Background
In order to attract investments into the country, efforts are being made to improve ‘Ease of Doing Business’. In this direction, the limit of Built-up Area (BUA) for Foreign Direct Investment (FDI) has been reduced from 50,000 sqm to 20,000 sqm. The local bodies have been directed to get the entire building approval process made online so that the building plan applications are submitted online, building fees and other charges are deposited online, and after due scrutiny, the approvals are conveyed online. Further, certain external bodies like Delhi Urban Art Commission (DUAC), National Monuments Authority (NMA), Airports Authority of India (AAI), Delhi Fire Services (DFS), Delhi Metro Rail Corporation (DMRC), Heritage Conservation Committee (HCC), etc. grant No Objection Certificate (NOC)/ approvals on the proposed building plans to the local bodies. Such external bodies have been directed to prepare online NOC system which is compatible and integrated with that of the local bodies and the desired information is sent to the concerned external bodies and their comments/ NOC/ approval are received online so that there is no need for building proponents to pursue matter with local bodies or external agencies. The specific requirements of the external bodies are to be added in the Common Application Form (CAF) of the local body so that building proponent has to file all information at one go only. The objective is to make the whole process simplified and streamlined to ensure ease in getting the approvals for building permit within stipulated time.
Risk Based Classification of Buildings for Fast Tracking the Approval Process
Further, a procedure has been laid down in Chapter-4 of the Building Bye-Laws for sanction of building plans of small residential plots measuring up to 105 sqm named as SARAL Scheme. The idea is to facilitate building proponents of such small sized plots to get their building plans prepared by an architect/ engineer (qualification and competence as per Annexure I), and submit to the concerned local bodies along with fees, other charges, drawings and documents before commencement of the construction and the submission itself shall be deemed sanction. Hence, such persons may not have to wait for processes in the local bodies to initiate construction.
However, there is a need to make provisions for fast-tracking the building permission procedure for bigger plots as well. Therefore, in the spirit of ‘Ease of Doing Business’, the buildings have been classified on the basis of risk parameters/ risk based classification to clear the building permits on fast track system. This also helps in fast-tracking of inspection and issuance of OCC. This kind of classification is used for fast tracking the sanction of building plans, which facilitates ease of doing business environment for construction permits, that will improve the rating of the country in World Bank’s assessment in ‘Ease of Doing Business’. The matter was discussed with all amongst MCDs, DDA, NDMC, DUAC, Delhi Fire Services and TCPO in different meetings. Considering all aspects related to the approvals and the objective of ‘Ease of Doing Business’, the bye-laws on riskbased classification and fast-tracking the sanctioning procedure were framed based on the consensus that emerged in these meetings for certain residential buildings, storage buildings/ warehouses/ godowns and government buildings.
Further, DDA, in consultation with local bodies, has done risk based classification for the approval of all other types of buildings as well for fast tracking approval system.
Requirement of Climate Resilient Construction: Integration of Environmental Clearance conditions with Building Permission.
Land, Air, Noise, Water, Energy, Biological/ Socio-Economic factors, Solid/ other waste management are the main facets considered in relation to Pre, During and Post Building Construction for Sustainable Environment Management. Therefore, it is necessary for the building construction process to ensure compliance to various conditions laid down by the Ministry of Environment, Forest & Climate Change (MoEF&CC).
The building construction sector is one of the major contributors towards carbon footprints which affect climate change. India is committed towards mitigating the effects of climate change and moving towards internationally accepted norms for environment friendly building construction. Currently, this objective of environmental safeguard is achieved through obtaining Environment Clearance (EC) for any construction project having built up area (BUA) more than 20,000 sqm from the State Environment Impact Assessment Authority (SEIAA) designated by MoEF&CC for the States/UTs. This is administered under notification of MoEF&CC.
With rapid urbanisation and growth of Indian economy, it is anticipated that the construction activities will experience a rapid growth. Government is committed towards streamlining the clearances for buildings and real estate sector and empowering the urban local bodies with an objective of ‘Ease of Doing Business’.
MoEF&CC, vide its notification no. S.O. 3999(E) dated 09.12.2016, has amended the Environment Impact Assessment Notification, 2006 to insert a paragraph (numbered 14) regarding “Integration of environmental condition in building bye laws”, which will integrate the environmental safeguards into building plan approval process and empower the concerned local body to examine, stipulate and ensure compliance of the environmental requirements in their respective areas. The environmental conditions required to be met by the buildings have been classified in the following 3 categories based on the total BUA of the building:
i. Category ‘1’ buildings: BUA from 5,000 sqm to less than 20,000 sqm
ii. Category ‘2’ buildings: BUA from 20,000 sqm to less than 50,000 sqm
iii. Category ‘3’ buildings: BUA from 50,000 sqm to less than 1,50,000 sqm
The local body or any other body authorized to sanction building plans, shall approve the building plans by ensuring that stipulated conditions for the respective categories of buildings are met. No separate Environment Clearance (EC) will be required in these cases.
Before notification of these building bye-laws, a copy of this chapter was sent to MoEF&CC for seeking their concurrence at the draft stage so as to ensure compliance with the necessary requirements for environment clearance. After getting the concurrence, this chapter has been included in the bye-laws. After notification of these bye-laws as per due process of law, a copy of this chapter shall be sent again to MoEF&CC to get notification orders issued by that Ministry empowering local bodies of Delhi, which sanction building plans, to approve building plans after ensuring that the required environmental safeguards are met, and there will be no need for seeking Environment Clearance (EC) for buildings with BUA greater than 20,000 sqm and upto 1,50,000 sqm, as was the practice earlier. It will be the responsibility of the concerned local bodies, i.e. building sanctioning authorities, to ensure compliance of the stipulated conditions to address environmental concerns in case of such buildings. For the buildings with BUA more than 1,50,000 sqm, EC shall be obtained as prescribed by MoEF&CC under their notification.
3.1 Risk Based Classification for Approval of Building Plans
3.1.0 Fast track approval procedure
i. For the buildings classified as Very Low Risk and Low Risk, the fast track procedure for approval of building plans has been specified, wherever applicable, under the bye-laws 3.1.1 onwards.
ii. For buildings classified as Moderate Risk, the time limit for grant/ refusal of sanction of building plan, OCC or revalidation of building permit shall be 20 days.
iii. For buildings classified as High Risk, the time limit for grant/ refusal of sanction of building plan, OCC or revalidation of building permit shall be 30 days.
3.1.1 Residential Buildings
3.1.1.1For approval of the residential plotted and group housing buildings, risk based classification shall be as per Table 3.1.
| Parameter | Risk Category | |||
| Very Low | Low | Moderate | High | |
| Size of the Plot | Up to 105 m2 | Above 105 m2 and up to 500 m2 | Above 500 m2 | Different sizesii |
| Height of building (including stilt, if any) | Below 15 m | Below 15 m | Below 15 m | 15 m and above |
| Use of the premise | Residential Plotted | Residential Plotted (vacant plot) | Residential Plotted | Group Housing |
i Residential plotted includes all residential plots forming a part of approved layout/ special areas/ unauthorized regularized colony/ village abadis/ lal dora & extended lal dora resettlement colonies and slum & JJ cluster/ Rehabilitation colonies; excluding those within LBZ.
iiDifferent sizes for Group Housing prescribed in MPD-2021.
3.1.1.2 Fast Track Procedure: The fast track procedure for approval of the residential plotted and group housing buildings, based on their risk based classification as per bye-law 3.1.1.1, shall be as follows:
i. For the buildings categorized as Very Low Risk, the process prescribed in Chapter 4 shall be followed.
ii. For the buildings categorized as Low Risk, an architect/ engineer (qualification and competence as per Annexure-I) shall be empowered to issue the building permit, but only after submitting the plan along with requisite documents and fees to the Sanctioning Authority. If the owner/ architect/ engineer desires to get the building plan sanctioned by the Sanctioning Authority building plans prepared by a qualified architect/ engineer will have to be submitted to the authority/ local body along with the fees and other requisite documents and the Sanctioning Authority shall grant the building permit within 10 days.
3.2 Environmental conditions for sanctioning Building Plans
3.2.1 For building plans with a total built-up area (BUA) between 5,000 sqm and 1,50,000 sqm, no separate environment clearance will be required from the Ministry of Environment, Forest and Climate Change (MoEF&CC) for individual buildings. The Sanctioning Authority shall follow the process laid down and adhere to the objective and monitorable environmental conditions as given in MoEF&CCs Notification No. S.O. 3999 (E) dated 09.12.2016 and its appendices, as amended from time to time. Copy of this notification is at Appendix 3.1 of this Chapter.
Note :i.) “Hon’ble National Green Tribunal vide its Judgement dated 08.12.2017 in OA No.677 of 2016, O.A. No.01 of 2017, O.A. No.7 of 2017, O.A. No.55 of 2017 and O.A. No. 67 of 2017 with respect to the Notification dated 09.12.2016 of MoEF & CC, GOI has inter-alia directed that till the time the Ministry comply with the above directions contained in its aforesaid order and notify the amended provisions of regulations of 2006, it will not implement the impugned Notifications.
ii) Hon’ble National Green Tribunal vide its Judgment dated 03.12.2018 in OA No.1017 of 2018, has stayed the impugned notification and directed the existing mechanism, prior to this notification to continue till further orders.