Para 2.6 & 2.6.5)
(INTIMATION OF BUILDING COMPLETION)
To,
____
New Delhi.
Sir,
We hereby certify that the erection / re-erection or material alternation in / at building no. ____ on / in ____
Plot No. ____ Block No. ____ situated at ____ scheme has been supervised and has been completed on ____ according to the plans sanctioned, vided office communication no. ____ date ____. The work has been completed to our satisfaction, the workmanship and all the materials (type and grade) have been strictly in accordance with general and detailed specifications.
i. Certified that the building(s) has been constructed according to the sanctioned plan and structural design (one set of structural drawings as executed is enclosed) which incorporate the provisions of structural safety as specified in relevant prevailing IS Codes / Standards / Guidelines.
ii. Further certified that detailed drawings and specifications of all services prepared by engineer for utility services.
iii. It is also certified that construction has been done under supervision of Supervisor and adheres to the drawings submitted and the records of supervision have been maintained.
iv. a. For Existing Connection of DJB : Connection Number.
b. For Fresh Connection from DJB: Apply Online.
(Chapter 2, Para 2.6.5)
(To be submitted by Structural Engineer)
The following certificate is submitted along with the building plans drawing while submitting the plans for obtaining sanction of building permit/occupancy-cum-completion for Building No. ____ on Plot no. ____ situated at ____ Scheme ____.
I. Certified that the building plans submitted to the sanctioning authority shall be/has been designed for safety requirements.
II. It is also certified that the structural design shall be/was based on National Building Code, including safety from natural hazards, based on soil conditions (as per Soil Testing Report no..... dated .... prepared by ....) will be/has been taken into consideration and would be/has been duly incorporated in structural drawings of the building to be/so constructed.
Encl: Soil Testing Report in case of High Risk Building.
Encl:
-
Plans and Drawings (Chapter2, 2.6.1)
-
Ownership Documents (Chapter2, 2.6.2)
-
Lift Manufacture Certificate (Chapter2, 2.6.3)
-
Photographs of the building (Chapter2, 2.6.4)
Permission to occupy or use the building may be granted.
Any subsequent change from completion drawings will be the responsibility of the owners.
A) Digital Signature of the Owner
B) Digital Signature of Structural Engineer (Responsible for Structural Design)
C) Digital Signature of Architect/ Engineer/ Supervisor (Responsible for Architectural Design)
D) Digital Signature of the Supervisor (Responsible for supervision of the construction)
Note: There is no requirement of submission of Affidavit(s)/ Notorised Affidavit(s)/ e-stamp paper(s)/ Bond(s) etc. along with this application form.
FORM- D-1
(Chapter 2, Para 2.7.1/2.7.3)
Occupancy-cum-completion Certificate/ Part Occupancy-cum-completion Certificate
Name of the sanctioning authority
File No. Dated:
Plan No.
Shri/ Miss/Smt. (OWNER[S])
With reference to your notice of completion dated ___, it is certified that the building as per description below and certified plans of____ whose LOP & Bldg. plans were sanctioned vide letter No. ____dated____ and NOC for completion certificate as approved by DUAC/DFS and other statutory bodies, the OCC/Part OCC has been approved on____ as per the site inspection report with reference to Building Bye-Laws, MPD provisions, hygienic and sanitary conditions inside and in the surroundings and is declared fit for occupation.
The sanctioning authority approves Architectural Drawings/Development Control norms with respect to the Building Bye Laws and MPD provisions only. The technical drawings/documents submitted by the owner/consultant/Architect/Engineer/Structural Engineer/Landscape Architect /Urban Designer/Engineer for Utility Services are considered as part of the records/information supporting the building permit only. The responsibility of the correctness of information/application of technical provisions fully vests with the owner/consultant/ Architect/Engineer/Structural Engineer/Landscape Architect /Urban Designer/Engineer for Utility Services and shall be liable as per laws.
The structural stability of the building is based on the certificate given jointly by the Owner/Architect/Structural Engineer along with one set of Structural Drawings, incorporating therein the provisions of Structural Safety as specified in the relevant prevailing IS Codes/Standards/Guidelines stated in the Government of India Notification bearing No.SO-248(E) dated 21.3.2001 and clause 9.1, 9.2.1, 9.2.2 and Annexure VII of this Bye Laws. For the fire-safety the same has been based on the Fire Safety Certificate given by the Delhi Fire Services, Government of NCT of Delhi. The sanctioning authority shall not have any responsibility for any loss caused to the building from any natural hazard / calamity.
Completion Certificate is issued for Plot No. as per enclosed drawings.
Yours Faithfully
Name of the sanctioning authority