Form-B (Part-A)
-
(I) Name of the applicant (II) Present address
-
Plot number and plan Name / Mohalla / Ward
-
Area of the block (in square meters)
-
Permissible use of the building
-
(I) Date of building map approval
(II) Permit number
(III) If automatically approved, details of the provision:
If information about rejection of building map is not given within the prescribed period from the date of submission of building map - attach the date of submission of map, receipt number and certified copy of the receipt.
- (I) If mitigation of unauthorized construction has been done, attach a copy of the mitigation map.
(II) Attach the date of payment of mitigation fee, receipt number and certified copy of the receipt.
- Construction status
| Serial number | Provision | Permissible | Construct | Accepted/Mitigateddeviation |
|---|---|---|---|---|
| 1 | 2 | 3 | 4 | 5 |
7.1 Soil cover (percentage)
7.2 F.A.R.
7.3 Set Bank (Distance in Meters) (a) Front (b) Behind (c) Left (d) Right
| Serial number | Provision | Permissible | Construct | Accepted/Mitigateddeviation |
|---|---|---|---|---|
| 1 | 2 | 3 | 4 | 5 |
7.4 (a) Basement area in square meter) (b) use of basement
7.5 Stilt Floor (a) area (b) use
7.6 Parking (Area in cm)
7.7 Height of building (in metres)
7.8 Number of floors
-
Firefighting related work (Enclose certificate of completeness of firefighting system from the Chief Fire Officer)
-
Features to be shown on map: (a) water supply (b) excretion (c) Drainage (d) Solar water plant (e) Electricity supply (f) Lift E l ifi f
( nc ose cert cate o completion of lift from Chief Electrical Inspector, Uttar Pradesh)
-
Garbage Chute (Yes/No)
-
In case of being situated in aviation area aviation lights (is/isn't)
-
Whether Rainwater harvesting system is installed or not (Attach certificate from licensed technical person) (Yes/No)
-
Internal change in Building-(a) under the byelaws (is/isn't) (b) If contrary to the byelaws, then yes/no (is/isn't) It has been extinguished. Yes No
It is certified that the above details are true to the best of my/our personal knowledge. There is no unauthorized construction under the applicable building byelaws which has not been mitigated. Therefore, completion certificate should be issued for the construction done on the said plot. Attachment Records:
- Signature of the applicant authorized for application 2. (including certificate of authorisation)
Date………
Note: - 1. The said information will be given only by the person authorized for the application. Certificate of authorization will be attached.
- Separate applications will have to be submitted for each block in the building complex.
Form-B (Part-B)
Certificate of Licensed Architect/Engineer
(for group housing/commercial and multi-storey buildings)
It is certified that the construction/reconstruction/alteration/addition work of the building number………. situated on the plot number….. Khasra number……. of Shri/Mrs. (Applicant's name) ………. was done under my supervision. All the information given above is correct. My statement in this context is as follows: -
The constructed building is as per applicable byelaws and approved map/approved mitigation map. Or
The deviation in the constructed building from the approved map or approved mitigation map is marked at number 7.
The building is suitable for the purpose for which it is constructed/renovated/altered. Its quality is of high class, and it is safe on the basis of structure. The building is completely suitable for habitation and is safe.
Therefore, it is recommended to issue completion certificate.
Signature: Licensed
Architect/Engineer………
| Signature...... | |
| ...... | |
| licensed technical person...... | |
| Name | |
| Address...... | |
| Registration number...... |
Date………………
Name/Address… Council of Architecture Registration/ Registration Number Period of Registration Validity…
Form-B (Part-C) Certificate of licensed technical person regarding rainwater harvesting (for group housing/commercial and multi-storey buildings)
Development of provision for rainwater harvesting (rooftop rainwater harvesting system) in the constructed building.
The building has been constructed as per the approved building plan/byelaws approved by the authority.
Form-B (Part-D)
Development Authority's comments and completion certificate:
(To be issued on photocopy of parts 'A', 'B' and 'C' of the application form)
The plot number……………. Shri …………. (designation)………… located in the Sambani Mejadar Mohalla sector of the Ward/Plan/Mohalla/constructed building …………….. has been taken over by the Development Authority and the construction work has been found correct as per the map approved by the Authority. Therefore, Uttar Pradesh Nagar Completion certificate issued as per Section 15A (2) of the Planning and Development Act 1973.
Signature ………
Designation ……
Seal of Office ………
Date……..