7.51 For the purpose of planning Sewage System, the Metro Water has divided the CMA into four categories as Chennai City, adjoining urbanised areas classified as Adjacent Urban Areas (AUA), Distant Urbanised Areas (DUA) and Rural Areas. The AUA contiguous to Chennai City covers an area of 165 s q.km. with the 6 Municipalities (viz. (i) Alandur, (ii) Ambattur (iii) Avadi, (iv) Thiruvottiyur and (v) Madhavaram and (vi)
Manali two Municipal Townships (viz. (i) Kathivakkam and (ii) Thiruverkadu) 11 Town Panchayats (viz. (i) Chinnasekkadu, (ii) Maduravoyal, (iii) Nandambakkam, (iv) Pallikkaranai, (v) Perungudi, (vi) Porur, (vii) Puzhuthivakkam, (viii) Valasaravakkam, (ix) Kottivakkam, (x) Nerkundram and (xi) Ramapuram) and the Cantonment area.
7.52 The Distant Urbanised Areas (DUA) comprises 6 Municipalities (viz. (i) Pallavaram, (ii) Tambaram, (iii) Anakaputhur, (iv) Pammal, (v) Thiruverkadu, and (vi) Poonamallee) and five Town Panchayats (viz. (i) Minjur, (ii) Naravarikuppam, (iii) Chitlapakkam, (iv) Kundrathur, and (v) Mangadu).
7.53 Some local bodies like Alandur, Valasaravakkam and Thiruvottiyur have implemented the sewerage system in their municipal areas; others are in the process of providing a full-fledged sewerage system and by engaging consultants they have prepared detailed project reports. While formulating the sewerage proposals for the AUAs/DUAs by the consultants, the approval of the CMWSSB is sought for disposal of the sewage to the nearest STPs of Metro sewerage system since the local bodies could not locate the site for construction of STPs in their area to treat the sewage. Due to various reasons including scarcity of source of water, the STPs of Metro system could not realize the projected quantum of sewage immediately. It was found advantageous to dispose the sewage from the AUAs to the nearest STPs of Metrowater, where further capacity augmentation can be taken up in subsequent years.
7.54 The local bodies like Alandur, and Valasaravakkam have implemented the sewerage system in their areas with the contributions by the consumers and loan from the financial institutions.
7.55 Government in March 2005 has directed that Chennai Metropolitan water Supply and Sewerage Board shall be the Nodal Agency for execution, and maintenance of underground sewerage schemes in AUAs and DUAs in the Chennai Metropolitan Area. The Government have directed as follows:
(a) CMWSSB is required to develop proposals for execution of a comprehensive sewerage system for the entire Metropolitan Area in addition to existing sewerage system to Chennai by CMWSSB.
(b) CMWSSB may to the extent possible use the existing and the planned capacity in its sewerage treatment plants to treat the additional sewage load from AUAs and DUAs; and wherever necessary, additional treatment capacity has to be created.
(c) Funds for the project will be mobilised by the concerned local bodies, which will provide the same to CMWSSB.
(d) CMWSSB will execute the entire scheme including the internal sewering within local bodies and house service connection within these areas. The sewer system will also be maintained by CMWSSB for which the local bodies will be required to pay the fees, which shall be negotiated from local bodies with clear agreement.
(e) An important aspect of the proposed scheme will be the issue of public contribution and tariffs, since it will be difficult to have the different amounts prescribed by AUAs and DUAs with a common sewage management network and it will be desirable to have common tariff structure. The local bodies will collect sewerage charges and taxes internally. CMWSSB should include this aspect in the study proposed to be conducted.
(f) If and when the AUAs and DUAs are brought under the umbrella of a greater Chennai Corporation, the CMWSSB would collect charges directly from the consumers.
(g) Although CMWSSB should aim for the utilisation of existing and enhanced capacity in the 4 STPs, restricting the treatment facility to the existing STPs alone may involve considerable additional expenses on construction and maintenance since some local bodies like Avadi, Poonamallee and Tambaram are located at a distance of more than 15-24 km. Hence, it may be desirable to have one or two additional treatment plants of a similar capacity for these DUAs. This aspect can also be taken up in the preparation of Master Plan.
(h) Keeping in view the high costs, CMWSSB should consider a proper phasing for execution of the scheme.
(i) CMWSSB should quickly organise detailed study of coverage indicated above, principles of revenue generation and management of the facilities proposed.
7.56 The comprehensive sewerage system is in existence in (i) Alandur, (ii) Valasaravakkam, (iii) Thiruvottiyur (50% covered) and (iv) Ambattur (partially covered adjoining City limits). The local bodies have formulated proposals and got detailed project reports prepared by the consultants for provision of sewerage system, are (i) Pallavaram, (ii) Tambaram, (iii) Madhavaram, (iv) Kathivakkam, (v) Porur, (vi) Ullagaram Puzhudhivakkam, (vii) Avadi, (viii) Maduravoyal and (ix) Thiruvotriyur (Rehabilitation and Extension). For Pallavaram the work has been entrusted to CMWSSB and the works are expected to be completed by August 2007.
7.57 The local bodies which are not covered presently with the provision of sewerage system in their area, are (i) Ayanambakkam, (ii) Chinnasekkadu, (iii) Manali, (iv) Nandambakkam, (v) Pallikaranai, (vi) Perungudi, (vii) Kottivakkam, (viii) Nerkundram, (ix) Ramapuram, and (x) St. Thomas Mount Cantonment in the AUA, and (xi) Minjur, (xii) Naravarikuppam, (xiii) Chitlapakkam, (xiv) Anakaputhur, (xv) Pammal, (xvi) Thiruverkadu, (xvii) Kunrathur, (xviii) Poonamallee and (xix) Mangadu in the DUA.
7.58 CMWSSB has taken action to conduct studies with the following main objectives:
(i) to prepare Plans and programmes to link the existing/ongoing sewerage system of the local bodies,
(ii) integrating the system with CMWSSB sewerage system, and
(ii) to provide feasibility studies for providing sewerage system to unsewered local bodies.
7.59 The study will cover provision of sewerage system with treatment and disposal arrangements, including examination of reuse options with reference to the demand for such water, nearness to Sewage Treatment Plants etc. for the Adjacent Urbanised Areas and Distant Urbanised Areas in Chennai Metropolitan Area. Four local bodies are presently served by underground sewerage system and nine local bodies are in the process of providing underground services for which consultants were engaged for preparation of DPRs. The study will cover all these existing and proposed UG system to be integrated. The Phase-I study will cover the evaluation of the DPRs of sewerage system prepared by the consultants for the local bodies like: (i) Pallavaram, (ii) Tambaram, (iii) Madhavaram, (iv) Kathivakkam, (v) Porur, (vi) Ullagaram Phuzhudhivakkam, (vii) Avadi, (viii) Maduravoyal, (ix) Thiruvottiyur. The evaluation will cover the population projection in compliance with the CMDA projections, design criteria, treatment option of sewage, whether in a locally identified site or integrating with the available surplus capacity of the STPs of CMWSSB. The cost of conveyance of sewage to the STP of CMWSSB will be compared with the cost of treatment in a locally identified site. The possibility of reuse of treated wastewater to meet the demand by commercial establishments/factories and feasibility of recovering the costs of such treatment will be examined.
7.60 The Phase-II study will cover preparation of feasibility proposals for providing sewerage system to the remaining AUAs and DUAs viz. 19 local bodies and examining the quantum of sewage generation, updating the population estimates, finalising the design criteria in compliance with the system already provided in the other local bodies, preparation of outline scheme, preliminary cost estimates with alternative proposals, economic feasibility based on the alternate cost proposals for phasing of the investment and financial and administrative arrangement for implementation, operation and maintenance of the system. The study will also address the options on the issue of treating the sewage generation in a locally identified site or to integrate with the STP of CMWSSB and recommend the best available option.
7.61 The observation made in the Tenth Five Year Plan report is extracted below:
"It is infeasible to provide underground sewerage or septic tank latrines in the cities and for all residents. In the first place, highly urbanised, industrialised and densely populated urban centres may be provided with sewerage, with priority being given to installing sewage treatment plants to prevent pollution of water sources. For the majority of the urban centres, low cost sanitation is the appropriate technology.
Low cost sanitation is not a programme solely for the urban poor or slum population. It has to be propagated as the appropriate solution wherever the costly option of underground drainage is not feasible. In this sense, there is a need to offer more options to households that desires sanitation facilities which, while being based on the "twin-pit-pour-flush" model, is in keeping their needs and capacity to invest. Low cost sanitation is best propagated as a part and parcel of the maintenance of environmental health."
"Technologies for treatment of sewage are another area of concern. The conventional technologies require electricity, which has to be paid for. On the other hand, low cost technologies like ponds require large area of land that is not readily available in big towns and cities. There is a need to adopt intermediate technologies, of which there is a choice. Further research and development need to be done in this area."
7.62 As regards rest of CMA, while issuing Planning Permission for constructions of buildings, for sewage disposal from households septic tanks are insisted. In cases of larger developments such as special buildings (flats) and group housing upto 75 dwellings in a site septic tank with upflow filters are insisted with a condition that the upflow water shall be used for gardening purposes within the development site. For very large developments exceeding 75 dwelling units and multi-storeyed buildings, insitu sewage treatment plants (STP) are required to be provided and the treated water shall be used within the developed site for gardening purposes. This method of sanitation is followed for maintenance of environmental health in the rest of CMA areas where sewerage is not available.