5.09. Following a detailed feasibility study at a cost of Rs.5.4 m undertaken through Delhi Metro Rail Corporation (DMRC) GoTN have retained DMRC for preparing detailed project report at a cost of Rs.33 m for development of metro rail for Chennai for implementation during 2007- 2012. The gist of the DPR is as below:
Corridor-1: NH-45 (Airport) – Guindy – Sardar Patel Road – Kotturpuram High Road – Cenotah Road – Anna Salai – Gemini – Spencers – Tarapore Towers – Along Cooum River upto Rippon building – Central Station – Broadway (Prakasam Road) – Old Jail Road – Tiruvottiyur High Road (upto Tiruvottiyur).
Corridor – 2: Along Poonamallee High Road (Corporation limits) – EVR Periyar Salai – Rajaji Road (North Beach Road) covering Koyambedu – Anna Nagar Arch – Aminjikarai – Kilpauk Medical College – Egmore – Central-Fort-Beach.
| Description | Underground | Elevated | Total | |||
| Length (km) | No. of Stations | Length (km) | No. of Stations | Length (km) | No. of Stations | |
| Corridor 1 | 14.250 | 11 | 8.805 | 7 | 23.055 | 18 |
| Corridor 2 | - | - | 23.449 | 19 | 23.449 | 19 |
| Corridor 1 & 2 | 14.250 | 11 | 32.254 | 26 | 46.504 | 37 |
| Options | Corridors | Cost including taxes @ 2007 price Rs. in m |
| Option I (Recommended) | Corridor 1 (Underground from Washermanpet to Saidapet and remaining length up to Chennai Airport elevated) | 56890 |
| Corridor 2 (elevated) | 33430 | |
| Option II | Corridor 1 (underground) | 74080 |
| Corridor 2 (elevated) | 79780 |
Detailed Project Report on Hybrid Mono Rail System for Chennai, Metrail India Private Ltd., November 2004
5.10. A detailed project report undertaken by a consortium of Metrail India (p) Ltd. has established the feasibility for development of hybrid monorail system for Chennai for a length of 25 km comprising parts of Periyar EVR salai and Anna salai at a cost Rs.9470 m. It recommended implementation of the project over a period of 27 months. Since the same corridors are being considered subsequently for development of metro rail, the project has not so far been implemented.