2.02 The General Town Planning Scheme was prepared by the Madras Corporation and submitted to the then Madras State Government in 1957. The aim of the General Town Planning scheme was to provide for the organised growth of the then Madras City (129 Sq.km.). The Scheme was then remitted to the Directorate of Town Planning, Madras for technical scrutiny. The DTP after careful scrutiny of the scheme had recommended that more detailed and extensive studies in depth would have to be carried out before the scheme could be finalised. Then it was decided to prepare a comprehensive development plan for Madras Metropolitan Area and as a first step to prepare Madras Interim Plan (1967).
Madras Interim Plan (1967)
2.03 The Directorate of Town Planning had prepared the Madras Interim Plan in 1967. In the Plan, the problems of the City were viewed and appraised in the urban context of the urban area being the first of its kind; the Plan devoted itself purely to physical aspects of development and recommended that the fiscal plan should be separately worked out. It was also envisaged that the Master Plan would be in two stages viz. the preparation of an Interim General Plan in the first instance and Comprehensive Development Plan in the second.