10.26 The Govt. of Tamilnadu had ordered for constitution of Nucleus Cell in CMDA in 1979. The Nucleus Cell had submitted its report in 1980. Following are the main recommendations of the cell:
(i) Considering the urban development already occurred, the surplus course of the Vyasarpadi area known as Captain Cotton Canal could be improved to carry only 2,660 cusecs with difficulty due to lack of space and drain into North Buckingham Canal.
(ii) Some of the surplus from the higher tanks in the area should be diverted into Cooum (i.e. Ambattur tank surplus into Cooum River via Mogappair tank; Korattur tank diverted into Madhavaram tank; Madhavaram tank diverted northwards into Redhills surplus course).
(iii) After the above diversions, Captain Cotton Canal designed for 2,660 cusecs would be sufficient to take care of the flood quantity of 2,360 cusecs in all seasons and proved to be permanent advantage for the Vyasarpadi area.
(iv) To remove the difficulty of discharge of floods a second arm across the Manali-Tondiarpet Road through a causeway has to be constructed for the Captain Cotton Canal to discharge 1,500 cusecs into the ‘B'canal. Even then, the ‘B’ Canal could not be in a position to accommodate the flood and discharge into the sea and hence to realize the benefits of the improvements to Captain Cotton Canal a short cut canal to the sea in Thiruvottiyur area has to be constructed.
(v) To prevent flooding of the Manali area and in Kosasthalaiyar river the Kosasasthalaiyar riverbanks have to be strengthened by borrowing the shoals inside the river as far as possible.
(vi) Otteri nullah has its southern watershed starting from Cooum river itself and have all spills from the river enters into the nullah. The main cause for the floods in the nullah was the absence of banks for Cooum river. If this is taken care of, the discharge from nullah could be confined and disposed off after effecting improvements to the nullah.
(vii) In respect of the Cooum river flow, strengthening of the banks at certain stretches had to be made apart from repairing and strengthening of the Bangaru Channel. Thirumangalam causeway, Naduvakkarai causeway and Chetpet causeway, which were all obstructing the flow, should be removed. The old arch bridges, which were causing afflexes of more than 0.37m, had to be replaced in the first phase by a single span bridge (Aminjikarai bridge, Andrews bridge, Law’s bridge and Wellington bridge) in the first phase and College road bridge, C-in-C Road bridge in the second phase.
(viii) It was essential to think measures to divert a portion of Cooum flood discharges into neighbouring Kosasthalaiyar basin (Poondi reservoir) as already formulated by Er.A.R.Venkatachary's in 1943. Flood waters from Eagattur area to be taken in the Northwesterly direction reaching Thirupachur Odai and then to the Poondi reservoir by constructing a diversion channel.
(ix) Cooum River collects surplus from 75 tanks under Cooum Tank Group. All these tanks drain ultimately to Cooum tank from which the surplus reaches Cooum River just above Satharai Causeway. Tanks can be made to absorb and mitigate flood by judicious regulation. Flood outflow from large tanks could also be brought and drain in such a manner they not only absorb the flood but also anticipate them and deplete the tank in advance such that the outflow is kept at moderate level over a long period. Flood absorption capacity of the tanks may be improved by lowering the full tank level or by converting the surplus weir into a ‘calingulah’.
(x) North Buckingham Canal had been improved and linked between Ennore South lock and Cooum in fall for a distance of 10 miles in 1973-74. In Thiruvottiyur region, it collects the drainages from Sathangadu tanks and Kodungaiyur tank. In Tondiarpet region, it collects drainages from
Vyasarpadi group of tanks. In Vyasarpadi area it is a flood bank of Otteri nullah. The entire city gets inflow through the ‘B’ Canal and it is a main drain of the city during monsoon. The floodwater in the canal flows southward into a Cooum river and northwards in Kosasthalaiyar river as much as the gradient permits. The stretch of the canal needs to be desilted and the floodgates of the Ennore South lock and Adyar north lock had to be got repaired.
(xi) The vent-ways were very small at Central Station Bridge and all bridges north of Tondiarpet and hence it took nearly 5 to 6 days for the accumulated flood in this region for the canal to drain. From the lagoon area a additional canal on the west of North Buckingham Canal had to be dug and also a short cut canal taking off from the 5/0 mileage from the eastern bank of the North Buckingham Canal and joining the sea near Thiruvottiyur had to be dug.
(xii) Earlier the Virugambakkam drain was flowing over a distance of 6.5 kms. and falling into Nungambakkam tank from which with a surplus entered into Cooum and Adyar rivers. Now, the entire course completely lost because of the urban development that had occurred in the 2 km stretch and the balance 4.5 kms. stretch was available. The course of the Koyambedu drain was also obliterated. The entire surplus was flowing towards north enter into narrow Arumbakkam drain and reaches Cooum river. In 1976, the submersion went up to the rooftop of some of the buildings and breached the causeway across Nelson Manikkam Road. Koyambedu surplus can be diverted northward into the Cooum directly for not only reducing the discharge into the Virugambakkam drain but also improving the chances of damage of the Koyambedu area, which requires the assured means of quick drainage. The Virugambakkam-Arumbakkam drain has to be improved.
(xiii) Surplus from Valasarawakkam to be intercepted by a drain proposed to be excavated from Arcot Road such that the surplus reach Ramapuram tank, from there it drains to Adyar river. Missing links in the drainage system to drain floodwaters from KK Nagar, Ashok Nagar and Jaffarkhanpet area have to be formed by acquiring lands to discharge floodwater to Adyar River.
(xiv) Two new tanks just above the Chembarambakkam tank had to be constructed to capture 1570 Mft3 of flood.
(xv) Adyar river has two arms. The northern arm comes from Chembarambakkam basin, joins with the southern arm coming from Guduvancheri, and joins at Tiruneermalai. In 1976, floods in the Adyar river were the worst ever
experience. For containing the flood and reducing the submersion to the minimum extent, flood banks have to be put up all along the banks of the river. Two causeways at Kathipara and Jaffarkhanpet had to be replaced by all weather bridge as a long-term measure.
(xvi) Masonry weir built long ago at a distance of 300m below the Maraimalai Adigal Bridge obstructing the normal flow and causing a pond for dhobis to wash clothes had to be removed.
(xvii) Mambalam drain is flowing at the heel of the erstwhile Mylapore tank. Kodambakkam High Road and the Mount road between Gemini and Nandanam were the tank bunds of the Mylapore tank. The drain starts from Prakasa Road flows in the T.Nagar and CIT Colony area crosses the Mount road and reaches Adyar near Teacher’s college. Improvements to these drains had to be carried out.
(xviii) Pumps must be permanently installed in the Kotturpuram area to drain floodwater since Adyar HFL is higher than the area.
(xix) Veeranam pipe crossing, which had been laid above the riverbed and below the MFL, was a potential source of scour in the Adyar river and it had to be dismantled and re-laid below the riverbed.
(xx) Kapalithottam, a slum, situated on the north of Greenways Road was a lowlying area originally connected the Adyar Backwaters. This area needs to be drained only by means of underground drainage system.
(xxi) It was possible to transfer 10,000-15,000 Cusecs from Adyar River into Covelong Valley by digging diversion channel either from a pond near Perungalathur or from a reach above Tambaram.
(xxii) Though South Buckingham Canal by itself experience high flood levels during monsoon, rain from local precipitation, it is not a flood carrier. The areas south of Adyar basin inside Madras City drain into the South Buckingham Canal and hence the problems in these areas were grouped under this basin. The flood from the developed area of Nangnallur, Velachery and Tiruvanmiyur normally travel southwards and get into the Pallikkaranai Lagoon, which gets drained by the river Covelong.
(xxiii) FTL of the Velachery Tank to be lowered by 1.2m and a new surplus course had to be provided.
(xxiv) Adambakkam drainage scheme had to be implemented reforming the old drains leading to the Adambakkam Tanks and cutting new drains to form the missing links to avoid flooding in the residential area of Nangnallur, Adambakkam, etc.
(xxv) In the Madras city, there were only major drains (Macro level) and hence the city had necessarily got to have internal drains connecting various parts of the City with the macro drains. Regarding the internal drains the city can be divided into the following reaches:
a) Coastal belt draining into sea directly
b) North Madras belt draining mainly into North Buckingham Canal for drainage relief
c) Hinterland between Cooum and Adyar river draining into Cooum and Adyar rivers
d) Southern area draining mainly into South Buckingham Canal
(xxvi) The Macro Drains and internal drains are mutually complementary and both are important. The master plan evolved by the Madras Corporation for internal drainage system has to be implemented fully.