Planning Assistants Tvl. G.S. Panneerselvam, D. Ravichandran, and M.S. Santhosh Kumar, Tmt. A. Jeyanatha sornamani, K. Gowri, N.B. Vani, G. Alamelu, D. Sughirtha, D. Thirupurasundari, and G. Poonguzhali Software used: Arc Info, ENVI, Auto Cad, Auto Cad Map 3D. Aerial Data used: Ikonos 2001,2003 &2004 (1 metre resolution) Cartosat 2005 (2.5 metre resolution)
Supported by Traffic and Transportation Senior Planner , Thiru. K. Kumar, Assistant Planner, Tmt. R. Meena Housing and Environment Deputy Planner, Thiru. M. Sivashanmugam Assistant Planner, Thiru. V. Kumar Support for certain data collection and Tamil translation was provided by various officials and staff working in different Divisions in CMDA.
Annexure ARegularisation Of Unapproved Layouts In Chennai Metropolitan Area
In Chennai Metropolitan Area, a layout is defined as sub division of land into plots exceeding 8 in numbers. Sub-division of lands into plots up to 8 in nos. is called as sub- division.
Any layout laid out without approval of the competent authority viz. Directorate of Town &Country Planning before 5.8.75 the date of coming into force of Master Plan for Chennai Metropolitan Area or Chennai Metropolitan Development Authority after 5.08.1975 is called as unauthorized or unapproved layout.
The Development Control Rules for CMA, forming part of the Master Plan came into force from 5.8.75. Any unauthorized layout laid out on private land [ not encroachments on public land ] prior to 5.8.75 is recognized as it is. No equivalent land cost in lieu of Open Space Reservation is collectable for these pre- 5.08.75 unauthorised layouts.
It was found that before coming into force of the Tamil Nadu Urban Land Ceiling Act on 3.8.76 a number of unauthorized layouts had come up. For considering regularization of individual plots in those pre- 3.8.'76 layouts, the following guidelines were issued by CMDA in A.P.Ms.No. 110, dated 7.10.1976.
1. Site comprised in an unauthorized/unapproved, unsanctioned layout or sub divisions, but abutting on roads taken over by local body
The site will be considered for approval, subject to the plot owner agreeing to pay proportionate cost of the open space reservation needed for the area as per Development Control Rules 19(a)(iv)
2. i) Site comprised in an unauthorized unapproved/unsanctioned layout where developments have been carried out but the roads have not been handed over to the local body.ii) Site comprised in an unauthorized unapproved/unsanctioned layout where the developments have not been carried out.
The site may be considered approval, subject to the following: -i) The road in question can be taken over by the local body ultimately.Note: For the purpose of the above a road will be deemed to be a road that can be taken over if.a) the width of the road is not less than 16 feet andb) the road is connected at least at one end to a public street.ii) The plot owner agreeing to pay the proportionate cost of development as estimated by the local body for the full work/ for any unfinished works.iii) The plot owner agreeing to pay proportionate cost of the open space reservation needed for the area as per Development Control Rules 19(a)
The powers to regularize such pre 3.8.76 layouts were delegated to the executive authorities of the local body concerned within CMA.
In the Authority proceeding No. Rc.S5/43464/01/CPP/13/82, dated 7.12.82 the following guidelines were issued for regularization of individual plots in unapproved layouts made prior to 3.8.76: -
Planning Permission applications relating to construction in unauthorized layouts made prior to 3.8.76 shall be forwarded to CMDA for consideration with evidence of registration by the Registration Department to prove that sale of one or more plots in the said unauthorized layout had occurred prior to 3.8.76, and proposed sub division also formed part of the registered document, by a sketch or by narration apart from those particulars.
Many unauthorized layouts had come up after 3.08.1976. In 1985, a subject was placed before the Authority on the basis of a representation from one of the members of the Authority for extension of the cut- off date for regularization of plots in unapproved layouts. After detailed examination it was decided as follows in respect of the unapproved layouts made after 3.8.1976[ a circular in Lr.M1/9838/90, dated 30.4.90].
(1) Executive officers of the local bodies in Madras Metropolitan Area are forwarding planning permission applications for construction of buildings in unapproved layouts/unauthorized sub divisions made after 3.8.1976, which are in violating of ULC guidelines. Government after consultation with MMDA and Commissioner of Land Reforms have directed that such unauthorized sub divisions made after 3.8.1976 should be regularized subject to the condition that the road in front of the applicant’s site is public/under the maintenance of the local body concerned.
(2). The status of the road furnished by the local bodies in most of the cases is not clear. Roads of the local bodies are to be taken over by passing a resolution to that effect by the council. Roads should be taken over for maintenance only after obtaining approval of the council for incurring expenditure in providing amenities to the road in the area.
(3). The Executive Officers of the local bodies are therefore requested to forward planning permission applications for constructions in unauthorized layouts/sub divisions made after 3.8.1976 violating ULC guidelines with the following certificates:
i) the road for entire length from the applicant’s plot to its connection to nearest public road is vested with the local body. (This should be supported by adequate proof in the form of an extract from the street inventory register with council’s resolution with date).
ii) the road for entire length from the applicant’s plot to its connection with nearest public road is under the maintenance of the local body (supported with council resolution with date for having authorized incurring the expenditure)
iii) In the event, such a certificate is issued by the President of the local body, it should be countersigned by the Executive Authority of the respective local body i.e. Block Development Officer of Panchayat Union.
(4). The certificate wording in (i) and (ii) shall be as given and any altered or ambiguous wordings shall not be accepted.
(5). It was also decided to regularize only those unauthorized sub-divisions made prior to 31.12.1989. The actual date of registration would be taken into consideration for deciding whether the unauthorized sub divisions have taken place before or after 31.12.1989. The Executive Officers are therefore requested not to forward planning permission applications for regularization of unauthorized subdivision made after 31.12.1989.
In 1992, the powers to regularize pre- 31.12.’89 unauthorised subdivision were delegated to the officials of local bodies within Chennai Metropolitan Area subject to satisfying Development Control Rules and the following guidelines: -
(i) a) The abutting road should be a public road (Public road means a road taken over or declared public by the local body / Department of Highways and Rural works).
b) If the abutting road is not declared a public road, then it should be a road where the local body had incurred expenditure for providing infrastructures like streetlights, pavements, storm water drainage etc.
(ii) The unauthorized layout wherein the plot lies should have been made prior to 31.12.1989 (i.e.) the plot for planning permission applied for or any one of the plots in the unauthorized layout should have been registered prior to 31.12.1989 evidenced by the layout plan registered with the sale deed.
(Apart from Development charge under Town Country Planning Act, OSR Charges, local body's road improvement charges etc., additionally
regularisation charge at the rate of Rs. 5 to Rs. 15 per sq.m. plot area were collectable when the plot was considered for regularisation)
Regularisation scheme for unauthorized development was introduced for Chennai Metropolitan Area in 1999 and extended in 2000, 2001 and 2002, the cut-off dates were also extended and as per the latest schemes which was closed on 8.07.2002, the following are the rule provisions in respect of unauthorised layouts/ subdivisions.
(i) the unauthorized plot should have been registered on or before 31.03.2002.
(ii) Irrespective of whether any plot or land is vacant, partially or fully built, if there is violation in terms of unauthorized sub-division or layout, or plot extent or frontage, the plot or land alone shall first be considered for regularization as one category and regularization fee shall be assessed as specified subject to the following conditions: -
a) In the case of a plot in an unauthorized layout, the plot shall abut a road of width not less than 4.8 metres and the unauthorized layout roads shall be connected to a public road or street maintained by the local body by their resolution.
b) In case of a plot in an unauthorized sub-division, the plot shall abut on a public road or street or gain access through an exclusive or a common passage of width not less than one metre and connected to a public road or street maintained by the local body evidenced by their resolution.
c) No part or whole of any unauthorized layout as such is regularisable. Only individual plot shall be considered for regularization, provided it has been divided and registered on or before 31st March 2002.
It shall be in conformity with the following: -
a) The Coastal Zone Regularisation of the Ministry of Environment and Forest under the Environment (Protection) Act, 1986 (Central Act 17 of 1986);
b) The Civil Aviation Regulations of the Ministry of Tourism and Civil Aviation under the Aircraft Act, 1934 (Central Act XXII of 1934);
c) The Ministry of Defence Regulations for developments in the vicinity of the Air force Stations within 900 metres around;
d) Regulations of the Chennai Regional Advisory Committee constituted by the Ministry of Communications;
e) Any development for regularisation shall abut on a public road or gain access from a road or passage over which the applicant has right of access;
f) In case of multi-storied developments, No Objection Certificate from the Directorate of Fire Services with regard to the fire protection measures shall be furnished by the applicant;
g) No development shall be regularized in the lands affected by the alignments of proposed Inner Circular (Rail) Corridor, Inner Ring Road, National Highways By-pass Road, Outer Ring Road and Mass Rapid Transit System (Rail) Projects;
h) No special and hazardous industry or and industry categorized as “RED” by Tamil Nadu Pollution Control Board shall be regularized in a non-conforming zone, it shall be regularized only with the clearance form the Tamil Nadu Pollution Control Board;
i) No industry categorized as “ORANGE” by the Tamil Nadu Pollution Control Board shall be regularized in any use zone without the clearance from the Tamil Nadu Pollution Control Board; and
j) Any development for regularisation shall conform to the rule 79 and 80 of Indian Electricity Rules, 1956 in respect of clearance form high tension and extra high voltage lines.
(iv) Regularisation fee collected for the plot area at the following rates
Serial Number
Location of the plot
Rate of Levy (Rupees per sq.m.)
1.
Chennai City Corporation and Banned area
20.00
2.
Municipalities and Municipal Townships.
12.50
3.
Rest of Chennai Metropolitan Area not included in Sl.No.1 &2
7.50
Note: These rates shall apply irrespective of whether the plot is vacant or constructed partly or fully.
(This Regularization fee is in addition to the normally payable changes such as Development Charges, Open Space Reservation Charges, Local body's Road Improvement Charge and License fee etc.)
As a large number of applications were received seeking planning permission for constructions in the post- 31.12.1989 unapproved layouts, and the cutoff date prescribed dates back to more than 15 years, CMDA has proposed to Government separately, for extension of the cut-off date for regularizing individual plots in these unauthorised layouts made after 31.12.1989.
Annexure - B
Details of Population in select cities in the World
Sl.No.
City
Area (Sq.km)
Population-2001
Density per hect.
India
1
Mumbai
a) Mumbai City
157
3326877
212
b) Mumbai suburban
445
8587561
193
c) Thane
9032
8128833
9
d) Wardha
6153
1230640
2
e) Raigarh
7353
2205972
3
2
Delhi
a) Central Delhi
25
644005
258
b) East Delhi
64
1448770
226
c) New Delhi
35
171806
49
d) North Delhi
60
779778
130
e) North East Delhi
60
1763712
294
f) North West Delhi
438
2847395
65
g) South Delhi
251
2258367
90
h) South West Delhi
417
1749492
42
I) West Delhi
129
2119641
164
3
Kolkata
a) City
185
4580544
248
b) Hoogli
3150
5040047
16
c) Howhra
1474
4274010
29
d) North 24 parganas
4059
8930235
22
e) South 24 parganas
9870
6909015
7
4
Chennai
a) City
176
4343645
247
b) Rest of Metropolitan area
1013
2690094
27
5
Hydrabad City
217
3686460
170
6
Bangalore UA
2174
6523110
30
Rest of the World
7
Washington
City
159
606900
38
8
NewYork City
800
7322564
92
9
Los Angeles
1216
3485298
29
10
London
1572
53
City
95
Outer London
36
11
Singapore
640
43,00,000
67
12
Hong Kong
a) Island
80
1335469
166
b) Kowlon
47
2023979
432
c) New Territories
974
3343046
34
Study Team
Master Plan Unit
Chief Planner Thiru. C. Palanivelu Senior Planner Tmt. S. Chithra Assistant Planners Tmt. C.R. Vimala and Tmt. R. Anusuya
Planning Assistants Tvl. T.K. Vasantha Kumar, N. Vijayanarayanan, K. Chandran, S. Venkatesan, M. Murali, S. Irudhayaraj, V. Govindhasami, B.I. Raghu, G.V. Saleem, and MansoorAhmed, Tmt. K. Selvakumari, S. Shakila, M. Anjugam, B. Jayanthi, and B. Suganthi,
Steno typists Tmt. R.S. Geetha, L. Kamalambal, and S. Dellibai
Assistant/ Jr. Assistant Tvl. S. Baskaran, and R. Lesely Irudhayaraj
Field man/woman Tmt. N. Bhuvaneshwari, and Thiru. B. Inban Drivers Tvl. B. Krishnamoorthy and A.S. Chandrasekar